Hokuriku Shinkansen
Hokuriku Shinkansen | |||
---|---|---|---|
A JR West W7 series train on the Hokuriku Shinkansen | |||
Overview | |||
Native name | 北陸新幹線 | ||
Type | Shinkansen | ||
Status | Operational | ||
Locale | Japan | ||
Termini |
Takasaki Kanazawa | ||
Operation | |||
Opened | 1 October 1997 | ||
Operator(s) | JR East, JR West | ||
Depot(s) | Nagano, Hakusan | ||
Rolling stock | E2 series, E7 series, W7 series | ||
Technical | |||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
Minimum radius | 4,000 m | ||
Electrification | 25 kV AC, 50/60 Hz, overhead catenary | ||
Operating speed | 260 km/h (160 mph) | ||
|
The Hokuriku Shinkansen (北陸新幹線) is a high-speed shinkansen railway line jointly operated by East Japan Railway Company (JR East) and West Japan Railway Company (JR West), connecting Tokyo with Kanazawa in the Hokuriku region of Japan. The first section, between Takasaki and Nagano in Nagano Prefecture, opened on 1 October 1997, originally called the Nagano Shinkansen (長野新幹線) (Takasaki is linked to Tokyo by the Joetsu Shinkansen). The extension to Toyama in Toyama Prefecture and Kanazawa in Ishikawa Prefecture opened on 14 March 2015.[1] Construction of a further section onward to Fukui and Tsuruga in Fukui Prefecture commenced in 2012, with scheduled opening in fiscal 2022. The options for the route of the final section to ultimately connect to the Tokaido Shinkansen are being studied as of April 2016, with a government committee considering three alignments junctioning at Kyoto and two alignments for the final segment to Shin-Osaka.[2][3]
Train names and service patterns
Since March 2015, services on the line are split into four types, with train names as listed below.[4] Trains operate over the Joetsu and Tohoku Shinkansen tracks between Tokyo and Takasaki.
- Kagayaki: Tokyo - Kanazawa, limited-stop service, since 14 March 2015
- Hakutaka: Tokyo - Kanazawa, mostly all-stations service, since 14 March 2015
- Tsurugi: Toyama - Kanazawa, all-stations shuttle service, since 14 March 2015
- Asama: Tokyo - Nagano, mostly all-stations service, corresponding to existing Nagano Shinkansen service introduced in 1997
The original Nagano Shinkansen Asama services introduced in 1997 replaced the conventional Shinetsu Main Line limited express services, also named Asama, which previously took 2 hours 50 minutes from Tokyo (Ueno Station) to Nagano. Following the opening of the Shinkansen, part of the conventional line was abandoned between Yokokawa and Karuizawa. This section included the steeply-graded Usui Pass which required the use of bank engines on all trains.
Stations
- The boundary between JR East and JR West lies immediately to the north of Jōetsumyōkō Station.
- Stations in italics are not currently operational.
Notes
- ↑ Tentative name.
Rolling stock
- E2 series 8-car "N" sets, used on Tokyo - Nagano Asama services only
- E7 series 12-car "F" sets" (since 15 March 2014)[5]
- W7 series 12-car "W" sets" (since 14 March 2015)
With the start of Nagano Shinkansen services, trains were operated by a new fleet of JR East E2 series 8-car sets. A fleet of 17 new E7 series 12-car trainsets were phased in from March 2014, and these were augmented by a fleet of 10 JR West W7 series 12-car sets introduced from March 2015. As of March 2015, the original Nagano Shinkansen 8-car E2 series trains remain on services as far as Nagano.[6]
-
A Nagano Shinkansen E2 series "N" set, June 2002
-
An E7 series train, April 2014
Former rolling stock
- E2 series 8-car "J" sets
- E4 series 8-car "P50/P80" sets as Max Asama
- 200 series 12-car set F80, February 1998
The original E2 series 8-car "J" sets, primarily used on Tohoku Shinkansen services were also used on some Asama services until they were subsequently lengthened to 10 cars. One specially-modified 200 series set, numbered F80, was used on additional Asama services in February 1998 during the 1998 Winter Olympics held in Nagano. The train was modified to operate on both 25 kV AC 50 Hz and 60 Hz overhead power supplies, incorporated weight-saving measures to comply with the 16 tonne axle load restriction, and included additional control equipment to cope with the 30‰ gradient of the Nagano Shinkansen.[7] Its maximum speed was limited to 210 km/h.[7]
-
A Nagano Shinkansen E2 series "J" set, February 1998
-
An E4 series set
-
Modified set F80 on a Nagano Shinkansen Asama service, February 1998
History
Nagano Shinkansen
The initial section between Takasaki and Nagano opened on 1 October 1997.
