Altamont Corridor Express

Altamont Corridor Express

Altamont Corridor Express at Pleasanton Station
Overview
Owner San Joaquin Regional Rail Commission
Locale San Joaquin Valley
San Francisco Bay Area
Counties: San Joaquin, Alameda, and Santa Clara
Transit type Commuter rail
Number of lines 1
Number of stations 10
Daily ridership 3,700 weekdays
Website http://www.acerail.com
Operation
Began operation 1998
Operator(s) Herzog Transit Services
Reporting marks HTSX
Number of vehicles 6 locomotives
25 passenger cars
Train length 1 locomotive, 6-7 passenger cars
Technical
System length 86 mi (138 km)
Track gauge 4 ft 8 12 in (1,435 mm)
(standard gauge)
Top speed 79 mph (127 km/h)
System map

The Altamont Corridor Express (reporting mark HTSX; formerly the Altamont Commuter Express), also known as ACE (pronounced "ace"), is a commuter rail service in California, connecting Stockton and San Jose.

ACE is named for the Altamont Pass, through which it runs. The service began on October 19, 1998, with two trains each way, weekdays only. In November 2009, three trains a day each way began, and four trains a day in September 2012.[1] The 86-mile (138 km) route includes ten stops, with travel time about 2 hours and 10 minutes end-to-end. The tracks are owned by Union Pacific Railroad. ACE uses Bombardier BiLevel Coaches and MPI F40PH-3C locomotives. Service is managed by the San Joaquin Regional Rail Commission, and operations are contracted to Herzog Transit Services, using AAR assigned reporting marks HTSX.

As of 2008, average weekday ridership is 3,700.[2] ACE has explored the possibility of expanding on two lines—a Modesto-Sacramento line, and a Stockton-Pittsburg line.[3]

History and funding

Former ACE logo (pre 2013).

The Altamont Commuter Express (the original name) was established for San Joaquin County residents traveling to work in Santa Clara County. ACE trains are presently limited to morning departures from Stockton and return departures from San Jose in the afternoon. The trains were popular at first, then had to survive a severe drop in ridership due to the dot-com recession of 2002. Struggles with freight traffic interference and track reconstruction prevented the addition of a fourth train until September 2012.[1] The operation is funded by local sales taxes, with support from state and federal sources.[4]

ACE annual ridership[5]
Fiscal year passengers change
20122013 940,774 + 19.5%
20112012 786,947 + 9.6%
20102011 718,226 + 9.5%
20092010 655,890 - 17.7%
20082009 797,253 - 1%
20072008 805,257 + 13.7%
20062007 708,274 + 10.4%
20052006 641,693 0%
20042005 640,594 NA

Service began under the governance of the San Joaquin Regional Rail Commission Joint Powers Authority formed in 1997 by Alameda, San Joaquin, and Santa Clara counties. The present Rail Commission has of one member each from the San Joaquin and Alameda county boards of supervisors, one BART representative, and representatives of five cities. Cost sharing for capital projects, excluding stations, during the initial 36 months of service was determined by the ACE Authority on a case by case basis and approved by each of the member agencies. The initial purchase of rolling stock, construction of stations, and other start-up costs, amounting to some $48 million, were covered primarily by a San Joaquin County transportation sales tax approved several years earlier, along with state and federal funding. Cooperative services agreements with the Alameda County Congestion Agency and the Santa Clara Valley Transportation Authority spell out funding of operations, maintenance and capital improvements. Currently, station improvements are the responsibility of the county in which the station is located. ACE pays the owner of the right of way, Union Pacific Railroad, about $1.5 million per year; it also uses about four miles (6 km) of Caltrain track in San Jose.[6]

