List of tallest buildings in Christchurch
This list of tallest buildings in Christchurch ranks high-rise buildings in Christchurch, New Zealand by height. The first high-rise was Manchester Courts, which was the city's tallest building from 1906 until 1967. Manchester Courts failed in the 2010 Canterbury earthquake and had just been demolished by the time the much more destructive 2011 Christchurch earthquake struck. Six more buildings have held the title of tallest building in Christchurch, and the current one (with continuous occupiable floors) is the Pacific Tower, which was finished in 2010 and rises to 86 metres (282 ft). All buildings at least 35 metres (115 ft) high are listed. Most of the high-rises were or are to be demolished following the February 2011 Christchurch earthquake. Of the 51 buildings in the list, 11 are to remain, 3 have their fate yet to be decided, 1 demolition is underway, and 35 have already been demolished.
Background
This lists ranks Christchurch high-rises that stand at least 35 metres (115 ft) tall, based on standard height measurement. This includes spires and architectural details and include antenna masts.
Manchester Courts, earlier known as the MLC Building, was the city's first commercial high-rise building. Built in 1905–1906 for the New Zealand Express Company, it was at the time the tallest commercial building in Christchurch.[1] A Category I heritage building since 1991,[1] it suffered serious structural damage in the 2010 Canterbury earthquake and was condemned to be demolished. Demolition began on 19 October 2010, and was completed in February 2011.[2]
The BNZ Building in Cathedral Square has one of the oldest histories of the buildings listed here, as it replaced the earlier BNZ Building from 1866. The replacement was begun in 1961 as a four-storey building designed by Christchurch architect G. W. Bucknell. Work ceased abruptly in 1963, when the bank announced that they would redevelop the whole site (which included the removal of the historic bank building) and incorporate the four-storey building into the high-rise. The 43 metres (141 ft) high-rise was designed by Sydney firm Stephenson and Turner and completed in 1967.[3]
Since 2007 only three high-rises have been constructed in Christchurch: the HSBC Tower designed by Weirwalker Architecture in Worcester Boulevard the Novotel Hotel in the Square and Pacific Tower in Gloucester Street. All three buildings survived the earthquakes.[4] The HSBC Tower, which first opened in 2009, was the first high-rise to open again after the February 2011 earthquake, with the first tenants moving back in on 30 May 2011.[5][6] The Canterbury Earthquake Recovery Authority later moved into the top floors of the building, with CEO Roger Sutton's office the "highest office in town".[7] Pacific Tower, which houses apartments and the Rendezvous Hotel, was repaired and reopened on 1 May 2013.[8] The Novotel Hotel was repaired and reopened on 19 August 2013.[9][10]
Radio Network House, a 14-storey building in Worcester Street that was finished in 1986, was imploded on 5 August 2012 and was New Zealand's first ever and so far only controlled building demolition by explosives.[11][12]
The Clarendon Tower was built on the site of the former Clarendon Hotel and kept most of the historic hotel's façade, which was the first example of facadism in Christchurch.[13] Designed by Warren and Mahoney,[14] the high-rise was constructed in 1986/87. The 17-storey structure failed in the February 2011 earthquake, with the internal staircases collapsing and the building 'ballooning' in the middle by some 100 millimetres (3.9 in).[15]
In three high-rises, internal staircases collapsed and occupants were trapped: Hotel Grand Chancellor, Forsyth Barr House, and Clarendon Tower. The staircase failures in the Grand Chancellor and the Clarendon Tower were only partial, whilst both staircases in the Forsyth Barr House collapsed from the 14th floor down.[16] The Forsyth Barr House was sold "as is where is" in August 2014 to a local consortium that plans to convert it to a 4.5 star hotel.[17][18]
