Karkheh Dam

Karkheh Dam
Location of the Karkheh Dam in Iran
Country Iran
Location Khūzestān
Coordinates 32°29′21″N 48°07′36″E / 32.48917°N 48.12667°E / 32.48917; 48.12667Coordinates: 32°29′21″N 48°07′36″E / 32.48917°N 48.12667°E / 32.48917; 48.12667
Status Operational
Construction began 1992
Opening date 2001
Construction cost US$700 million
Owner(s) Iran Water & Power Resources Development Co.
Dam and spillways
Impounds Karkheh River
Height (foundation) 127 m (417 ft)
Length 3,030 m (9,941 ft)
Width (crest) 12 m (39 ft)
Width (base) 1,100 m (3,609 ft)
Reservoir
Total capacity 5,900,000,000 m3 (4,800,000 acre·ft)
Catchment area 42,000 km2 (16,000 sq mi)
Surface area 162 km2 (63 sq mi)
Power station
Turbines 3 × 140 MW[1]
Installed capacity 420 MW
Annual generation 934 GWh

The Karkheh Dam (Persian: سد کرخه) is a large multi-purpose earthen embankment dam built in Iran on the Karkheh River in 2001 by the Islamic Revolutionary Guards Corps (IRGC).[2]

The dam is in the northwestern province of Khūzestān, the closest city being Andimeshk to the east. It is 127 metres (417 ft) high and has a reservoir capacity of 5.9 billion cubic meters. The Karkheh Dam is designed to irrigate 320,000 hectares (790,000 acres) of land, produce 520 MW of hydro-electricity[1] and prevent downstream floods.[2]

In August 2015, Hamid Chitchian, energy minister of Iran, said that because of the water crisis in Iran and low levels of water, this dam has not produced even 1 kWh of energy in its lifetime. In 2014 the maximum water in the reservoir of the dam reached 1,900,000,000 m3 (6.7×1010 cu ft) and it is estimated that this number will be even less in 2015.[3]

Construction

In 1956, studies began on the Karkheh Dam by the American company Development and Resources Corporation, which was headed by David E. Lilienthal, the former Chairman of the Tennessee Valley Authority (TVA). In 1990, the final studies were completed by Mahab Ghods Consulting Engineers. The engineering division of the Islamic Revolutionary Guards Corps (IRGC) started construction on the Karkheh Dam in 1992 and the dam was complete in 2001.[2] During construction, 120 contractual and over eight consultative companies worked on the dam; 5,000 workers constructed the dam and 40 were killed in the process.[4]