Pavement milling

Asphalt road being milled in preparation for repaving

Pavement milling (cold planing, asphalt milling, or profiling) is the process of removing at least part of the surface of a paved area such as a road, bridge, or parking lot. Milling removes anywhere from just enough thickness to level and smooth the surface to a full depth removal. There are a number of different reasons for milling a paved area instead of simply repaving over the existing surface.

Purpose

Recycling of the road surface is one of the main reasons for milling a road surface. Milling is widely used for pavement recycling today, where the pavement is removed and ground up to be used as the aggregate in new pavement.[1] For asphalt surfaces the product of milling is reclaimed asphalt pavement (RAP), which can be recycled in the asphalt hot mix asphalt (pavement) by combining with new aggregate and asphalt cement (binder) or a recycling agent.[1] This reduces the impact that resurfacing has on the environment.

Milling can also remove distresses from the surface, providing a better driving experience and/or longer roadway life. Some of the issues that milling can remove include:[2]

It can be also be used to control or change the height of part or all of the road. This can be done to control heights and clearances of other road structures such as: curb reveals, manhole and catch basin heights, shoulder and guardrail heights, and overhead clearances.[2] It can also be done to change the slope or camber of the road or for grade adjustments which can help with drainage.[7]

Specialty

Modified roto-mill head for dowel bar retrofit
Dowel bar retrofit slots after the milling

Specialty milling can be used to form rumble strips which are often used along highways.[8] Using milling instead of other methods, such as rolling them in, means that the rumble strips can be added at any time after the road surface has hardened.[8]

Another example is to modify the roto-milling head to create slots in concrete slaps for the dowel bar retrofit process. The typical process is to saw cut and jackhammer out the slots for the dowels. Following dowel placement, the slots are then typically backfilled with a non-shrink concrete mixture, and the pavement is diamond-ground to restore smoothness. This special milling process shortens the time to create slots from the traditional method which is labor-intensive.[9]

Types

The Asphalt Recycling and Reclaiming Association has defined five classes of cold planing that the Federal Highway Administration has recognized. The classes are:

Process and Machinery

Asphalt Milling Machine

Milling is performed by construction equipment called milling machines or cold planers. These machines use a large rotating drum removing and grinding the road surface. The drum consists of scrolls of tool holders.[2] The scrolls are positioned around the drum such that the ground pavement is moved toward the center and can be loaded onto the machines conveyor belt.[2] The tool holders can wear out over time and can be broken while milling if highway structures like manholes are encountered while milling.[2]

The tool holders hold carbide cutters on the drum.[2] The cutters can be removed and replaced as they wear out. The amount of wear (and therefore the interval between replacement) varies with the type and consistency of the material being milled; intervals can range between a few hours to several days.[2]

The drum is enclosed in a housing/scrapper that is used to contain the milled material to be collected and deposited on the conveyor.[2] The spacing of the tool spirals around the drum affect the end surface of the road, with micro-milling having the tightest spacing.[2]

The majority of milling machines use an up-cut setup which means that the drum rotates in the reverse direction to the drive wheel or tracks.[10] The speed of the rotating drum should be slower than the forward speed of the machine for a suitable finished surface.[2]

Modern machines generally use a front loading conveyor system that have the advantage of picking up any material that falls off the conveyor as milling progresses.[1] Water is generally applied to the drum as it spins, because of the heat generated during the milling process. Additionally, water helps control the dust created.[2] In order to control the depth, slopes, and profile of the final milled surface many millers now have automatic depth control using lasers, string-lines, or other methods to maintain milled surfaces to ±5 mm (0.20 in) of the target height.[7]

Pavement milling drums

Micro milling

Micro milling is also known as carbide grinding. It is a lower cost alternative to diamond grinding of pavement.[2] Micro milling uses a specialty drum with three to four times as many cutting teeth than a standard milling drum.[11] Micro milling can be used either as the final surface[12] or as a treatment before appling a thin overlay.[11] Micro milling can be used to remove many of the same distresses that standard milling can remove, although usually to a shallower depth.[12] A micro milled surface has a uniform finish with reduced road noise compared to standard milling.[2]

References

  1. 1 2 3 4 "Pavement Recycling Guidelines for State and Local Governments Participant's Reference Book". United States Department of Transportation - Federal Highway Administration. Retrieved 22 November 2013.
  2. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 "Cold Planing" (PDF). Asphalt Reclaim & Recycling Association. Retrieved 22 November 2013.
  3. "Raveling". Pavement Interactive. Retrieved 22 November 2013.
  4. Lawson, William. "Maintenance Solutions for Bleeding and Flushed Pavements" (PDF). Texas Department of Transportation. Retrieved 22 November 2013.
  5. 1 2 "Asphalt Pavement Distress Summary". asphalt Institute. Retrieved 22 November 2013.
  6. WSAV Staff; Liz Buckthorpe; Will Nunley; Ansley Christian (22 November 2013). "3 Brothers Dead In Crash; Tanker Explosion". WSAV. Retrieved 23 November 2013.
  7. 1 2 "Cold Planing" (PDF). Pavement Work Tips. Australian Asphalt Pavement Association. July 1997. Retrieved 22 November 2013.
  8. 1 2 Butler, Kendal (2013-06-19). "Rumble strips keep drivers on the road". Asphalt: The Magazine of the Asphalt Institute. Retrieved 26 November 2013.
  9. "OKDOT Combines Pavement Rehabilitation Techniques". Research & Technology Transporter (Federal Highway Administration). October 1999.
  10. Better Roads Magazine. "COLD PLANING STUDY". Asphalt Recycling & Reclaiming Association. Better Roads Magazine.
  11. 1 2 Brown, Dan (Spring 2012). "Fine-Mill Pavements for Smooth Thin Overlays". Pavement Preservation Journal 5 (3): 27. Retrieved 29 November 2013.
  12. 1 2 Wisdom, Brooke. "The Power of Milling". Better Roads. Retrieved 29 November 2013.
Wikimedia Commons has media related to Cold milling machine.
This article is issued from Wikipedia - version of the Tuesday, November 24, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.