Lists
Colour key
Tallest buildings
Rank | Name | Height m (feet) |
Floors | Year | Purpose | Architect | Builder | Notes | Refs |
---|---|---|---|---|---|---|---|---|---|
1 | Pacific Tower, 166 Gloucester St | 86 (282) | 23 | 2010 | Hotel/residential | Rob Campbell | AMC Construction | Reopened 1 May 2013 | [19][8] |
2 | Crowne Plaza Hotel (former Forsyth Barr Building), 764 Colombo St | 70 (230) | 19 | 1989 | Hotel | Warren and Mahoney | Paynter Construction | Being converted to a hotel, Crowne Plaza Hotel to occupy | [16][18][20] |
3 | Rydges Hotel (former Noah's), 170 Oxford Tce | 60 (200) | 15 | 1975 | Hotel | Donald Crone & Associates | Fletcher Construction | Repair on hold | [21][22] |
4 | Acute Services Building, Christchurch Hospital | 59.8 | 10 | 2015-16 | Hospital | Katoa Health | Schick Construction | First High-rise under construction since the earthquakes | [23] |
5 | James Hight Building, University of Canterbury | 53 (174) | 11 | 1974 | Library/Office | Ministry of Works architects | Williams Construction | All floors reopened | [24][25] |
6 | School of Medicine, Christchurch Hospital | 50 (160) | 12 | 1973 | School | Ministry of Works architects | Fletcher Construction | All floors reopened | [26] |
7 | Novotel Hotel, 50 Cathedral Sq | 45 (148) | 14 | 2010 | Hotel | Dalman Architecture | Fletcher Construction | Reopened 19 August 2013 | [27][28] |
8 | Millennium Christchurch, 14 Cathedral Sq | 45 (148) | 14 | 1974 | Hotel | Hank Henning | Fletcher Construction | Repairs to begin September 2016[29] | [30][31] |
9 | HSBC Tower (Club Tower), 62 Worcester Blvd | 40 (130) | 12 | 2010 | Office | Weirwalker Architecture | Hawkins Construction | Open | [5] |
10 | Telecom Building, 31 Cathedral Sq | 40 (130) | 12 | 1992 | Office | Griffith Moffat and Partners | Hawkins Construction | Partially reopened | [32] |
11 | Christchurch Civic Offices, 53 Hereford St | 36.58 (120.0) | 8 | 1981 | Office | Athfield Architects | Hawkins Construction | Open | [33] |
12 | Oxford Apartments, 66 Oxford Tce | 36 (118) | 12 | 2005 | Residential | Warren and Mahoney | C. S. Luney Ltd | Closed due to earthquake damage | [34] |
13 | The Gloucester, 28 Gloucester St | 35 (115) | 10 | 1991 | Residential | Wilkie & Bruce | C. S. Luney Ltd | Open | [35] |
14 | State Insurance Building (extension), 116 Worcester St | 35 (115) | 10 | 1970 | Office | Collins & Son | W. Williamson & Sons | Fate undetermined | |
15 | 161 Hereford Suites (former Harmony Towers), 161 Hereford St | 35 (115) | 10 | 1988 | Hotel | Gabites Porter & Partners | Highcroft Properties | To be repaired in 2016 | [36] |
Tallest buildings prior to the February 2011 earthquake
Rank | Name | Height m (feet) |
Floors | Year | Purpose | Architect | Builder | Notes | Refs |
---|---|---|---|---|---|---|---|---|---|
1 | Pacific Tower, 166 Gloucester St | 86 (282) | 23 | 2010 | Hotel/residential | Rob Campbell | AMC Construction | Reopened 1 May 2013 | [19][8] |
2 | Hotel Grand Chancellor, 161 Cashel St | 85 (279) | 20 | 1986 | Hotel | Warren and Mahoney | Forbes Construction | Demolished in 2011/12 | [37] |
3 | PricewaterhouseCoopers, 118 Armagh St | 76.3 (250) | 21 | 1990 | Office | Wilkie & Bruce | Wilkins & Davies Construction | Demolished in 2012 | [38] |
4 | Forsyth Barr House, 764 Colombo St | 70 (230) | 19 | 1989 | Office | Warren and Mahoney | Paynter Construction | To be converted into a hotel | [16][18] |
5 | Clarendon Tower, 78 Worcester St | 67 (220) | 18 | 1988 | Office | Warren and Mahoney | Paynter Construction | Demolished 2012 | [15] |
6 | Radio Network House, 155 Worcester St | 60 (200) | 14 | 1986 | Office | Sheppard & Rout | Forbes Construction | Imploded in 2012 | [11][12] |
