Bandaraya LRT Station
ST6 Bandaraya LRT Station Stesen LRT Bandaraya 市政局轻快铁站 பண்டறைய | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Ampang Line rapid transit station | |||||||||||
Location |
Jalan Raja Laut 50350 WP Kuala Lumpur | ||||||||||
Coordinates | 3°9′20″N 101°41′39″E / 3.15556°N 101.69417°E | ||||||||||
Owned by | Syarikat Prasarana Negara | ||||||||||
Operated by | RapidKL | ||||||||||
Line(s) | Ampang Line | ||||||||||
Platforms | Side | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 2 | ||||||||||
Parking | Not available | ||||||||||
Other information | |||||||||||
Station code | ST6 | ||||||||||
History | |||||||||||
Opened | December 16, 1996 | ||||||||||
Services | |||||||||||
|
Bandaraya LRT station is an elevated rapid transit station in central Kuala Lumpur, Malaysia. The station is on the Ampang Line (originally known as Star, and later the Ampang and Sri Petaling Lines). The station was opened on 16 December 1996, as part of the first phase of the Star system's opening, along with 13 adjoining stations along the Sultan Ismail to Ampang route.
The station stands between the eastern banks of the Gombak River and an intersection between Jalan Raja Laut, a major thoroughfare along the Gombak River, and Jalan Isfahan. The station is the southernmost Ampang Line station along the Gombak River. The station is also within close proximity of several shopping complexes, the present Kuala Lumpur City Hall building, the Bank Negara headquarters, and Little India Precinct.
The station is some 140 m from the Bank Negara station, a KTM Komuter station, to which it is linked by a footbridge. It was the first station on the line to have an interchange with another railway system and, prior to the opening of Kelana Jaya Line and remaining phases of the Star lines, the only station of this kind, although there was no network integration in terms of fares or ticketing. Bandaraya is also close to bus stops along Jalan Raja Laut, Jalan Dang Wangi and Jalan Tuanku Abdul Rahman.
Station layout
The station is a typical elevated Ampang Line station, the platform level is on the topmost floor, consisting of two sheltered side platforms along a double tracked line; there is a single concourse housing ticketing facilities between the ground level and the platform level. The design is similar to that of most other stations on the line, with multi-tiered roofs supported by latticed frames, and white plastered walls and pillars. All levels are linked by stairways and escalators.
L2 | |||
Platform 1 | Ampang Line towards ST11 Sentul Timur (→) | ||
Platform 2 | Ampang Line towards AG8 Ampang or PH8 Sri Petaling via AG1 ST1 PH1 Chan Sow Lin (←) | ||
L1 | Concourse | Faregates, Ticketing Machines, Station Control, Shops, Footbridge to Bank Negara Komuter station | |
G | Street Level | Jalan Raja Laut |
Gallery
|
See also
Wikimedia Commons has media related to Bandaraya LRT Station. |
|