Lambton Railway

Lambton Railway
Legend
To South Shields and Tyne Dock
DCL to Newcastle Central
To Gateshead
Monkwearmouth Railway Bridge
Hetton & Lambton Staithes
South Docks
Sunderland
River Wear
Wardley Colliery
Future Freightliner terminal

Millfield
Pallion
Usworth
Hylton

Ryhope
Washington
North Moor No.4
Cox Green
North Moor No.3
Future Freightliner terminal
North Moor No.2
Victoria Viaduct
North Moor No.1
North Biddick Colliery
Seaton Bank Top
Harraton Colliery

Lambton Engine Works
Penshaw
Dorothea Pit
Philadelphia Power Station
DCL to Seaham
To Chester-le-Street

Margaret Pit
Lumley Sixth Pit

Warden Law engine
Fencehouses
Lambton D Pit
Houghton Colliery
Copt Hil engine
Leamside

Nicholson Pit
To Durham

Eppleton Colliery
To Durham (Goods)

Belmont Bank
Pittington
Hetton
Littletown Colliery
Hetton Colliery
Sherburn House
South Hetton
Littleton Hill Colliery
Moorsley Pit
Sherburn Colliery

Elemore Colliery
Sherburn Colliery
Sherburn House Colliery
D&S to Durham Elvet
LL to Ferryhill
Braddyll's Railway to Seaham

The Lambton Railway was a private industrial railway in County Durham, England, constructed initially as a tramway from 1737, to enable coal to be transported from Lambton Collieries to the Port of Sunderland. It closed under the ownership of the National Coal Board in August 1967.[1]

History

Ex-Lambton Collieries 0-6-2T No.29 at the NCB works, Philadelphia, Tyne and Wear
Lambton Collieries B-pit wagon, as preserved at The Powerhouse Museum

To enable the coal extracted from the collieries to be transported to the River Wear, from 1737 the company had constructed a horse-drawn tramway from Fatfield to Cox Green. In 1819 the Lambton's bought the Newbottle wagonway, and connected this to the Lambton Railway with a line between Bournmoor and Philadelphia. This now meant that the company had a direct route from its collieries to the River Wear, where it constructed Lambton Staithes within the Port of Sunderland.[1]

The company went steam powered from 1814, initially with a series of 0-6-0T locomotives. However, due to the steepness of the route over Warden Law, which lies 570 feet (170 m) above sea level, the route was worked as a rope-incline with stationary engines until 1864.[1] By 1860, the Lambton was the largest of all the colliery railways in the northeast, totalling across its mainline and branches alone some 70 miles (110 km) of track.[2] Still mainly rope-incline worked and developed from original horse-drawn tramways, in the next 20 years it was reengineered to be mainly steam locomotive powered.[2]

In 1854 the North Eastern Railway was formed, which gave it control of the mainline from Darlington to Newcastle via the Leamside Line. In 1865, the NER opened a branch from Penshaw to Sunderland, which brought about a running-rights agreement between the Lambton and the NER to allow the company to run its trains over NER metals when required. This resulted in the company buying a new series of 0-6-0 tender locomotives to power these heavier mainline trains.[1]

After Lambton Collieries merged with Hetton Collieries in 1911, the company gained control over the Hetton Railway, which was surveyed and laidout by George Stephenson from 1822 primarily for the use of steam locomotives. This was still mainly a rope-incline railway, which was made redundant through access to the Lambton Railway. The company did however additionally connect Lambton staithes to the Hetton staithes within the docks.[1]

In 1924 after the merger with Joicey Collieries, the company gained control of the Beamish Railway, although this remained a separate operation.

