1st Assault Brigade Royal Engineers

1st Assault Brigade Royal Engineers
Active 1943–1945
Country Great Britain
Branch British Army
Type Engineers
Role Armoured Engineers
Size Brigade
Part of 79th Armoured Division
Engagements D DAY
Operation Infatuate
Operation Blackcock
Operation Plunder

The 1st Assault Brigade Royal Engineers was a specialisied armoured formation of the British Army active in World War II. It was formed in mid-1943 and its structure was three Assault Regiments of the Royal Engineers. It was assigned to the 79th Armoured Division in preparation for the Normandy invasion of 6 June 1944. The unit comprised armoured vehicles modified for specialist roles (also known as Hobart's Funnies), intended to assist with the landing phase of the operation.

History

Churchill AVRE with a bobbin.
Close-up of an AVRE's Petard Mortar.

By the end of October 1943, various engineer units had been renamed and transferred into the Brigade. This brigade comprised 3 Assault Regiments, each with 4 Assault Squadrons, plus an Assault Park Squadron. This structure remained unchanged up to the Normandy landings in June 1944.

The basic vehicle of the assault unit was the Armoured Vehicle Royal Engineers (AVREs). This was a Churchill tank with its turret modified or removed and to which were attached certain special equipments.

The Brigade was employed during the assault landings in Normandy, Operation Overlord and further used during the battle for the Roer Triangle (Operation Blackcock), the Rhine crossings (Operation Plunder) and the Elbe crossing.

Brigade Units

Main article: Royal Engineers

Equipment

D Day , Operation Overlord

Main article: Normandy Landings

Each of the three Infantry Divisions involved in the first assault on the British and Canadian front - Gold Beach, Juno Beach and Sword Beach - included two Assault Squadrons from 5 Assault Regiment and 6 Assault Regiment, Royal Engineers.

The objective of each pair of Assault Squadrons was to clear lanes across the beaches and to establish up to eight exits from the beaches onto the first inland road, suitable for tracked vehicles. Which involved removing beach obstacles which were exposed at low tide so that they were not a hazard as the tide rose. Disarming and removing mines and other explosive charges from these obstacles. Breaching the sea wall, where one existed, and creating and maintaining ramps and firm access routes through the soft sand above the high water line. Removing knocked-out vehicles which were obstructing these exits.

All this had to be done under fire from buildings on the seafront, and under mortar and artillery fire from further inland.

Each Assault Squadron was equipped with a number of Armoured Vehicles Royal Engineers (AVREs) - which were Churchill tanks, modified in various ways to suit the needs of Assault Engineers. In addition, the assault teams included a number of Sherman 'Crabs' from 30th Armoured Brigade, these were Sherman tanks, with a full-width, heavy duty, rotary chain flail mounted in front which destroyed any mines in its path, thus clearing the lanes up the beach.

Medics are attending to wounded in the shelter of a Churchill AVRE from 5th Assault Regiment, Royal Engineers - Sword Beach, 6 June 1944
Universal carriers with deep wading screens pass through Lion sur Mer. A Churchill AVRE can be seen in the background, 6 June 1944.

The AVREs then turned their attention to the first line of land defences, using their spigot mortars, and with self-propelled guns providing artillery support. More Sappers landed to continue the clearance of the beaches. All the time, infantry were moving through into the growing bridgehead.

Several exits were open within an hour of first landings, allowing the Armoured Brigades to start moving inland.

The Assault Regiments suffered their share of casualties. In some sectors, up to 50% of the flail tanks, AVREs and armoured bulldozers had been knocked out, with high casualties among the crews. But many of the objectives for D-Day had been achieved which may not have been the case without 1st Assault Brigade R.E..

After Normandy the Brigade was used in Operation Blackcock, Operation Infatuate and Operation Plunder.

Assault Engineers after the War

After the end of the Second World War, 79th Armoured Division was disbanded in August 1945. The remaining Assault Engineer Regiment was disbanded in July 1957 and briefly reformed as 32nd Armoured Engineer Regiment, in 1964 before a further reorganisation in 1969 reduced the Armoured Engineers to one squadron.

In 1980, 32 Armoured Engineer Regiment was again reformed and was the largest tank regiment in the British Army. The Regiment was the only unit equipped with specialist Sapper tanks and heir to the traditions of past assault and armoured engineers. The regimental crest includeded the bull's head device of 79th Armoured Division.

32 Armoured Engineer Regiment had three squadrons each of 4 troops, a total of 72 tanks. Each troop had 3 AVREs and 3 AVLBs (bridge layers). The AVRE has a wide range of capabilities including launching fascines (large pipe bundles) into anti tank ditches, laying trackway, clearing mines, dozing and destroying enemy strong points. The bridge layer can lay a scissor bridge over a gap up to 23m wide or a fixed bridge over smaller gaps up to 12m. The complete launching sequence takes less than five minutes. Larger gaps can be crossed using bridges in combination.

As of 2008 Engineer Regiments attached to Armoured or Mechanised Brigades in the British Army, have Armoured Engineer Squadrons included within their organisation.

See also

References

    Further reading

    External links

    This article is issued from Wikipedia - version of the Tuesday, December 22, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.