General Stefan "Grot" Rowecki Bridge
General Stefan "Grot" Rowecki Bridge Most gen. Stefana Grota-Roweckiego w Warszawie | |
---|---|
The General Stefan "Grot" Rowecki Bridge | |
Coordinates | 52°17′14″N 20°59′43″E / 52.28722°N 20.99528°ECoordinates: 52°17′14″N 20°59′43″E / 52.28722°N 20.99528°E |
Carries | Road transport |
Crosses | Vistula River |
Locale | Warsaw |
Characteristics | |
Total length | 645 m |
Width | 40 m |
History | |
Construction begin | 1977 |
Opened | November 28, 1981 |
Inaugurated | November 28, 1981 |
The General Stefan "Grot" Rowecki Bridge (sometimes called the Toruń Bridge, the Grot-Roweckiego Bridge or the Grot Bridge) is a bridge over the Vistula River in Warsaw. It was built from 1977 to 1981 as part of the Trasa Toruńska major thoroughfare by Przedsiębiorstwo Robót Kolejowych No. 15 (the abutments and supports) and Mostostal (the supporting structure and installation). Currently, it is also part of the planned S8 bypass of Warsaw.
History
The first plans for the bridge were from the 1960s. It was originally planned as a bridge suspended on two pylons. The design was changed for cost reasons. The final design was designed by a team of engineers at the "Stolica" design office under the direction of Witold Witkowski.
The bridge was dedicated and opened on November 28, 1981. This was during a period of activity by the "Solidarity" movement. As a concession from the state, the bridge was named for the war-time general Stefan Rowecki (whose pseudonym was "Grot"), which was an extraordinary event in the communist country at that time. The dedication of the bridge turned into a mass demonstration by army veterans and the democratic opposition.
Description
Next to the Siekierkowski Bridge, the General Stefan "Grot" Rowecki Bridge is one of the largest bridges in Warsaw and one of the busiest. The bridge is 645 meters long and it consists of two structurally independent parts, each of which currently has four lanes.
The bridge is almost inaccessible to pedestrians and cyclists. It has two sidewalks, but they are very narrow and impede the passage of bikes. The sidewalks are separated from the roadway by traffic barriers.
Rebuilding for the S8 expressway
In September 2009, the GDDKiA started rebuilding Trasa Toruńska, along with the bridge, to become an expressway, widening the bridge to ten lanes (five in each direction). After the completion of the reconstruction and the construction of a link between Konotopa and Powązkowska Street, the whole route will form part of the S8 expressway.
The project was planned for 2008 through to 2010, but the city's problems with the construction of the new Maria Skłodowska-Curie Bridge caused investment delays because of the lack of alternative routes during the reconstruction of the bridge.
It is currently under reconstruction, with the first phase being a renovation and modernisation. The second phase will be the expansion of the bridge.