7 | Rydges Hotel (former Noah's), 170 Oxford Tce | 60 (200) | 15 | 1975 | Hotel | Donald Crone & Associates | Fletcher Construction | Under repair, Rydges to re-occupy | [21][22] |
8 | James Hight Building, University of Canterbury | 53 (174) | 11 | 1974 | Library | Ministry of Works architects | Williams Construction | Under Repair Most floors open again |
[24][25] |
9 | Westpac Canterbury Centre, cnr High and Cashel Sts | 50 (160) | 13 | 1983 | Office | Warren and Mahoney | C. S. Luney Ltd | Demolished 2012 | [39][40] |
10 | Victoria Square Tower (The Rutherford), 100 Armagh St | 50 (160) | 15 | 2006 | Residential | Buchan Group | Hawkins Construction | Demolition completed July 2014 | [41][42] |
11 | Christchurch Central Police Station, 48 Hereford St | 50 (160) | 13 | 1973 | Office | Ministry of Works architects | W. Williamsom & Sons | Demolished by implosion 31 May 2015[43] | [44][45][46] |
12 | School of Medicine, Christchurch Hospital, Riccarton Ave | 50 (160) | 12 | 1973 | School | Ministry of Works architects | Fletcher Construction | By Jan 2013, two levels were occupied again | [26] |
13 | Novotel Hotel, 50 Cathedral Sq | 45 (148) | 14 | 2010 | Hotel | Dalman Architecture | Fletcher Construction | Reopened 19 August 2013 | [27][28] |
14 | Millennium Christchurch (former Housing Corp Building), 14 Cathedral Sq | 45 (148) | 14 | 1974 | Hotel | Hank Henning | Fletcher Construction | Repair on hold, pending insurance payout | [30] |
15 | Crowne Plaza, cnr Kilmore and Durham Sts | 45 (148) | 12 | 1988 | Hotel | Warren and Mahoney | Fletcher Construction | Demolished 2012 | [47] |
16 | Gallery Apartments, 62 Gloucester St | 43 (141) | 12 | 2007 | Residential | Wilson & Hill | Hawkins Construction | Demolished in 2011/12 | [4][48] |
17 | BNZ Building, 129 Hereford St | 43 (141) | 12 | 1967 | Office | Stephenson & Turner | P.D. Graham & Co. | Demolition started in 2012, but stopped at level 5 | [3] |
18 | Avalon Apartments, 41 Cambridge Terrace | 40 (130) | 13 | 2003 | Residential | Naylor Love | Demolished | [49] | |
19 | Holiday Inn (former Centra), Cnr High and Cashel Sts | 40 (130) | 13 | 1988 | Hotel | Peter Beaven | C. S. Luney Ltd | Demolished 2012 | [40][50] |
20 | Heritage Hotel, 28–30 Cathedral Sq | 40 (130) | 12 | 1971 | Hotel | Forbes Construction | Demolition June 2013 to December 2013 | [51][52] | |
21 | HSBC Building (Club Tower), 62 Worcester Blvd | 40 (130) | 12 | 2010 | Office | Weirwalker Architecture | Hawkins Construction | Open | [5] |
22 | Anthony Harper House (former AMP Building), 47 Cathedral Sq | 40 (130) | 12 | 1975 | Office | Donald Crone & Associates | C. S. Luney Ltd | Demolished 2012 | [53] |
23 | Oaks iStay Hotel, 187 Cashel St | 40 (130) | 12 | 2006 | Hotel | Warren and Mahoney | Naylor Love Construction | Demolished from October 2014 to March 2015 | [54][55] |
24 | Bridgewater Apartments, 62 Cashel St | 40 (130) | 12 | 1997 | Residential | Warren and Mahoney | Mainzeal Construction | Demolished | [56] |
25 | Telecom Building, 31 Cathedral Sq | 40 (130) | 12 | 1992 | Office | Griffith Moffat and Partners | Hawkins Construction | Partially reopened | [32] |
26 | Manchester Courts | 39.65 (130.1) | 12 | 1906 | Office | Luttrell Brothers | Demolished 2010/11 | [1] | |
27 | Te Waipounamu House (former Reserve Bank Building), 158 Hereford St | 39.62 (130.0) | 10 | 1964 | Office | Warren and Mahoney | C. S. Luney Ltd | Demolished 2013 | [57] |
28 | Christchurch Civic Offices (former Postal Centre), 53 Hereford St | 36.58 (120.0) | 8 | 1981 | Office | Athfield Architects | Hawkins Construction | Open | [33] |
29 | Oxford Apartments, 66 Oxford Tce | 36 (118) | 12 | 2005 | Residential | Warren and Mahoney | C. S. Luney Ltd | Closed due to earthquake damage | [34] |
30 | BNZ Building, 137 Armagh St | 36 (118) | 11 | 1985 | Office | Trengrove and Blunt | C. S. Luney Ltd | Demolished in April/May 2013 | [51][58][59] |
