Agios Dimitrios Power Plant

Agios Dimitrios Power Station
Location of Agios Dimitrios Power Station in Greece
Country Greece
Location Agios Dimitrios, Kozani
Coordinates 40°23′38″N 21°55′30″E / 40.393757°N 21.925106°E / 40.393757; 21.925106Coordinates: 40°23′38″N 21°55′30″E / 40.393757°N 21.925106°E / 40.393757; 21.925106
Status Operational
Commission date 1984
Owner(s) Public Power Corporation of Greece
Thermal power station
Primary fuel Lignite
Cogeneration? yes
Power generation
Units operational 2 × 300 MW
2 × 310 MW
1×365 MW
Make and model Alstom
LMZ
Electrosila
Ansaldo
Thermal capacity 70 MW
Nameplate capacity 1,585 MW

Agios Dimitrios Power Station is a power plant located near Agios Dimitrios, Kozani, Greece, situated between the towns of Kozani and Ellispontos village. In terms of its location in relation to a metropolis, the plant lies 140 kilometres (87 mi) west of Thessaloniki, a major city in northern Greece.

The Agios Dimitrios Power Station is the largest of Greece's power plants, generating a total capacity of 1,600 MW from two 300 MW units (Units I and II), two 310 MW units (Units III and IV), and one 365 MW unit (Unit V).[1] In terms of physical size, the three flue gas stacks of the facility are 200 metres (660 ft) tall. The plant burns lignite extracted through opencast mining, a process undertaken at the Lignite Center of Western Macedonia, which is located in the Ptolemais-Amynteo region, the main coal mining area of Greece.

The station is owned by the Public Power Corporation (PPC).

Unit V

Unit V was added to the existing four units of the Agios Dimitrios plant to be connected to the 400 kV outdoor switchgear, to increase the supply energy to the Greek national transmission grid. It is a unit of 350 MW electric, plus 70 MW thermal for district heating purposes.

In 1993, PPC awarded the contract for the supply and installation of Unit V to the consortium of the companies Ansaldo GIE (consortium leader - Italy, at present (2008) Ansaldo Energia a Finmeccanica Company), Austrian Energy and Environment SGP/Waagner-Biro GmbH (Austria) and AEGEK (Greece).

Main steps of the contract execution were:

  • 6 kV initial electrification - August 1996
  • boiler first ignition - February 1997
  • unit first synchronization - May 1997
  • official opening - October 1997
  • commercial operation - December 1997

In May 1995, the Kozani area suffered an earthquake of 6.6 degrees on the Richter scale, which affected the progress of the work.

Contract and project management

The contract was signed on March 31, 1993, by Th. Xanthopoulos, PPC general manager, Vincenzo Vadacca Ansaldo, GIE managing director, Heinz Zaunschirm and Helmuth Palzer, A.E. & E./Waagner-Biro directors and John Triadafillou, AEGEK managing director.

For the contract performance phase, the management of the project was provided by a project team composed by Roberto Pisani as project director, appointed by the consortium leader Ansaldo GIE, and Klaus Zink and Costas Latsenere as project managers, appointed by A.E. & E. and AEGEK respectively. At the plant, Salvatore Brozzas and Giorgio Simoncin were appointed by the consortium leader as site and start-up managers interfacing with S. Spaniolas, the Unit V construction manager of PPC. Project activities were supported by Vincenzo Gaiaschi and Konstantinos Keramidas in the consortium office of Athens led by Giorgio Mazzoni. Ansaldo GIE, consortium leader, played also the role of plant architect engineer, assigning to Roberto Masi this duty as project engineer.

On October 18, 1997, the unit was officially opened with the presence of Costas Simitis Prime Minister of Greece, Enrico Pietromarchi Italian ambassador in Greece, Fabrizio Pignatelli Italian consul at Thessaloniki, and with other representatives of the Greek parliament and local authorities.

Scope of supply

Object of the contract between PPC and the Consortium was the design, engineering, manufacture, supply, transportation, installation, testing, putting in operation and delivery of one lignite-fired steam electric unit of 350 Mwe plus 70 MWth in the Agios Dimitrios plant, including the design, engineering, construction and supervision of the civil works.

The project included the following main equipment, systems and works:

Greek companies as Aspate, Mekasol, Metka e Rodax participated in the construction of the unit as subcontractors of the three consortium members.

Environment

Emission data

Greenhouse gas emissions
as verified by the EU Emission Trading Scheme (in tCO2e)
2008 2009 2010 2011 2012 2013 2014
11,803,191 12,919,320 14,292,671 14,228,640 14,732,181 13,105,386 11,810,688
Data: European Commission, 2015[2]

References

  1. Metso Automation (25 June 2007). "Metso Automation supplies new control systems for the Agios Dimitrios Power Station in Greece" (Web page). energycentral.com. CyberTech, Inc. Retrieved 23 March 2012.
  2. "Verified Emissions for 2014" (XLS). European Commission. 1 April 2015. Retrieved 2 April 2015.

External links

This article is issued from Wikipedia - version of the Thursday, March 31, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.