Furka Cogwheel Steam Railway

Furka Cogwheel Steam Railway
Dampfbahn Furka-Bergstrecke

The Furka Cogwheel Steam Railway

The Furka Cogwheel Steam Railway
Overview
Type Heavy rail
Status Open
Locale Uri / Valais, Switzerland
Termini Realp
Oberwald
Stations 6
Services 1
Website Furka Cogwheel Steam Railway (English)
Operation
Opened 1925
Closed 1981
Reopened 1992
Owner Verein Furka-Bergstrecke
Operator(s) Verein Furka-Bergstrecke
Character Heritage railway
Depot(s) Realp
Technical
Line length 17.838 km (11.084 mi)
Track gauge 1,000 mm (3 ft 3 38 in) metre gauge
Highest elevation 2,160 m (7,090 ft)
Maximum incline 3.5% (adhesion)
11.8% (rack rail)
Rack system Abt
Route map
Legend
0.000 km Realp DFB 1,546 m above the sea
Connecting line to MGB
0.150 km Realp Depot
Schweigstrasse
Wilerbrücke70 m
Alt Senntumstafel-Tunnel III80 m
Alt Senntumstafel-Tunnel II79 m
Alt Senntumstafel-Tunnel I36 m
Steffenbachtobelbrücke37,5 m
3.660 km Tiefenbach 1,849 m above the  sea
Steinstafelviadukt54 m
Sidelenbachbrücke26 m
6.996 km Furka 2,163 m above the  sea
Furka Summit Tunnel1,874 m
Cantonal border Uri/Valais
9.206 km Muttbach-Belvédère 2,120 m above the  sea
Muttbach railway crossing
Gletsch 2 railway crossing
12.891 km Gletsch 1,762 m above the  sea
Gletsch 1 railway crossing
Gletsch-Kehrtunnel578 m
Rottenviadukt25 m
Lammenviadukt86 m
Räterisbachbrücke22 m
Line to Furka Base Tunnel
17.838 km Oberwald 1,366 m above the  sea

The Furka Cogwheel Steam Railway (Dampfbahn Furka-Bergstrecke, DFB in German) is a largely volunteer operated heritage railway which operates a partially rack and pinion-operated line across the Furka Pass, between Realp in Uri and Oberwald in Valais. Culminating at 2,160 metres above sea level, it is an old mountainous section of the Furka-Oberalp-Bahn (FO) that was abandoned after the construction of the Furka Tunnel.[1] It has been gradually brought back into service by the Verein Furka-Bergstrecke with the use of only steam locomotives, with the entire line completed in 2010.[2] The Furka Railway is the second highest rail crossing in Europe, after the Bernina Railway. The Uri side of the line also constitutes the highest railway in Central Switzerland.

At the Steinstafel bridge
Rotary snowplow at the Steffenbach bridge

The section of line was always a severe operational difficulty for the FO as its high altitude rendered it impassable due to snow and ice for much of the winter season, hence it being abandoned and a tunnel constructed.[3] This has remained a headache for the DFB, as every year it must be closed down and then reopened, an expensive process which involves the removal and replacement of a specially folding transportable bridge that would otherwise be damaged by the snow every year.[4]

The rebuilding of the line has also not been without new difficulties. Requiring to cross a busy main road on a rack operated section, the rack over the road is retractable, actuated to raise at the same time as the level crossing barriers by radios fitted to the line's locomotives.[5] Another section, running through a forested nature reserve, has had to be fitted with a sprinkler system that operates before and after trains pass, again actuated by the radios aboard. Relays allow the system to cascade up or down the section in line with the train, to save water which is supplied by natural water supplies near the summit of the line.[6]

Current and Future Plans

The organisation is currently restoring 2 HG 4/4 "D" Steam Locomotives. These 0-8-0 locos were built in Switzerland for use in Vietnam, and were repatriated along with locomotives from the Furka-Oberalp-Bahn that had been exported to Vietnam after their use in Switzerland.[7] The organisation is currently endeavouring to raise approximately Swiss Fr. 1,700,000, or 1,200,000 Euro or 1,200,000 US Dollars for the work required. The test runs of one of the locomotives are planned for 2013, to assess their suitability for the Furka line. The cost of a new firebox, one of the components the HG 4/4s require, is about Swiss Fr. 110,000, or 80,000 Euro.

Another current project is the restoration of a steam-powered rotary snowplough to deal with the heavy snowfall that needs to be cleared from the route before services can commence each year.[8] This may provide a lucrative opportunity as photographers and film-makers from across Europe and the world will be keen to capture such clearances on camera.

The fundraising foundation Stiftung Furka - Bergstrecke (Furka Mountain Line Foundation), which is separate to the operating company, is providing for the reconstruction of the 2 HG 4/4 locomotives and to develop the line's depot at Realp. The foundation provides investment for equipment and construction on the line generally.

See also

External links

Media related to Furka Cogwheel Steam Railway at Wikimedia Commons

References

  1. Lambert, A., By steam to the Rhone's source, in Steam Railway Magazine Issue 404, July 2012, p.86
  2. Lambert, A., By steam to the Rhone's source, in Steam Railway Magazine Issue 404, July 2012, pp.86-7
  3. Lambert, A., By steam to the Rhone's source, in Steam Railway Magazine Issue 404, July 2012, p.86
  4. Lambert, A., By steam to the Rhone's source, in Steam Railway Magazine Issue 404, July 2012, p.88
  5. Lambert, A., By steam to the Rhone's source, in Steam Railway Magazine Issue 404, July 2012, p.87
  6. Lambert, A., By steam to the Rhone's source, in Steam Railway Magazine Issue 404, July 2012, p.87
  7. Lambert, A., By steam to the Rhone's source, in Steam Railway Magazine Issue 404, July 2012, p.88
  8. Lambert, A., By steam to the Rhone's source, in Steam Railway Magazine Issue 404, July 2012, p.89

Coordinates: 46°33′41″N 8°21′43″E / 46.56139°N 8.36194°E / 46.56139; 8.36194

This article is issued from Wikipedia - version of the Sunday, April 17, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.