31 | Tower Insurance (former Government Life Building), Cathedral Sq | 35 (115) | 10 | 1963 | Office | Collins & Son | C. S. Luney Ltd | Demolition completed October 2014 | [60] |
32 | Craigs Investments (former Langwood House), 90 Armagh St | 35 (115) | 10 | 1987 | Office | Sheppard & Rout | Lund Construction | Demolished in June 2013 | [61][62] |
33 | Copthorne Hotel, 335 Durham St | 35 (115) | 11 | 1986 | Hotel | Williams Construction | Demolished 2011 | [63] | |
34 | NZI House, 96 Hereford St | 35 (115) | 10 | 1986 | Office | Wilson & Hill | Paynter & Hamilton Ltd | Demolished 2012 | [64] |
35 | SBS House (former Manchester Unity Building), 180 Manchester St | 35 (115) | 10 | 1967 | Office | Peter Beaven | Fletcher Construction | Demolished 2011 | [65] |
36 | Branigans Building (former DFC Building), cnr Gloucester St and Cambridge Tce | 35 (115) | 10 | 1987 | Office | Warren and Mahoney | Forbes Construction | Demolished 2012 | [66] |
37 | Copthorne Hotel (former Ramada Inn), 776 Colombo St | 35 (115) | 10 | 1972 | Hotel | Peter Beaven | Fletcher Construction | Demolition from July to November 2013 | [67][68][69][70] |
38 | The Gloucester, 28 Gloucester St | 35 (115) | 10 | 1991 | Residential | Wilkie & Bruce | C. S. Luney Ltd | Open | [35] |
39 | National Bank, 164 Hereford St | 35 (115) | 10 | 1980 | Office | Warren and Mahoney | C. S. Luney Ltd | Demolished 2012 | [71] |
40 | National Insurance Building, 217 Gloucester St | 35 (115) | 10 | 1971 | Office | Warren and Mahoney | Wilkins and Davies Construction | Demolished 2012 | |
41 | AMI Insurance, 29-35 Latimer Sq | 35 (115) | 10 | 1972 | Office | Warren and Mahoney | C. S. Luney Ltd | Demolished 2012 | [72] |
42 | AA House, 206 Hereford St | 35 (115) | 10 | 1962 | Office | Demolished 2012 | [73] | ||
43 | State Insurance Building (extension), 116 Worcester St | 35 (115) | 10 | 1970 | Office | Collins & Son | W. Williamson & Sons | Fate undetermined | |
44 | Heatherlea Apartment, 10 Ayr St, Riccarton | 35 (115) | 10 | 1987 | Residential | Wilkie & Bruce | Wilkins & Davies Construction | Demolished 2012 | [74] |
45 | Westpark Tower, 56 Cashel St | 35 (115) | 10 | 1987 | Office | Sheppard & Rout | Hanham & Phillip | Demolished 2012 | [75] |
46 | Westminster House, 202 Cashel St | 35 (115) | 10 | 1978 | Office | Warren and Mahoney | Williams Construction | Demolished 2012 | [76] |
47 | Terrace on the Park Apartments, 80 Park Terrace | 35 (115) | 10 | 2000 | Residential | Thom Craig | Mainzeal Construction | Demolished 2012 | [77] |
48 | Farmers Car Park Building, 194 Oxford Terrace | 35 (115) | 10 | 1998 | Retail & car parking | Ian Krause | Lund Construction | Demolished 2013 | [78] |
49 | The Millbrook Apartments, 21-23 Carlton Mill Rd | 35 (115) | 10 | 1965 | Residential | C.S Luney Ltd | Demolished 2012 | [79] | |
50 | The Establishment, Cnr Peterborough and Victoria Sts | 35 (115) | 11 | 2004 | Residential | Warren and Mahoney | C. S. Luney Ltd | Demolished 2012 | [80] |
51 | 161 Hereford Suites (former Harmony Towers), 161 Hereford St | 35 (115) | 10 | 1988 | Hotel | Gabites Porter & Partners | Highcroft Properties | To be repaired in 2016 | [36] |
Proposed buildings
- Verve Precinct is a 11 level apartment building proposed to replace the Establishment at 52 Peterborough St, this is currently in the development stage.[81]
- West Kilmore also 11 level apartment planned at 52 Kilmore Street.[82]
- Cathedral Towers is a proposed apartment complex of two buildings of 14 and 9 levels at 26 Cathedral Square. [83]
- A 14 storey hotel at 160 Gloucester St is currently in the planning stage.[84]
Timeline of tallest buildings
This is a list of the history of the tallest buildings in Christchurch, showing those buildings that once held the title of tallest building in chronological order.
