Interstate 595 (Florida)

Interstate 595 marker

Interstate 595
Port Everglades Expressway
State Road 862
Route information
Maintained by FDOT
Length: 12.860 mi[1] [2] (20.696 km)
Existed: June 11, 1990 – present
Major junctions
West end: I-75 / SR 869 in Sunrise
  Turnpike in Davie
I-95 in Fort Lauderdale
East end: US 1 near Dania Beach
Location
Counties: Broward
Highway system
SR 594SR 595
SR 860SR 865

Interstate 595 (I-595), also known as the Port Everglades Expressway and as the unsigned State Road 862 (SR 862), is a 12.860-mile (20.696 km) Interstate highway that connects Interstate 75 and Alligator Alley in the west with Florida's Turnpike, Interstate 95, Fort Lauderdale-Hollywood International Airport, US 1, and SR A1A before terminating at Port Everglades in the east. The interstate route was conceived in 1969, and planned as an interstate starting in 1974. Construction began in 1984, with the highway opening in stages in the late 1980s, with completion in 1991.

Route description

Exit 12B on Interstate 595
I-595 seen from the air to the right of FLL airport

The Interstate Highway begins in Sunrise as the eastern part of an interchange with Interstate 75 on the southern and western ends (I-75 "north" leads into Alligator Alley on the west side) and the Sawgrass Expressway on the northern end. For most of its length, State Road 84 (the former number for Alligator Alley) runs parallel to the highway, acting as an access road on either side of the Interstate. From the western terminus, the highway heads east to Davie, acting as a commuter route between the western fringes of the populated part of Broward County and Fort Lauderdale. At University Drive, I-595 goes below a partial stack interchange. Three miles east of that interchange, it meets with Florida's Turnpike and U.S. Highway 441. In Fort Lauderdale, I-595 intersects with I-95 at the northwestern end of the airport. At the eastern end of the airport, it has its final interchange with U.S. Highway 1 (which runs concurrently with State Road A1A at the interchange), providing access to the airport and Port Everglades. The eastern terminus consists of two lanes for US 1 southbound, two for US 1 northbound and two lanes for Port Everglades via Eller Drive. The exit for southbound US 1 has a ramp to the airport. State Road A1A is not listed on the exit signs.

History

I-595 westbound at US 441 interchange

Interstate 595 grew out of a highway plan for connecting Port Everglades with Alligator Alley, first conceived in 1969 as the Port Expressway. In 1974, once I-75 was rerouted to Broward County on Alligator Alley as a part of its eastern connection from Naples, it was proposed to be built as an interstate, likely as the southmost end of I-75. However, when the southern terminus of I-75 was moved from Broward to Dade County at the Palmetto Expressway/Gratigny Parkway in the late 1970s, it delayed the construction of the trans-Broward expressway.

In the early 1980s, I-595 was planned to be partially a toll highway to cover its cost of construction. By the time construction started on July 26, 1984, the tolls for the highway vanished, and it was built with only minor changes in its route. The first section, between I-75 and Hiatus Road opened in May 1988, with the section between Florida's Turnpike and US 1 opening on February 24, 1989, and the last section, connecting the disjointed sections opening on October 21, 1989. The highway was designated as I-595 on June 11, 1990, and the Rainbow Interchange with I-95 was completed on March 22, 1991, the last unfinished interchange of the original plan.[3]

I-595 eastbound at the SR 84/US 441 interchange

The portion of the highway between I-95 and US 1 follows the right of way of the Port Everglades Railroad tracks that had previously run from the CSX railroad to Port Everglades.

In 2002, I-595, along with most of Florida's interstates, switched over from a sequential exit numbering system to a mileage based exit numbering system.[4] Numbers were changed again[5] at about the time the express lanes were opened in spring of 2014.

Express lanes

Yellow sign signaling the end of the highway

The $1.8 Billion tolled SunPass express lanes Project in the middle of the expressway to relieve the traffic congestion opened for test use on March 26, 2014 and started tolling on April 9, 2014.[6] The Express Lanes will significantly improve the capacity and operations of the I-595 corridor by providing three additional at-grade lanes in the median of the corridor. The lanes will reverse direction in peak travel times (eastbound in the a.m./westbound in the p.m.). To maximize the operational efficiency, the lanes will have tolls at varying rates throughout the day to optimize traffic flow, and access to and from the lanes will only be allowed west of 136th Avenue, east of U.S. 441/State Road 7, and through a direct connection to the median of Florida's Turnpike, removing long distance commuter traffic from the general purpose lanes. FDOT will retain control of the toll revenue and toll rates.

