Amos-3
Mission type | Communication |
---|---|
Operator | Spacecom |
COSPAR ID | 2008-022A |
SATCAT № | 32794 |
Mission duration | 18 years (planned) |
Spacecraft properties | |
Manufacturer |
IAI Thales Alenia Space |
Start of mission | |
Launch date | 28 April 2008, 05:00 UTC |
Rocket | Zenit-3SLB |
Launch site | Baikonur 45/1 |
Contractor | Land Launch |
Orbital parameters | |
Reference system | Geocentric |
Regime | Geostationary |
AMOS-3, also known as AMOS-60 is an Israeli communications satellite operated by Spacecom. The satellite is powered by twin solar panels, and is based on the Israeli AMOS bus. It replaced AMOS-1 in geosynchronous orbit at 4°W. AMOS-3 carries fifteen Ku/Ka-band transponders, and is expected to have an on-orbit lifetime of 18 years.
It was launched atop the maiden flight of the Zenit-3SLB rocket, the first launch contracted by the Land Launch organisation.
The launch was originally scheduled to occur in 2007, and later March 2008, however this was delayed until 24 April 2008. The launch attempt on 24 April 2008 was scrubbed for "technical reasons".[1] This was later determined to be a problem with the erector/transporter system, which had failed to retract and move away from the rocket.
Amos 3 lifted-off from LC-45/1 at the Baikonur Cosmodrome at 08:00 UTC on 28 April 2008.[2]
See also
Notes
- ↑ "Spaceflight Now | Tracking Station | Worldwide launch schedule". Archived from the original on 9 May 2008. Retrieved 2008-04-24.
- ↑ "Haaretz.com; Video shows how AMOS-3 communications satellite was sent into orbit". Archived from the original on 1 May 2008. Retrieved 2008-04-28.
References
- Gunter Krebs (2008-04-09). "Amos 3 (Amos 60)". Gunter's Space Page. Archived from the original on 16 March 2008. Retrieved 2008-04-09.
External links
- International Media Switzerland Official provider's site
|
|