Name | Image | Years as tallest | Height m / feet |
Reference |
---|---|---|---|---|
Manchester Courts | 1906–1967 | 39.65 m (130.1 ft) | [1] | |
BNZ Building | 1967–1973 | 43 m (141 ft) | [3] | |
Christchurch Central Police Station | 1973–1974 | 50 m (160 ft) | [45] | |
James Hight Building | 1974–1975 | 53 m (174 ft) | [24] | |
Rydges Hotel (former Noah's) | 1975–1986 | 60 m (200 ft) | [21] | |
Hotel Grand Chancellor | 1986–2010 | 85 m (279 ft) | [37] | |
Pacific Tower | 2010 – present | 86 m (282 ft) | [19] |
See also
- List of tallest structures in New Zealand
- List of tallest buildings in Auckland
- List of tallest buildings in Wellington
- Twinkle Toes
- List of tallest buildings in Oceania
References
- 1 2 3 4 "Manchester Courts" (PDF). New Zealand Historic Places Trust. Retrieved 25 January 2013.
- ↑ Conway, Glenn (19 October 2010). "Manchester Courts demolition begins". The Press. Archived from the original on 21 October 2010. Retrieved 19 October 2010.
- 1 2 3 NZ Federation of University Women (1995). Round the Square : A History of Christchurch's Cathedral Square. Christchurch: Clerestory Press. pp. 50–52. ISBN 0-473-03399-2.
- 1 2 Williams, David (9 June 2011). "Acclaimed tower to come down". The Press. Retrieved 2 June 2012.
- 1 2 3 Mathewson, Nicole (20 July 2011). "HSBC tenants move back in". The Press. Retrieved 10 February 2013.
- ↑ Fussell, Alistair. "Rebuilding Christchurch: The Role of the Steel Construction Industry". Heavy Engineering Research Association. Retrieved 10 February 2013.
- ↑ Wright, Michael (13 June 2012). "Sutton plays long game one year on". The Press. Retrieved 10 February 2013.
- 1 2 3 Stylianou, Georgina (1 May 2013). "Rendezvous Hotel reopens today". The Press. Retrieved 1 May 2013.
- ↑ Wood, Alan (29 July 2013). "Novotel almost ready to reopen doors". The Press. Fairfax NZ News. Retrieved 4 May 2014.
- ↑ "Novotel Christchurch celebrates reopening". Scoop. 22 August 2013. Retrieved 4 May 2014.
- 1 2 Post, Nadine M. (6 August 2012). "Quake-Damaged Building Implosion One for the Books". Engineering News-Record. Retrieved 22 January 2013.
- 1 2 "Radio Network House imploded". The Press. 5 August 2012. Retrieved 22 January 2013.
- ↑ "Clarendon Hotel". Register of Historic Places. Heritage New Zealand. Retrieved 14 June 2011.
- ↑ "Warren and Mahoney". Christchurch City Libraries. Retrieved 22 January 2013.
- 1 2 Greenhill, Marc (13 March 2012). "Clarendon Tower 'a horror story'". The Press. Retrieved 21 January 2013.
- 1 2 3 "Research into city's high rise quake evacuees". The Star (Christchurch). 27 September 2012. Retrieved 22 January 2013.
- ↑ Taylor, Colin (1 October 2014). "Hotel sector springs back to life". The New Zealand Herald. Retrieved 20 October 2014.
- 1 2 3 McDonald, Liz (7 August 2014). "Forsyth Barr to become a hotel". The Press. Retrieved 20 October 2014.
- 1 2 3 Berry, Michael (19 July 2012). "Pacific Tower to reopen by February". The Press. Retrieved 21 January 2013.
- ↑ "Forsyth Barr building to become Crowne Plaza Hotel". Stuff.co.nz. 2014-12-03. Retrieved 2015-12-18.
- 1 2 3 Wood, Alan (11 July 2011). "Christchurch hotels plan relaunch". The Press. Retrieved 23 January 2013.
