Kiwanis Trail
Kiwanis Trail | |
---|---|
Rails to Trails | |
Length | 8 miles |
Location |
Adrian to near Tecumseh |
Trailheads | Parking in Adrian and north terminus [1][2] |
Use | Hiking, Bicycling, Inline Skating, Cross Country Skiing[1][3] |
Elevation | |
Grade | mostly flat to gentle railroad grades[4] |
Hiking details | |
Trail difficulty | Wheelchair accessible[5] |
Months | 12 |
Sights |
Covered bridge in Trestle Park Trestle bridge over Wolf Creek |
Surface | Asphalt, Concrete[1] |
Right of way | DT&I |
The Kiwanis Trail is a rail to trail conversion in Adrian, Michigan that roughly follows the Raisin River.[1]
History
The trail occupies the old Detroit, Toledo and Ironton Railroad that extended from Ironton, Ohio to Detroit.
The trail forms the first component of a much longer proposed regional greenway trail, the River Raisin Greenway.[6] When complete, it will extend from Adrian to Manchester, Michigan.[1]
Location
The paved trail is maintained by the parks department of in Adrian. It extends northeast and almost reaches the the city of Tecumseh.[2]
Crossing | Mileage | Notes | Coordinates | |
---|---|---|---|---|
(mi) | (km) | |||
Bus. US 223 / M-52 (S. Adrian Hwy. / S. Main St.) |
0 | 0 | Southern Terminus, Adrian | 41°53′28″N 84°02′33″W / 41.891096°N 84.042612°W |
Riverside Park | 0.3 | 0.48 | Bathrooms and parking[1][2] | 41°53′39″N 84°02′47″W / 41.894112°N 84.046265°W |
Bus. US 223 (Maumee St.) |
0.8 | 1.3 | Busy highway crossing | 41°53′58″N 84°02′31″W / 41.899546°N 84.041870°W |
Trestle Park | 1.1 | 1.8 | Bathrooms and parking[1][2] | 41°54′16″N 84°02′09″W / 41.904551°N 84.035880°W |
Bent Oak Ave. | 1.7 | 2.7 | Parking[2] | 41°54′34″N 84°02′01″W / 41.909580°N 84.033627°W |
Trestle bridge | 1.8 | 2.9 | Trestle bridge over Wolf Creek that drains Lake Adrian into Raisin River | 41°54′34″N 84°02′01″W / 41.909580°N 84.033627°W |
W. Valley Rd. | 4.2 | 6.8 | Port-a-pot courtesy of St. John's Lutheran Church [2] | 41°56′18″N 84°00′25″W / 41.938298°N 84.007069°W |
M-52 (N. Adrian Hwy.) | 4.4 | 7.1 | Caution, busy highway | 41°56′29″N 84°00′17″W / 41.941285°N 84.004609°W |
Jct. of Ives Rd. & Green Hwy. | 8.1 | 13.0 | Parking,[1] Northern Terminus, 1.5 miles south of Tecumseh | 41°58′41″N 83°57′22″W / 41.978027°N 83.956059°W |
External links
References
- 1 2 3 4 5 6 7 8 "Traillink: Kiwanis Trail, MI". Retrieved 4 April 2016.
- 1 2 3 4 5 6 "Adrian Lock and Bike: Local Cycling Trail".
- ↑ "City of Adrian, Parks Information". Retrieved 4 April 2016.
- ↑ "Google Maps: Kiwanis Trail".
- ↑ "Michigan Wheelchair Accessible Trails". Retrieved 4 April 2016.
- ↑ "Raisin Valley Land Trust: Three River Raisin Projects". Retrieved 4 April 2016.
This article is issued from Wikipedia - version of the Saturday, April 30, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.