Between May 2012 and March 2014, station platforms on the Nagano Shinkansen had their platform roofs extended to handle the E7 series 12-car trains which entered service in March 2014 ahead of the March 2015 opening of the extension beyond Nagano.[8] The Hokuriku Shinkansen extension from Nagano to Kanazawa opened in March 2015.[8] The 113-km extension from Kanazawa to Tsuruga was approved for construction in June 2012.[9]
From the start of the revised timetable on 15 March 2014, E7 series trainsets were introduced on Asama services.[5] Initially used on seven return services daily, this number was increased to eleven return services daily from 19 April 2014.[5]
Extension beyond Nagano
Construction of the extension from Nagano to Kanazawa was completed on 24 May 2014.[10] When services commenced in March 2015, the travel time from Tokyo to Toyama was reduced to about 2 hours, with Kanazawa an additional 30 minutes away.[10] Final permission to start construction to Fukui was granted in December 2011, with modification works to Fukui Station already in progress for several years in anticipation of the extension.[11] The extension to Tsuruga was approved for construction on 30 June 2012,[12] and is scheduled to open in fiscal 2022.[13] Beyond Jōetsumyōkō Station, the line is operated by West Japan Railway Company (JR West) instead of East Japan Railway Company (JR East).[14]
Test-running
Test-running on the JR East section of the line between Nagano and Kurobe-Unazukionsen commenced on 1 December 2013, initially at low speeds using the "East i" test train.[15] From 6 December, test-running commenced using 10-car E2 series trainsets, with running speeds gradually increased to the full line speed of 260 km/h.[15] Test-running continued until the end of March 2014.[15] Test-running on the entire line between Nagano and Kanazawa (Hakusan Depot) started on 1 August 2014, using the "East i" test train.[16] Test-running using W7 series trains commenced on 5 August 2014, initially at low speed, on the JR West section between Kanazawa and Jōetsumyōkō.[17]
Future plans
The route of the final section from Tsuruga to Osaka is not yet finalized. The following four options were under consideration,[13] with a fifth unofficial option suggested by a local politician.[18]
- Maibara Route (米原ルート): This involves building a full standard shinkansen track to Maibara Station. It is one third of the length of the Obama Route, and provides good access to both Kyoto and Nagoya. It would result in longer travel time to Osaka than the other options, and trains would have to use the existing, already near-capacity Tokaido Shinkansen tracks between Maibara and Shin-Osaka, although capacity constraints may become less of an issue when the Chuo Shinkansen opens to Osaka, proposed for 2045.
- Kosei Route (湖西ルート): This involves no new track construction; instead, this proposal would upgrade the Kosei Line to Kyoto, either by regauging or dual-gauging the line to support Mini-Shinkansen, or alternatively utilising Gauge Change Train (GCT) operations. This is the cheapest option, but means train speeds will likely be limited to a maximum of 160 km/h (100 mph) and hence travel times will be longer than the other options. If the West Kyushu Shinkansen to Nagasaki (due to open by 2023) is successfully operating with GCTs by that time, it may increase the attractiveness of this option.
- Obama Route (小浜ルート): First proposed in 1973,[13] this route involves building a full standard shinkansen track via Obama and Kameoka. It is the shortest route to Osaka, but also the most expensive (approximately 1 trillion yen), and would bypass Kyoto.
