Georgia State Route 74

State Route 74 marker

State Route 74
Route information
Maintained by GDOT
Length: 108.0 mi[1] (173.8 km)
Major junctions
Southeast end: I75 in Macon
  US 41 / SR 247 in Macon
I475 in Macon
US 341 / SR 7 near Culloden
US 19 / SR 3 / SR 36 in Thomaston
I85 in Fairburn
Northwest end: US 29 / SR 14 in Fairburn
Location
Counties: Bibb, Monroe, Upson, Pike, Meriwether, Coweta, Fayette, Fulton
Highway system
  • Georgia State Routes
SR 73I75

State Route 74 (SR 74) is a 108-mile-long (174 km) state highway that runs southeast-to-northwest through portions of Bibb, Monroe, Upson, Pike, Meriwether, Coweta, Fayette, and Fulton counties in the central part of the U.S. state of Georgia. The route connects the Macon and Fairburn, via Thomaston, Woodbury, and Peachtree City.

Route description

SR 74 begins at an interchange with Interstate 75 (I-75) in the Unionville neighborhood of Macon, in Bibb County. This interchange is at the southwestern edge of Mercer University. Just over 1,000 feet (300 m) later, it intersects US 41/SR 247 (Pio Nono Avenue). It curves to the southwest, passing Macon Mall. It heads west-northwest, passing Macon Memorial Park Cemetery, before an interchange with I-475. It passes just north of Lake Tobesofkee and the Tobesofkee Recreation Area, before crossing into Monroe County. The highway gradually zigzags its way to an intersection with SR 42. It continues to the west and intersects US 341/SR 7 (Peach Blossom Trail), just north-northeast of Culloden. Then, it heads northwest into Upson County. It curves into Yatesville. It heads west-northwest and curves to the southwest, to enter Thomaston. In town, the highway begins a concurrency with SR 36 (Barnesville Highway). They intersect US 19/SR 3. At the next block, SR 36/SR 74 turn to the left onto South Green Street, while SR 74 Alternate (West Main Street) begins straight ahead. One more block later, SR 74 splits off to the west onto West Gordon Street. It curves to the northwest and meets the western terminus of SR 74 Alternate just before leaving town. It continues to the northwest, then curves to the southwest, before heading northwest again. The highway continues to the northwest, through rural areas of the county and crosses the southwestern corner of Pike County. South-southwest of Molena, SR 18/SR 109 begin a concurrency to the west. The three highways head west-southwest and Flint River into Meriwether County. They enter Woodbury. There, at the intersection with SR 85, SR 74 splits off to the north, running concurrent with SR 85. A short distance later, they meet the northern terminus of SR 85 Alternate (Whitehouse Parkway). Farther to the north-northwest, in Gay, is the eastern terminus of SR 109 Spur (Greenville Street). In the unincorporated community of Alps, they intersect SR 362, which briefly joins the concurrency. Less than 3 miles (4.8 km) later, they reach the Meriwether–Coweta county line. The concurrent highways pass through Haralson and enter the southeast part of Senoia. There, they intersect with SR 16 (Wells Street). Less than 2 miles (3.2 km) later, they cross over Line Creek, into Fayette County. They enter Starrs Mill, where SR 74 departs to the northwest. Almost immediately, it enters Peachtree City. The highway passes by the Atlanta Regional Airport. Farther to the north-northwest, it intersects SR 54. SR 74 passes through Tyrone and enters Fulton County. Just under 1.5 miles (2.4 km) later, it meets an interchange with I-85 in Fairburn. The highway curves to the northwest and runs underneath a bridge that carries US 29/SR 14 (Roosevelt Highway). At the ramp that leads to US 29/SR 14, SR 74 takes the ramp and ends at Roosevelt Highway.[1]

The only part of SR 74 that is part of the National Highway System, a system of roadways important to the nation's economy, defense, and mobility, is the section from SR 85 in Starrs Mill to its northern terminus.[2][3]

