E-Ship 1

E-Ship 1 at Cassens Werft shipyard
History
Name: E-Ship 1
Owner: Enercon
Builder:
Launched: 2 August 2009[1]
Completed: 6 August 2010
Status: in active service, as of 2010
General characteristics
Tonnage: 10,500 DWT
Length: 130 m (426 ft 6 in)
Beam: 22.5 m (73 ft 10 in)
Draught: 6 to 9 m (20 to 30 ft)
Installed power: Two diesel engines (2 × 3.5 MW)
Propulsion:
  • Four Flettner rotors
  • Two propellers
Speed: Max 17.5 knots (32.4 km/h; 20.1 mph)
Capacity: 3 holds below deck, 20,580 m³
Notes: Special classification: Germanischer Lloyd

The E-Ship 1 is a RoLo cargo ship that made its first voyage with cargo in August 2010. The ship is owned by the third-largest wind turbine manufacturer, Germany's Enercon GmbH. It is used to transport wind turbine components. The E-Ship 1 is a Flettner ship: four large rotorsails that rise from its deck are rotated via a mechanical linkage to the ship's propellers. The sails, or Flettner rotors, aid the ship's propulsion by means of the Magnus effect – the perpendicular force that is exerted on a spinning body moving through a fluid stream.

Building history

The hull of E-Ship 1 was built by German shipbuilder Lindenau Werft in Kiel. The ship's launch took place on August 2, 2008, with the delivery date estimated for the first half of 2009. In September 2009, Lindenau-Werft declared insolvency. On January 25, 2009, it was announced that E-Ship 1 would be towed to and completed by German shipyard Cassens Werft in Emden.

Steel construction work was completed in 2010, and the ship was docked at North Sea Works, where final construction took place with the ship in the water. In April 2010, the E-Ship 1 returned to Cassens Werft, where preparations were made for sea trials. The ship set off for a first sea trial from Emden to Bremerhaven on 6 July 2010.[2] Three trial runs were completed until the end of July.[3] The ship made its first voyage with cargo in August 2010, carrying nine turbines for Castledockrell Wind Farm from Emden to Dublin, Ireland.[4]

Structure

The ship's bridge is located at the bow, and has three decks and two port-related long-boom cranes with payload capabilities of 80 and 120 tonnes. The ship has a rear ramp, and can function as a RoLo cargo ship. The vessel is 130 meters in length and 22.5 meters wide, with tonnage 12,800 dwt gt/10,000 approx. It is equipped with fore and aft maneuvering thrusters and has an Ice class GL E3 hull rating.

Propulsion and machinery

E-Ship 1 with Flettner rotors mounted

The E-Ship 1 is equipped with nine Mitsubishi marine diesel engines with a total output of 3.5 MW. The ship's exhaust gas boilers are connected to a Siemens downstream steam turbine, which in turn drives four Enercon-developed Flettner rotors. These rotors, resembling four large cylinders mounted on the ship's deck, are 27 meters tall and 4 meters in diameter.

Published performance information

Performance results for the ship (including sea-keeping and wind power) was published by Enercon on 23 Sept 2013. ( see STG_Ship_Efficiency Reference paper (Enercon Publication) in the External Links)

References

  1. Stapellauf S 285 - YouTube
  2. "Enercon-Schiff unternimmt erste Probefahrten" (in German). General-Anzeiger. 2010-07-07. Retrieved 2010-08-24.
  3. "E-Ship 1 zurück in Emden" (in German). Enercon. 2010-07-29. Retrieved 2010-08-24.
  4. "State-of-the-art cargo ship to dock with haul of wind turbines". siliconrepublic. 2010-08-10. Retrieved 2010-08-24. External link in |publisher= (help)