Guangdong Pumped Storage Power Station

Guangdong Pumped Storage Power Station

Overview rendition of the PSPS
Location of Guangdong Pumped Storage Power Station in China
Official name 广州抽水蓄能电站
Country China
Location Guangdong
Coordinates 23°45′52″N 113°57′12″E / 23.76444°N 113.95333°E / 23.76444; 113.95333Coordinates: 23°45′52″N 113°57′12″E / 23.76444°N 113.95333°E / 23.76444; 113.95333
Status Operational
Construction began Stage I: 1989
Stage II: 1994
Commission date Stage I: 1994
Stage II: 2000
Pumped-storage power station
Upper reservoir Guangdong Upper
Upper res. capacity 24,080,000 m3 (19,522 acre·ft)
Lower reservoir Guangdong Lower
Lower res. capacity 23,400,000 m3 (18,971 acre·ft)
Hydraulic head 535 m (1,755 ft) (max. gross)
Pump-generators 8 × 300 MW (400,000 hp)
Power generation
Nameplate capacity 2,400 MW (3,200,000 hp)

The Guangdong Pumped Storage Power Station or Guangzhou Pumped Storage Power Station (Chinese: 广州抽水蓄能电站) is a pumped-storage hydroelectric power station near Guangzhou, Guangdong Province, China. Power is generated by utilizing eight turbines, each with a 300 megawatts (400,000 hp) capacity, totalling the installed capacity to 2,400 megawatts (3,200,000 hp). The generated power is sold to China Light and Power customers in Hong Kong. The power station was constructed in two stages, the first four turbines were completed in 1994 and the second four in 2000.[1]

Operation

The station is composed mainly of a lower and upper reservoir and an underground power station. Water for the system is derived from the Liuxihe River. The lower reservoir has a capacity of 23,400,000 cubic metres (19,000 acre·ft) and is created by a 43.5 metres (143 ft) tall and 153.12 metres (502 ft) long gravity dam composed of roller-compacted concrete. Water from this reservoir is pumped into the upper reservoir which is created by a 68 metres (223 ft) tall and 318.52 metres (1,045 ft) long concrete face rock-fill embankment dam and has a capacity of 23,400,000 cubic metres (19,000 acre·ft). Water from the upper reservoir can then be re-released down two penstocks towards the power station. The same reversible pumps that moved the water up can now generate electricity. Just before reaching the power station, the two penstocks each split off into four separate branch pipes, each feeding one of the eight reversible 300 MW turbine generators with water. Once power generation is complete, the generators can reverse, pump the water back up to the upper reservoir and resume the process over again.[2]

See also

References

  1. "Project Completion Report on the Guangzhou Pumped Storage Stage II Project" (PDF). Asian Development Bank. November 2001. Retrieved 31 August 2010.
  2. "Guangzhou pumped-storage power station" (PDF). Chinese National Committee on Large Dams. Retrieved 8 January 2011.

External links

This article is issued from Wikipedia - version of the Saturday, March 28, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.