Major intersections

CountyLocationmi[1]kmDestinationsNotes
BibbMacon0.00.0 I75 Valdosta, AtlantaSouthern terminus; I-75, exit 163
0.40.6 US 41 / SR 247 (Pio Nono Avenue)
 4.77.6 I475I-475, exit 5
Monroe 21.935.2 SR 42 Musella, Forsyth
 28.145.2 US 341 / SR 7 Culloden, Barnesville
UpsonThomaston43.870.5 SR 36 east (Barnesville Highway) BarnesvilleSouthern end of SR 36 concurrency
43.970.7 US 19 north / SR 3 north (Center Street)Northbound lanes of US 19/SR 3, on One-way pairs
44.070.8 US 19 south / SR 3 south (Church Street)Southbound lanes of US 19/SR 3, on One-way pairs
44.070.8 SR 74 Alt. west (West Main Street)Eastern terminus of SR 74 Alternate
44.171.0 SR 36 west (South Green Street) WoodlandWestern end of SR 36 concurrency
45.673.4 SR 74 Alt. east (West Main Street)Western terminus of SR 74 Alternate
Pike 58.794.5 SR 18 east / SR 109 eastSouthern end of SR 18/SR 109 concurrency
Flint River59.996.4Unnamed bridge; crossing over the Flint River, marking the Pike–Meriwether county line
MeriwetherWoodbury62.6100.7 SR 18 west / SR 109 west (Woodbury Highway) / SR 85 southWestern end of SR 18/SR 109 concurrency; southern end of SR 85 concurrency
63.3101.9 SR 85 Alt. south (Whitehouse Parkway) Warm SpringsNorthern terminus of SR 85 Alternate
Gay70.4113.3 SR 109 Spur south (Greenville Street) GreenvilleNorthern terminus of SR 109 Spur
 75.4121.3 SR 362 west (Callaway Road) GreenvilleSouthern end of SR 362 concurrency
 76.3122.8 SR 362 east (Griffin Highway) GriffinNorthern end of SR 362 concurrency
CowetaSenoia85.4137.4 SR 16 (Wells Street) Sharpsburg, Griffin
Fayette 85.1137.0 SR 85 north FayettevilleNorthern end of SR 85 concurrency
Peachtree City95.5153.7 SR 54 (Floy Farr Parkway) Newnan, Fayetteville
FultonFairburn106171 I85 Montgomery, AtlantaI-85, exit 61
108174 US 29 / SR 14 (Roosevelt Highway)Northern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Bannered route

State Route 74 Alternate
Location: Thomaston
Length: 1.5 mi[4] (2.4 km)

State Route 74 Alternate (SR 74 Alternate) is a 1.5-mile-long (2.4 km) alternate route that exists entirely within the central part of Upson County. Its route is completely within the city limits of Thomaston.

It begins at an intersection with the SR 74 mainline (West Gordon Street) in the far western part of Thomaston. It heads east, curves to the southeast, and curves to the east again. It meets its eastern terminus, an intersection with SR 36/SR 74, in the main part of town.[4]

SR 74 Alternate is included as part of the National Highway System, a system of roadways important to the nation's economy, defense, and mobility.[2]

The entire route is in Thomaston, Upson County.

mi[4]kmDestinationsNotes
0.00.0 SR 74 (West Gordon Street) Woodbury, YatesvilleWestern terminus
1.52.4 SR 36 / SR 74 (South Green Street/West Main Street)Eastern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. 1 2 3 Google (July 27, 2013). "Route of SR 74" (Map). Google Maps. Google. Retrieved July 27, 2013.
  2. 1 2 "National Highway System: Georgia" (PDF). United States Department of Transportation. October 1, 2012. Retrieved July 27, 2013.
  3. "National Highway System: Atlanta, GA" (PDF). United States Department of Transportation. October 1, 2012. Retrieved July 27, 2013.
  4. 1 2 3 Google (July 27, 2013). "Route of SR 74 Alternate" (Map). Google Maps. Google. Retrieved July 27, 2013.

External links

This article is issued from Wikipedia - version of the Tuesday, February 16, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.