- 1 2 "Christchurch Accommodation | Rydges Latimer Christchurch". rydges.com. Retrieved 11 April 2014.
- ↑ "Massive concrete pours start this weekend at the Acute Services building, Christchurch Hospital". 24 July 2015. Retrieved 3 August 2015.
- 1 2 3 "Central Library - Te Puna Mātauraka o Waitaha". University of Canterbury. Retrieved 4 June 2012.
- 1 2 "Central Library Floor Plans". University of Canterbury. Retrieved 4 June 2012.
- 1 2 "Building Status at 17 January 2013" (PDF). University of Otago Christchurch. p. 1. Retrieved 21 January 2013.
- 1 2 Walton, John (18 May 2012). "Novotel & Ibis Christchurch hotels to reopen within the year". Australian Business Traveller. Retrieved 23 January 2013.
- 1 2 "Christchurch City Hotels Dash To Cater For Demand | Stuff.co.nz". stuff.co.nz. Retrieved 11 April 2014.
- ↑ "Hotel deals a big boost for central Christchurch". Stuff.co.nz. Retrieved 16 April 2016.
- 1 2 Wood, Alan (3 August 2012). "Millennium Hotel repairs start". The Press. Retrieved 25 January 2013.
- ↑ "Hotel chain hopeful it can rebuild in squares | Stuff.co.nz". stuff.co.nz. Retrieved 11 April 2014.
- 1 2 "Telecom staff won't be forced to work in CBD". Stuff.co.nz. Retrieved 14 February 2013.
- 1 2 "Council’s new Civic Building - Projects to improve Christchurch - Christchurch City Council". Ccc.govt.nz. Retrieved 14 February 2013.
- 1 2 "Oxford Apartments". Warren and Mahoney. Retrieved 4 June 2012.
- 1 2 "28 GLOUCESTER STREET, CHRISTCHURCH CENTRAL 8013 | Canterbury Earthquake Recovery Authority". Cera.govt.nz. Retrieved 14 February 2013.
- 1 2 Meier, Cecile (10 August 2015). "Christchurch CBD's derelict buildings to come back to life". Stuff. Retrieved 11 August 2015.
- 1 2 "Christchurch". Grand Hotels International. Retrieved 23 January 2013.
- ↑ "Demolition of quake-hit PWC building starts". The New Zealand Herald. 14 March 2012. Retrieved 23 January 2013.
- ↑ "More buildings demolished in centre". The Press. 16 May 2012. Retrieved 23 January 2013.
- 1 2 Gates, Charlie (13 September 2012). "Twinkle Toes checks in". The Press. Retrieved 14 September 2012.
- ↑ Heather, Ben (19 March 2011). "Big, broken and on hit list". The Press. Retrieved 25 January 2013.
- ↑ "Victoria Apartments demolition begins | Stuff.co.nz". stuff.co.nz. Retrieved 11 April 2014.
- ↑ Hume, Myles (31 May 2015). "Christchurch's central police station implosion". The Press. Retrieved 1 June 2015.
- ↑ Mathewson, Nicole (24 November 2014). "Police tower will be imploded". The Press. Retrieved 25 November 2014.
- 1 2 "Police abandon Christchurch stations". 29 December 2011. Retrieved 23 January 2013.
- ↑ "Abandoned police station to be demolished | Stuff.co.nz". stuff.co.nz. Retrieved 11 April 2014.
- ↑ Young, Rachel (2 May 2012). "Crowne Plaza demolition captured". The Press. Retrieved 26 January 2013.
- ↑ "Chch high-rise apartments now on a lean". One News. 3 March 2011. Retrieved 22 January 2013.
- ↑ "59 Cambridge Terrace | Canterbury Earthquake Recovery Authority". Cera.govt.nz. 6 September 2012. Retrieved 14 February 2013.
- ↑ Wood, Alan (15 February 2012). "Christchurch's Holiday Inn to be demolished". The Press. Retrieved 28 January 2013.
- 1 2 Gates, Charlie (2012-09-29). "Christchurch City Centre Demolitions Speeding Up". Stuff.co.nz. Retrieved 14 February 2013.
- ↑ "Heritage tower body corporate applies to tear building... | Stuff.co.nz". stuff.co.nz. Retrieved 11 April 2014.
- ↑ "Demolition continues on Grant Thornton building". The Press. 29 June 2012. Retrieved 28 January 2013.
