Alderton Tunnel
The Alderton Tunnel sits on the South Wales Main Line on a stretch of line between Swindon and Bristol Parkway. It is 506 yards long. It was opened on 1 January 1903 along with the line between Wootton Bassett and Badminton, that being the first section of the South Wales & Bristol Direct Line of the Great Western Railway.[1]
Building of the tunnel commenced at least two years before 1903 as the rise in railway workers boarding in Alderton village can be seen in the 1901 UK Census.
References
- ↑ MacDermot, E.T. (1931). History of the Great Western Railway, vol. II: 1863-1921. Paddington: Great Western Railway. p. 425. OCLC 55853736.
External links
Coordinates: 51°32′30″N 2°13′19″W / 51.54167°N 2.22194°W
This article is issued from Wikipedia - version of the Wednesday, October 15, 2014. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.