Dubrava Hydroelectric Power Plant

Dubrava Hydroelectric Power Plant

Dubrava Hydroelectric Power Plant - east view
Official name Hidroelektrana Dubrava
Country Croatia
Location Donja Dubrava, Međimurje County
Coordinates 46°19′00″N 16°45′00″E / 46.31667°N 16.75000°E / 46.31667; 16.75000Coordinates: 46°19′00″N 16°45′00″E / 46.31667°N 16.75000°E / 46.31667; 16.75000
Owner(s) Hrvatska elektroprivreda
Operator(s) Hrvatska elektroprivreda

Dubrava Hydro Power Plant is a large power plant in Croatia that has four turbines with a nominal capacity of 21 MW each[1] having a total capacity of 84 MW.

The power plant uses Lake Dubrava as its reservoir and was completed in 1989. It is located near the village of Sveta Marija in Međimurje County, not far from Donja Dubrava municipality seat, on the county's border with Varaždin County. The reservoir is also divided between the two counties.

It is operated by Hrvatska elektroprivreda.[2]

External links


This article is issued from Wikipedia - version of the Monday, January 18, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.