Exit list

Mainline

Exits 1-7 feed into the frontage roads. The entire route is in Broward County.

Locationmi[1]kmOld exit
[4][5]
New exitDestinationsNotes
Sunrise
Weston
Davie
0.0000.000 I-75 (SR 93) Miami, NaplesExit 19 on I-75
SR 869 north (Sawgrass Expressway) Coral SpringsSouth end of SR 869
Express LanesWestern terminus of Express Lanes
Davie0.5690.9161A1Southwest 136th AvenueEastbound exit/westbound entrance shares ramps with exit 2
0.5250.845 Express Lanes east to Turnpike / I-95  AirportExit and entrance to serve SR 869
1.1451.8431B2 SR 823 (Flamingo Road)Westbound exit shares a ramp with exit 3
2.0523.30223Hiatus Road
3.4545.55934Nob Hill RoadEastbound exit shares a ramp with exit 3
4.2496.83845Pine Island Road
5.5048.85856 SR 817 (University Drive)Eastbound exit shares a ramp with exit 5
6.0929.8047Davie Road
6.97011.217 SR 84 westWest end of concurrency; signed with exit 8
7.33611.8068A8 Turnpike (SR 91) Orlando, MiamiExits 54-54X on Turnpike
8.08013.003 Express Lanes west to I-75 / SR 869Eastern terminus of express lanes
8.40913.5338B9A–B US 441 (SR 7)Shared ramp with exit 8 in both directions;
signed as exits 9A (north) and 9B (south)
8.32913.40499C SR 84 east (Marina Mile Boulevard)East end of concurrency
Fort Lauderdale10.37316.69410A–B I-95 (SR 9) Fort Lauderdale, West Palm Beach, MiamiRainbow Interchange; exits 24-26 on I-95;
signed as exits 10A (north) and 10B (south)
Fort Lauderdale
Hollywood
Dania Beach
12.54420.18812A–B12A US 1 south (SR A1A / SR 5) Dania Beach, International AirportWestbound exit via Exit 12C Grade Intersection/Old exits seprated as 12A=US-1 South and 12B=Airport[7]
12C12B US 1 north (SR A1A / SR 5) Fort LauderdaleNo westbound exit or eastbound entrance
-12C / NE 7th Avenue, SE 6th Avenue, Eller Drive Int'l Airport, Park 'N FlyOpened 2014, Unnumbered/Eastbound Exit Ramp, Grade Intersection (Eastbound/Westbound entrance and Westound exit only)
Dania Beach12.86020.696Port EvergladesContinuation east via Eller Drive
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Express lanes

The entire route is in Broward County.

Locationmi[8]kmExitDestinationsNotes
Sunrise
Weston
Davie
0.0000.000 I-75 (SR 93) Miami, NaplesExit 19 on I-75
Davie1.4132.274 I-595 west (SR 862) to SR 869 (Sawgrass Expressway) Coral SpringsWestbound exit and eastbound entrance, peak-direction only
1.8693.008Sunpass Toll Gantry ($0.50-$2.00 dynamic pricing)
7.76212.4928 Turnpike (SR 91) Miami, OrlandoExit 54X on Turnpike; eastbound exit and westbound entrance
8.79614.156 I-595 east (SR 862) to I-95 AirportRoadway defaults to I-595 mainline
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Frontage roads

See also

References

  1. 1 2 Florida Department of Transportation (March 15, 2015). "Straight Line Diagram of Road Inventory" (PDF). Retrieved December 24, 2015.
  2. Florida Department of Transportation. "FDOT Interchange Report" (PDF). Retrieved October 4, 2007.
  3. "History of Interstate 595". Archived from the original on October 12, 2004. Retrieved 5 October 2014.
  4. 1 2 "Florida's New Interstate Exit Numbers for I-595". Florida Department of Transportation. Archived from the original on December 6, 2010. Retrieved 2010-11-18.
  5. 1 2 Interstate Exit Numbers for I-595, accessed March 2014
  6. Turnbull, Michael (23 March 2014). "I-5955 express lanes ready for test traffic". Sun-Sentinel. Retrieved 23 March 2014.
  7. Florida Department of Transportation (May 5, 2014). "Straight Line Diagram of Road Inventory" (PDF). Retrieved December 24, 2015.

External links

Route map: Bing / Google

Wikimedia Commons has media related to Interstate 595 (Florida).
This article is issued from Wikipedia - version of the Sunday, April 03, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.