Crystal Springs Dam

Crystal Springs Dam
Official name Lower Crystal Springs Dam
Location San Mateo County, California
Coordinates 37°31′43″N 122°21′44″W / 37.5285°N 122.3622°W / 37.5285; -122.3622Coordinates: 37°31′43″N 122°21′44″W / 37.5285°N 122.3622°W / 37.5285; -122.3622
Opening date 1888
Operator(s) San Francisco Public Utilities Commission
Dam and spillways
Impounds San Mateo Creek
Height 140 ft (43 m)
Length 600 ft (180 m)
Width (base) 40 ft (12 m)
Reservoir
Creates Lower Crystal Springs Reservoir
Total capacity 57,910 acre·ft (71,430,000 m3)
Catchment area 29.4 sq mi (76 km2)
Surface area 1,323 acres (5.35 km2)

Crystal Springs Dam is a gravity dam constructed across the San Mateo Creek, impounding water to form the Lower Crystal Springs Reservoir in San Mateo County, California. It was among the first concrete gravity dams built in the western United States.[1]

The structure was completed in 1888, and has survived both the 1906 San Francisco earthquake and the 1989 Loma Prieta earthquake — despite its location directly on the San Andreas Fault. The designer was Hermann Schussler, Chief Engineer of the Spring Valley Water Company. The dam was constructed by using large blocks poured separately, and allowed to set before adjoining blocks were poured. The unique feature of this dam is the fact that none of the horizontal or vertical joints match up. Schussler was also very demanding that the concrete be batched in the exact proportions of his mix design. Although this dam was erected about 100 yards east of the San Andreas fault line and was subject to severe shaking it survived relatively undamaged.[2]

The dam has a road running over it and forms the trailhead of the popular Sawyer Camp Trail. The roadway on top of the dam is closed.

The San Francisco Public Utilities Commission began the process of renovating the dam in 2003. A major step in the renovation process, doubling the width of the main spillway and raising the dam to increase the water storage capacity, was completed in 2012. The renovations, which are intended to improve the reliability of the system in the event of an earthquake, are on schedule to be completed in 2016.[3]

See also

References

  1. Advanced Dam Engineering for Design, Construction, and Rehabilitation, by Robert B. Jansen, page 117
  2. Advanced Dam Engineering for Design, Construction, and Rehabilitation, by Robert B. Jansen, page 117
  3. "Crystal Springs Dam improvements completed". The Almanac. 17 Apr 2012. Retrieved 24 February 2015.

Further reading

External links


This article is issued from Wikipedia - version of the Thursday, February 18, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.