CSR SDD7
A Trenes Argentinos CSR SDD7 on the San Martín Line | |||||||||||||||
| |||||||||||||||
| |||||||||||||||
| |||||||||||||||
|
The CSR SDD7 is a 2,249 hp diesel-electric locomotive manufactured by CSR Corporation Limited from 2013 onwards for use in Argentina by Trenes Argentinos, a subsidiary of Ferrocarriles Argentinos. On the San Martín Line in Buenos Aires, 24 of these locomotives are used, making up the entire rolling stock of the commuter rail line.[1]
Technical specifications
The locomotive has one conductor's cabin on each end, connected by an internal corridor. Its total weight is 114 tonnes with a maximum weight per axle of 19 tonnes. The 3516B engine is manufactured by Caterpillar and generates 1678 kW, with the locomotive having a maximum speed of 120 km/h. Each axle has an independent traction motor, which are controlled by two microprocessors.[2]
Each locomotive has a 6000-litre fuel capacity, carries 420 kg of lubricants, 800 litres of water and 400 kg of sand in its sandboxes.
Usage
In Argentina, the locomotives are used exclusively for the San Martín Line of the General San Martín Railway. Despite there being plans for electrification, the 24 trains make up the entirety of the line's rolling stock. During the integration of this new rolling stock, the stations on the lines were also modernised and restored.[3] As of 2015, the electrification of the line is being considered, which would mean the rolling stock would be moved elsewhere.[4]
Gallery
-
CSR train arriving in Devoto station
-
Locomotive doing maneuvers in Cabred
-
A train arriving at Olivos station
-
Train leaving Devoto station
-
Bicycle carriage in one of the trains
-
A train in the outskirts of Buenos Aires
See also
- Rail transport in Argentina
- CNR CKD8
- CSR EMU (Argentina)
- Trenes Argentinos
- Ferrocarriles Argentinos (2015)
References
- ↑ "First CSR cars arrive in Buenos Aires". Railway Gazette. 6 March 2013.
- ↑ "SDD7 Diesel Locomotive". CSR. 22 January 2014.
- ↑ "Los nuevos trenes chinos en el San Martín". La Nación (in Spanish). 26 October 2013.
- ↑ "China realizará el estudio de factibilidad para electrificar la línea San Martín". Sala de Prensa de la Republica Argentina (in Spanish). 9 September 2015. Archived from the original on 13 September 2015.
Wikimedia Commons has media related to CSR SDD7. |