Closure

In 1959 the Hetton Railway via Warden Law was closed. A further spate of closures occurred in 1967 with Lambton Staithes being closed in January and the line to Pallion closing in August of the same year.[1]

Locomotives

Preserved 0-6-2T Lambton Collieries locomotives No.29, as preserved on the North Yorkshire Moors Railway

In 1904, the Lambton Railway contracted Kitson and Company of Leeds to supply their first 0-6-2T tank engine. Fleet No.29 (Works No 4263) proved so successful, that in 1907 it was supplemented by No's 30 and 31 (Works No’s 4532 & 4533). In 1909 Robert Stephenson and Company of Darlington supplied the modified design No's 5 and 10 (Works No’s 3377 & 3378), followed by No.42 in 1920 (works No 3801). The final locomotive to the design, No.57 (works No 3834) was supplied by Hawthorn Leslie in 1934.[1]

On the merger with Hetton Collieries in 1911, the Lambton Railway had 33 locomotives (12 with tnders), while the Hetton Railway had 8.[2] In 1924, these were supplemented by the merger with Joicey Collieries, which brought an additional 57 locomotives. In 1931, the company bought redundant 0-6-2T from the Great Western Railway: No's 52, 53 and 54 were ex-Taff Vale Railway; No's 55 and 56 were ex-Cardiff Railway. locomotives.[1]

All locomotives on the Lambton Railway were built or modified to a unique loading gauge, which resulted in a rounded-cab profile. This was to enable them to work down the narrow bored tunnel to Lambton Drops (coal staiths) at the Port of Sunderland.[3]

Lambton Engine Works

Ex-Lambton Collieries 0-6-2T passes the former Lambton Engine Works at Philadelphia, Tyne and Wear, 1970

By 1882, the original overhaul and heavy maintenance facilities were inadequate for the railway's extensive operations, and so a new "Earl of Durham Works" was built in Philadelphia, which was quickly renamed the Lambton Engine Works. Consisting of two through-running roads for loco repairs, the rest of the structure was filled with machinery. Adjacent to the building were boiler, fitting and machine shops, so that the Works was almost self-contained, with new boilers and fireboxes being the only major items purchased from outside contractors.[2]

In 1917, the works was supplemented by the addition of a running shed.[1] After the merger with Hetton Collieries, that systems Works stayed open until the winter of 1934–1935.[2] After the creation of the NCB in 1947, the Works became the regional centre for all major repairs and all overhauls.[2]

Both the works and running shed buildings still stand today.[1]

Preserved Locomotives

Six locomotives that ran over the Lambton Railway and its successors are known to remain in preservation.[4]

Fleet Number Builder Build Date Works Number Current Location Status Notes
5 Robert Stephenson and Company 1909 3377 North Yorkshire Moors Railway Awaiting Major Overhaul 0-6-2T
14 Hawthorn Leslie 1914 3056 Tanfield Railway Awaiting Overhaul 0-4-0ST
29 Kitson and Company 1904 4263 North Yorkshire Moors Railway Out of Service due to Cracked Cylinder 0-6-2T
52 Neilson and Company 1899 5408 Keighley & Worth Valley Railway Under Overhaul 0-6-2T. Ex-TVR Class O2 number 85, GWR number 426. To LH&JC 1929.
60† Hunslet Engine Company 1948 3686 Morpeth Under overhauil in Northumberland 0-6-0ST
67† Taff Vale Railway 1897 306 Llangollen Railway Under Cosmetic Restoration 0-6-2T, Ex-TVR Class O1 number 28, GWR number 450. To LMR 1927, became W.D 205 then 70205. To NCB 1947.

† Only operated on the Ex-Lambton Hetton & Joicey lines during National Coal Board ownership.

References

  1. 1 2 3 4 5 6 7 8 9 10 "Brief History of the Lambton Railway". LambtonLocomotivesTrust.co.uk. Retrieved 17 March 2013.
  2. 1 2 3 4 5 6 "Lambton Engine Works". Industrial Railway Society. Retrieved 17 March 2013.
  3. "J94 of the Lambton Colliery Railway". lampwortroy. Retrieved 18 March 2013.
  4. "So where are the remaining Lambton locomotives?". LambtonLocomotivesTrust.co.uk. Retrieved 23 August 2013.

External links

This article is issued from Wikipedia - version of the Saturday, March 26, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.