- Obama-Kyoto Route (小浜・京都ルート): This option was first made public in August 2015, and involves following the proposed Obama Route west as far as Obama and then building shinkansen track southward to link with the Tokaido Shinkansen at Kyoto. Including Kyoto on the route is seen as important to increase tourism.[13]
- Maizuru Route: Kyoto politician, Shoji Nishida's proposal from Tsuruga, via Obama, to Maizuru then south-east to Kyoto, eastern Osaka and Kansai Airport.[18] This option is uncosted but will be the most expensive due to the scale of the proposal. It's case is to provide development to the Maizuru region as per the Japanese national government's policy, with the Maizuru Maritime Self-Defence Force Base and several nuclear power stations put forward as reasonable traffic generators. The option to extend the line south of Kyoto to a new Osaka station (located to the south east of Osaka) and onwards to Kansai International Airport is seen as a means to avoid the congestion of the Tokaido line. It may even serve as an alternative route or terminus to Shin-Osaka station for Tokaido line trains, reducing Tokaido line congestion.
A government committee deliberating the proposals decided in April 2016 to narrow the proposed route to three alignments between Tsuruga and Kyoto and two alignments between Kyoto and Shin-Osaka (a northern route through Minoh and a southern route through the Kansai Science City). There had previously been discussion of routing the line to Tennoji, a major terminal in southeast Osaka, which would allow an extension of the line to Kansai Airport.[2][19]
Conventional lines running parallel to the Hokuriku Shinkansen
With the opening of the initial Nagano Shinkansen section in October 1997, the section of the conventional (narrow gauge) Shinetsu Main Line running along approximately the same route between Karuizawa and Shinonoi was transferred from the control of JR East to a newly established third-sector railway operating company, Shinano Railway, becoming the Shinano Railway Line.
With the opening of the Hokuriku Shinkansen extension north of Nagano on 14 March 2015, the conventional lines running along approximately the same route were transferred from the control of their respective JR owning companies to newly established third-sector railway operating companies funded primarily by the prefectural and municipal governments through which the lines pass. A total of 252.2 km of route between Nagano and Kanazawa was transferred to four separate operating companies, including 75.0 km of the Shinetsu Main Line between Nagano and Naoetsu, and 177.2 km of the Hokuriku Main Line between Naoetsu and Kanazawa.[20] Details of the four third-sector operating companies and their respective lines are as shown below.[20]
Section | Length (km) | Former line name | Former operating company | Date transferred | New line name | Operating company |
---|---|---|---|---|---|---|
Karuizawa - Shinonoi | 65.1 | Shinetsu Main Line | JR East | 1 October 1997 | Shinano Railway Line | Shinano Railway |
Nagano - Jōetsumyōkō | 37.3 | 14 March 2015 | Shinano Railway Kita-Shinano Line | |||
Jōetsumyōkō - Naoetsu | 37.7 | Myōkō Haneuma Line | Echigo Tokimeki Railway | |||
Naoetsu - Ichiburi | 59.3 | Hokuriku Main Line | JR West | Nihonkai Hisui Line | ||
Ichiburi - Kurikara | 100.1 | Ainokaze Toyama Railway Line | Ainokaze Toyama Railway | |||
Kurikara - Kanazawa | 17.8 | IR Ishikawa Railway Line | IR Ishikawa Railway |
References
- ↑ 北陸新幹線、来年3月14日開業 東京―金沢2時間半 [Hokuriku Shinkansen to open 14 March next year: Tokyo - Kanazawa in two and a half hours]. Tokyo Shimbun Web (in Japanese). Japan: Chunichi Shimbun. 27 August 2014. Retrieved 27 August 2014.
- 1 2 "終点は新大阪駅 与党検討委、北陸新幹線延伸で一本化". The Nikkei. 26 April 2016. Retrieved 28 April 2016.