In Fiscal Year 2006-2007, a total of 675,000 ACE trips generated fare-box revenues of around US$4 million, about 30% of the $13.3 million operating and administrative cost. Most of the annual operating costs are underwritten by San Joaquin, Alameda, and Santa Clara counties in proportion to the boardings and alightings in each county. San Joaquin County funds its $2.32 million contribution from a half-cent transportation sales tax (30% of the tax adopted in 1990 and renewed in 2006 is allocated to bus, bicycle, rail, and pedestrian programs. The Alameda County Congestion Management Authority pays its $1.8 million share from its half-cent transportation sales tax (1.2% of its Measure B budget). Santa Clara County's $2.6 million share is paid by the Valley Transportation Authority, operator of the county's light rail and bus system, which also contributes about $1.5 million for shuttle services that take ACE commuters from train stops to job sites. Miscellaneous revenues, of some $2.5 million are supplied from federal and state grants, including Congestion Mitigation and Air Quality funds. Each county absorbs its own administrative costs, estimated at $2.4 million annually.

Stations and rail/shuttle connections

Connecting transit

Route

ACE Train 4, the 3:35 eastbound at San Jose with F40PH-3C 3106.

San Jose to Great America

The northbound train leaves San Jose's Diridon station and heads north on the main peninsula Caltrain tracks through the rail yards in Santa Clara, California. It now stops at the Santa Clara Station before moving on the Great America Station. As the train passes under De La Cruz Avenue it leaves the Peninsula tracks and heads north. The train passes over Central Expressway just west of De La Cruz near the end of the runway of San Jose International Airport. The train then passes over U.S. Route 101 and proceeds along Lafayette Street. It passes to the east of California's Great America, a large substation, and the San Francisco 49ers home Levi's Stadium before stopping at the Great America station under the Tasman Drive overpass.

Great America to Fremont

The train proceeds north along Lafayette Drive passing through a golf course and under Highway 237. It then turns north through the Alviso district of San Jose, passing just east of its abandoned marina. The train then heads out into the mudflats and sloughs of the bay. In the middle of the flats, the train passes through the sunken ghost town of Drawbridge. Next along the route are Cargill's (formerly Leslie's) salt evaporation ponds on both sides of the track where the train turns to the northwest. The train then passes a landfill before entering Newark, California. At Baine Avenue, the train makes a 90o right turn a few hundred yards (meters) from the point where the track from the historic Dumbarton rail bridge connects in. The journey continues northeast along Baine Avenue and crosses I-880. Just after crossing Fremont Boulevard, it arrives at the Fremont Amtrak station. A historic sign remains on the portion of the station to the south of the tracks. It refers to the city of Centerville, predating the city of Fremont, and includes the distance to both Ogden, Utah and San Francisco, with the distance to San Francisco calculated via the historic bridge.

Fremont to Pleasanton

ACE leaving Pleasanton station.

The train leaves the Fremont station and turns east-northeast to head towards Niles Canyon. It crosses under the BART tracks and heads along Alameda Creek, but it does not interconnect with BART. It then turns north to enter Niles Canyon. The narrow canyon contains two rail lines (one is now partially abandoned), Highway 84, Alameda Creek, and the Hetch Hetchy Aqueduct. The other rail line in the canyon was the route of the 1869 Sacramento-to-San Francisco Bay extension of the historic First Transcontinental Railroad and is now used by the Niles Canyon Railway. The train passes through a 0.75-mile (1.21 km) long tunnel which cuts off one of the canyon's horseshoes. This tunnel was modified from its original configuration to accommodate intermodal double-stack freight trains. However, this left the track in poor condition, causing the train to reduce speeds from 45 mph (72 km/h) to 25 mph (40 km/h) in the summer, and down to 10 mph (16 km/h) during the rainy season. The San Joaquin Regional Rail Commission plans to rehabilitate the tunnel as part of their 10-year service improvement plan. Eventually the train emerges into Sunol and heads north alongside I-680. It then passes through the center of Castlewood Country Club before pulling into the station in Pleasanton.

Pleasanton to Livermore

The train leaves the Pleasanton station and turns east-northeast, paralleling Stanley Boulevard. It travels along Stanley Boulevard between Heron Pond and the old quarries. It enters Livermore as it crosses Isabel Avenue, and turns more northwest as it crosses Murrietta Boulevard. It then stops in downtown Livermore. It then passes under First Street (formerly highway 84) and stops under Vasco Road near the northwest corner of Lawrence Livermore National Laboratory.