- ↑ Gates, Charlie (29 September 2012). "Our disappearing city centre". The Press. Retrieved 28 January 2013.
- ↑ "Repair option to gives way to grass". The Press. 30 March 2013. p. C23. Retrieved 1 April 2013.
- ↑ "1997". Warren and Mahoney. Retrieved 4 June 2012.
- ↑ "Te Waipounamu House 2 February 2013". CHCH EQ Photos. Retrieved 5 July 2013.
- ↑ Wright, Michael (21 March 2013). "Armagh building to come down in April". The Press (Christchurch). Retrieved 21 March 2013.
- ↑ "Hundreds watch as bank building bowled". The Press. 28 April 2013. Retrieved 1 May 2013.
- ↑ Greenhill, Marc. "Government Life Building In Christchurch To Be Demolished...". Stuff.co.nz. Retrieved 14 February 2013.
- ↑ http://canterbury.royalcommission.govt.nz/documents-by-key/20120229.3509[Report on damage to building]
- ↑ "Craigs Investment Partners House | Demolition Begins... | Stuff.co.nz". stuff.co.nz. Retrieved 11 April 2014.
- ↑ Mathewson, Nicole (22 July 2011). "Demolition within three months". The Press. Retrieved 21 January 2013.
- ↑ Greenhill, Marc. "Demolition about to start in northern areas". Stuff.co.nz. Retrieved 14 February 2013.
- ↑ "SBS House comes down". Stuff.co.nz. 17 October 2011. Retrieved 14 February 2013.
- ↑ "Leighs: Demolition work defines Christchurch". Leighsconstruction.co.nz. Retrieved 14 February 2013.
- ↑ Mathewson, Nicole (9 November 2011). "Copthorne Hotel To Be Gone By Month's End". The Press. Retrieved 14 February 2013.
- ↑ Wood, Alan (20 March 2013). "Precinct plan puts hotel hopes in limbo". The Press. p. A13. Retrieved 20 March 2013.
- ↑ "Copthorne Hotel Christchurch Demolition Under Way | Stuff.co.nz". stuff.co.nz. Retrieved 11 April 2014.
- ↑ "Copthorne collapses in CBD | Stuff.co.nz". stuff.co.nz. Retrieved 11 April 2014.
- ↑ CERA (2011-09-01). "CERA Media Briefing - Friday 02 September 2011: Warwick Isaacs". YouTube. Retrieved 14 February 2013.
- ↑ "Year in review – to 30 June 2011" (PDF). AMI. 2011. Retrieved 14 February 2013.
- ↑ John Mccrone (2012-09-30). "Christchurch the world's biggest demolition training...". Stuff.co.nz. Retrieved 14 February 2013.
- ↑ "Heatherlea Apartment Christchurch Demolition 15/12/2012". YouTube. Retrieved 24 January 2013.
- ↑ "CTV Engineers' Buildings 'Not Being Targeted'". Stuff.co.nz. 2012-12-13. Retrieved 14 February 2013.
- ↑ "Christchurch Buildings set for demolition, partial demolition or make safe". Rebuildchristchurch.co.nz. 2011-04-01. Retrieved 14 February 2013.
- ↑ "Urgent Demolition For Park Terrace Ordered". Stuff.co.nz. Retrieved 14 February 2013.
- ↑ "Farmers Car Park Building Demolition". Stuff.co.nz. 2012-10-11. Retrieved 14 February 2013.
- ↑ "Christchurch earthquake Millbrook Apartments". flickr.com. 18 September 2012. Retrieved 6 March 2013.
- ↑ "The Establishment Apartments - Portfolio - Warren and Mahoney". warrenandmahoney.com. Retrieved 11 April 2013.
- ↑ http://web.archive.org/web/20151222085149/http://harcouts.co.nz/Property/737733/RD4601/404-52-Peterborough-Street. Archived from the original on 22 December 2015. Retrieved 17 December 2015. Missing or empty
|title=
(help) - ↑ "Christchurch Central, 701/52 Kilmore Street | Redwood". Harcourts.co.nz. Retrieved 2015-12-18.
- ↑ "Apartment towers for Cathedral Square". Stuff. Retrieved 2016-04-09.
- ↑ "Hotel deals a big boost for central Christchurch". Stuff.co.nz. Retrieved 16 April 2016.
Wikimedia Commons has media related to High-rises in Christchurch. |