- ↑ http://asia.nikkei.com/Politics-Economy/Economy/Japan-s-newest-bullet-train-line-has-busy-first-year
- ↑ 北陸新幹線 長野~金沢間開業に伴う運行計画の概要について [Outline of service plans for opening of Hokuriku Shinkansen from Nagano to Kanazawa] (PDF). News release (in Japanese). Japan: JR East & JR West. 27 August 2014. Retrieved 27 August 2014.
- 1 2 3 3月15日ダイヤ改正と各地の話題 [15 March timetable revision and topics from around the regions]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol. 43 no. 361 (Japan: Kōtsū Shimbun). May 2014. p. 12.
- ↑ Saito, Masatoshi (4 September 2012). JR東:北陸新幹線の新型車両「E7系」概要発表 [JR East announces details of new E7 series for Hokuriku Shinkansen]. Mainichi jp (in Japanese). Japan: The Mainichi Newspapers. Retrieved 4 September 2012.
- 1 2 "200系F80編成" [200 series set F80]. Japan Railfan Magazine. Vol. 38 no. 444 (Japan: Koyusha Co., Ltd.). April 1998. p. 64.
- 1 2 Ito, Tadayuki (3 May 2012). 新幹線ホーム屋根延長へ 長野県内各駅、金沢延伸に備え [Nagano Prefecture shinkansen station platforms to have roofs extended in preparation for extension to Kanazawa]. The Asahi Shimbun Digital (in Japanese). Japan: The Asahi Shimbun Company. Retrieved 3 May 2012.
- ↑ Kyodo News, "Bullet-train extensions approved", The Japan Times, 30 June 2012, p. 2
- 1 2 Igata, Katsuhiro (25 May 2014). "Hokuriku Shinkansen line between Nagano, Kanazawa completed". ajw.asahi.com. Asahi Shimbun. Retrieved 27 May 2014.
- ↑ Archived 5 January 2012 at the Wayback Machine.
- ↑ Archived 5 July 2012 at the Wayback Machine.
- 1 2 3 4 北陸新幹線延伸「小浜・京都ルート」も検討 JR西日本 [JR West also considering Obama-Kyoto route for Hokuriku Shinkansen extension]. Asahi Shimbun Digital (in Japanese). Japan: The Asahi Shimbun Company. 29 August 2015. Retrieved 29 August 2015.
- ↑ Kyodo News, "DPJ may OK three new bullet-train sections", The Japan Times, 17 December 2011, p. 1.
- 1 2 3 北陸新幹線、12月1日から走行試験 [Hokuriku Shinkansen test running to start from 1 December]. Webun (in Japanese). Japan: The Kitanippon Shimbun. 5 October 2013. Retrieved 9 October 2013.
- ↑ "E926形"East-i"が金沢(白山総合車両所)まで走行試験" [Class E926 "East i" test run to Kanazawa (Hakusan Depot)]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 4 August 2014. Retrieved 5 August 2014.
- ↑ "北陸新幹線金沢~上越妙高間でW7系による走行試験が始まる" [Test-running using W7 series begins on Hokuriku Shinkansen between Kanazawa and Jōetsumyōkō]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 5 August 2014. Retrieved 5 August 2014.
- 1 2 http://www.japantimes.co.jp/news/2016/01/24/national/politics-heating-hokuriku-shinkansen-lines-undecided-last-leg/#.VqvdGNJ96Un
- ↑ "北陸新幹線、「けいはんな」通る第3案 京都と大阪間、与党委". The Nikkei. 12 April 2016. Retrieved 13 April 2016.
- 1 2 Osano, Kagetoshi (March 2015). 北陸新幹線並行在来線各社の姿 [Guide to companies operating conventional lines alongside the Hokuriku Shinkansen]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol. 44 no. 371 (Japan: Kōtsū Shimbun). pp. 28–33.
External links
Wikimedia Commons has media related to Hokuriku Shinkansen. |
- JR East website (Japanese)
- JR West website (Japanese)
- Ishikawa Prefecture: Hokuriku Shinkansen construction page (Japanese)
- Fukui Prefecture: Hokuriku Shinkansen Construction Promotion Division (Japanese)
|
|