Campos Novos Dam

Campos Novos Dam
Location of Campos Novos Dam in Brazil
Official name Barragem de Campos Novos
Location Campos Novos, SC, Brazil
Coordinates 27°36′15″S 51°19′35″W / 27.60417°S 51.32639°W / -27.60417; -51.32639Coordinates: 27°36′15″S 51°19′35″W / 27.60417°S 51.32639°W / -27.60417; -51.32639
Construction began August 2001
Opening date July 2006
Construction cost US$671 million
Operator(s) Enercan
Dam and spillways
Type of dam Rock-fill dam
Impounds Canoas River
Height 202 m (663 ft)
Length 600 m (2,000 ft)
Power station
Installed capacity 880 MW (1,180,000 hp)

The Campos Novos Dam (also known as Barragem de Campos Novos locally) is a hydroelectric dam in the Santa Catarina state in southern Brazil. In 2006, at 200 metres (660 ft) dam height, it was regarded as the third highest dam of this type (concrete-faced rock fill dam or CFRD) in the world, but, in June 2006, the water which it held back ran out following a break in the dam wall.

Built at a cost of $671 million USD, it is located on the Canoas River, Brazil. It is part of a hydro-electric complex intended to provide 880 MW (1,180,000 hp). A second dam is below this one, and together they can hold a little more than 2 cubic kilometers of water.

Ownership and construction

Campos Novos' 35 years build and operate concession was awarded in 1998. It is owned by Campos Novos Energia S.A. ("Enercan"), a consortium made up of Brazilian power company CPFL Energia (formerly Companhia Paulista de Força e Luz) with 48.7%, Brazilian aluminum maker Companhia Brasileira de Aluminio ("CBA") with 22.7%, metallurgy company Companhia Niquel Tocantins ("CNT") with 20%, state-controlled companies Companhia Estadual de Energia Elétrica ("CEEE") with 6.5% and Centrais Elétricas de Santa Catarina S.A. ("Celesc") with 2%.

The dam builder was a consortium led by Brazilian construction company Camargo Corrêa and engineering consultants Engevix. Funding is by the Inter-American Development Bank and state-owned Brazilian Development Bank.

Cracks

A major break caused the water to begin to run out, after a tunnel collapsed on 20 June 2006. The exact reasons for the cracking were unknown in July 2006, however it has been revealed that patches were begun on another tunnel in October 2005 before the recent tunnel failure.[1][2]

Since the dam failure, a full inquiry for the reasons behind the cracks has been done, and a time-line of the dam's progression towards failure has been completed.[3] Following this discovery, hidden by the partners of the project, it appeared that these companies had maltreated the local populations. An investigation into the human rights violations was launched by United Nations Organisation.[2]

Camargo Corrêa re-plugged the tunnels in November 2006 and the reservoir was refilled by 1 March 2007. The last of the three generators went on-line on 30 April 2007.

Gallery

See also

References

External links

This article is issued from Wikipedia - version of the Thursday, February 18, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.