Port of Geelong

Geelong Port

The Bulk Grain Pier and grain elevator at North Geelong
Location
Country Australia
Location Geelong
Details
Owned by Asciano
Type of harbor Artificial
Available berths 9
Operations & Security Manager Ken Stanley
Website
www.geelongport.com.au

The Port of Geelong is located on the shores of Corio Bay at Geelong, Victoria, Australia. The port is the sixth-largest in Australia by tonnage.[1]

Major commodities handled by the port include crude oil and petroleum products, export grain and woodchips, alumina imports, and fertiliser.[2] Major port industries include Alcoa's Point Henry smelter, AWB Limited's grain elevator, and the Viva Energy oil refinery at Corio.

The Port of Geelong handled $5.6 billion worth of bulk cargo in 2004-05, made up of 12 million tonnes of cargo from 543 ship visits.[2]

History

The steamboat Edina leaving Geelong on its final journey on 21 June 1938.
Cunningham Pier has been refurbished for tourists.

Before the initial settlement of Geelong, a sandbar across the bay from Point Lillias to Point Henry only allowed small ships to enter the inner harbour. Larger ships were required to drop anchor in the bay, and their cargo was brought into Geelong on lighters. At times it was possible to walk across the bay on the sandbar at low tide.[3]

The first channel through the sandbar was started in 1853, providing less than 4 metres draught for ships. This channel was straightened out and dredged at a depth of 6 metres in the 1860s. In 1881 dredging of a new channel was started which took 12 years to complete. It was named the Hopetoun Channel after the then Governor of Victoria, Lord Hopetoun, who opened it on December 20, 1893.[4]

By the early twentieth century shipping traffic had increased and the existing piers in the city area were proving inadequate. As a result, new port facilities were progressively provided in the North Geelong area.

Management

Management of the channels and port of Geelong was the responsibility of the Geelong Harbor Trust that was formed in December 1905.[5] In addition, the Authority was responsible for the associated ports at Queenscliff, Barwon Heads, Lorne and Apollo Bay.

In 1981, the trust was reconstituted as the Port of Geelong Authority as an attempt to follow modern practice with the naming of organisations responsible for ports operation throughout the world.[5] The authority was privatised by the State Government, being sold to TNT Logistics for $49.6 million on 1 July 1996.[6] The port was later rebranded as Toll GeelongPort after the acquisition of TNT by Toll Holdings. The port is now branded as GeelongPort, and is a part of Asciano Limited, following the demerger of Toll Holdings in 2007.

In 2008 the Australian Competition and Consumer Commission (ACCC) revoked Asciano's exclusive equipment contract with the Port of Geelong. The ACCC found that the compulsory use of Asciano cranes for dry bulk and fertiliser unloading was anti-competitive, and that the negative effects of the arrangement outweighed any productivity improvements derived from use of a single equipment type.[7]

Facilities

Woodchipping plant at North Shore
The wharf and unloader at Point Henry

Major piers in the Port of Geelong include:

By the early 1900s shipping traffic has increased and the existing piers in the city area were inadequate. As a result, new port developments were started in the North Geelong area.

There are also a number of special purpose piers on Corio Bay:

See also

References

  1. "City of Greater Geelong:Transportation - Sea". City of Greater Geelong. 2006. Archived from the original on 2007-09-03. Retrieved 2008-02-08.
  2. 1 2 The Age: Geelong port contributes $500mn a year to Victoria - September 12, 2005
  3. "The History of the Bellarine Peninsula". Retrieved 2007-08-02.
  4. Begg, Peter (1990). Geelong - The First 150 Years. Globe Press. ISBN 0-9592863-5-7.
  5. 1 2 Public Record Office Victoria - Agency VA 1425
  6. 1 2 3 "DoI - THE REVIEW OF PORT REFORM IN VICTORIA" (PDF). Archived from the original (PDF) on 2007-10-23. Retrieved 2007-08-02.
  7. "ACCC seeks to revoke dictated Geelong Port equipment use". Lloyd's List Daily Commercial News. 2008-02-08. Retrieved 2008-02-08.
  8. "Rail Geelong: Cunningham Pier Line". Retrieved 2008-12-12.
  9. "Shipmate News" (PDF). www.shipmate.com.au. February 7. Retrieved 2008-06-29. Check date values in: |date= (help)
  10. "Rail Geelong: Harbor Trust Sidings". Retrieved 2008-12-12.
  11. "REPORT relating to the proposed EAST COAST ARMAMENT COMPLEX POINT WILSON, VIC" (PDF). Retrieved 2007-07-26.

External links

Coordinates: 38°7′S 144°23′E / 38.117°S 144.383°E / -38.117; 144.383

This article is issued from Wikipedia - version of the Tuesday, April 19, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.