Livermore to Tracy

ACE climbing Altamont Pass.

The train then turns north at the edge of the hills and passes I-580. It then parallels Altamont Pass Road. The path of the original 1869 Sacramento-to-San Francisco Bay extension of the First Transcontinental Railroad can be seen on the right, and then on the left for several miles. The track is not there, but the bed and some markers remain. The train, now following tracks built for the Feather River Route, makes numerous turns as it ascends the Altamont Pass. A large quarry and several wind farms are visible. The route eventually turns south and then passes under westbound 580 and over eastbound 580. The entrances for a pair of short tunnels on the older route under the summit remain just east of the path. The train then descends from the pass in a southeasterly route before crossing under 580 a third time and over the California Aqueduct and the Delta-Mendota Canal before reaching the valley floor. The train then brushes Tracy, following Linne Road at the very southern edge of the city.

Tracy to Lathrop/Manteca

ACE between Tracy and Lathrop/Manteca.

The train passes under Interstate 5 before crossing the San Joaquin River. It then passes under Highway 120 and stops along the border between Lathrop and Manteca.

Lathrop/Manteca to Stockton

It then proceeds north past Sharpe Army Depot and into the final station in the southeast portion of downtown Stockton. The train frequently reaches top speeds just over 80 mph (129 km/h) on these relatively straight, flat routes.

Tickets and fares

ACE tickets are available at select stations and on ACE's web site. They are available in one way, round trip, 20 trip, weekly, and monthly passes. Fares are distance-based, ranging up to $11.75 for a one-way adult ticket (as of November 2011).

Future plans

In association with the California High Speed Rail Authority, plans are being generated to upgrade the current system to provide faster, more regular service.[7] This will be done gradually, starting with the ACEforward program that will include new track, stations, and possibly an extension to Modesto and Merced.[8]

Fleet

Model Number
F40PH-2C 3101-3105
F40PH-3C 3106
Bombardier BiLevel Coach 3201-3216
Bombardier BiLevel Cab Car 3301-3309

Incidents

March 2016 Derailment

On March 7, 2016, an ACE train was derailed by a fallen tree, according to initial reports, later updated to a mudslide in Niles Canyon[9] near Sunol, a rural area of Alameda County about 45 miles east of San Francisco. The front car plunged into the rain-swollen Alameda Creek. Fourteen passengers were injured, but there were no fatalities.[10]

See also

References

  1. 1 2 "ACE Train Schedule". Retrieved 2013-01-09.
  2. American Public Transportation Association, Commuter Rail Transit Ridership Report, Third Quarter 2008.
  3. Report. ACE. Retrieved on 2008-07-22 from http://www.acerail.com/about-ACE/rfp/rfp-introduction.htm.
  4. "Draft ACE Short Range Transportation Plan, Fiscal Year 2006-07 -- 2016" (PDF). Archived (PDF) from the original on 2008-10-30. Retrieved 2008-09-25.
  5. "Commuter Rail Ridership by Fiscal Year 2009-2014" (xlsx). California Department of Transportation. Retrieved 2016-03-10.
  6. Van Hattem, Matt (30 June 2006). "Altamont Commuter Express: The commuter rail service linking San Jose and Stockton, Calif.". Trains. Retrieved 2013-01-09.
  7. "SJRRC Refreshes ACE Brand with new Logo". Mass Transit. 10 December 2012. Retrieved 2013-01-10.
  8. ACE rail Notice of Preparation June 2013
  9. "14 hurt as commuter train derails -- no ACE service Tuesday". SFGate.com. Retrieved 2016-03-08.
  10. "Fallen Tree Derails Train in California; At Least 9 Injured". New York Times. Retrieved 2016-03-08.

External links

Route map: Bing / Google

Wikimedia Commons has media related to Altamont Commuter Express.
This article is issued from Wikipedia - version of the Tuesday, April 12, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.