Layher

Layher Holding GmbH & Co. KG
GmbH & Co. KG
Founded 1945 by Wilhelm Layher
Headquarters Güglingen, Germany
Key people
Carolin Langer
Georg Layher
Number of employees
1,240 (2008/2009)
Website www.layher.com

Layher Holding GmbH & Co. KG is a globally leading[1] German manufacturer of scaffolding, protective and event systems and ladders. The company operates two production facilities in Germany. The headquarters in Güglingen-Eibensbach produces steel scaffolding components, while the second plant in neighbouring Güglingen makes aluminium and wooden components.[2]

History

The timber merchant Wilhelm Layher established the company in 1945 to make agricultural implements and ladders out of wood. As the German economy recovered, he identified the need for construction scaffolding, and by 1948 was already specializing in the production of ladder scaffolding. His daughter, Ruth Langer, and his two sons, Eberhard and Ulrich Layher, also worked in the company and successfully continued the business after the death of the founder in 1962.[3] Under their management, Layher evolved into the biggest manufacturer of system scaffolding: with SpeedyScaf in 1965 and Allround Scaffolding in 1974, not only were the systems which are still standard today marketed, but also – starting in 1970 – the first steps towards internationalization were taken, with subsidiaries in the Netherlands, France and Switzerland.[4]

In 1987, Eberhard Layher decided to retire for age and health reasons, selling his share to his brother and sister.[5] Still 100 percent family-owned today,[6] Layher now has subsidiaries in more than 35 countries[7] and partner companies all over the world. In Germany, operative business is handled by Wilhelm Layher GmbH & Co. KG, managed by Helmut Kreller and Jochen Kirchner. The company has 31 service centres all over Germany, but does not itself offer any scaffolding construction services:[8] instead it acts only as the manufacturer and supplier for customers from scaffolding, crafts, construction, industry and the events business.[9] Its associate company – Layher Bautechnik GmbH based in Ulm – sells not only Layher scaffolding systems, but also construction equipment, construction machinery and warehouse equipment. Its managing director is Hans Kächler.

Products

The family owns 600 patents and protective rights worldwide.[10] In 1965, the system scaffolding specialist designed, for example, the definitive insertion-frame system for facade scaffolding construction, with its SpeedyScaf made from steel and aluminium. In 1974, Allround Scaffolding superseded conventional scaffolding construction techniques, using steel tubes and couplers, with its bolt-free wedge-head connection technology. Layher presented its further innovation at the Bauma fair in 2013: Allround Lightweight. Using higher-strength steel made it possible to reduce the component weight in its new system scaffolding generation without any loss in load-bearing capacity.[11] Matching the scaffolding systems, there are also protective systems like temporary roofs and facade coverings for site protection and – based on a substructure using Allround equipment – the Event System for constructing temporary stages or stands. Access technology made of aluminium and wood is also part of the product range.[12]

Projects

System scaffoldings are not only being used for work and protective scaffolding, but also for a variety of further tasks: for instance shoring, temporary access or site protection. Today Layher products are worldwide in use on sites, in the industry or in sports and cultural events. In 2009, for example, a 150 metre long and 56 metre high ski ramp was assembled in Moscow as a promotional event for the 2014 Winter Olympics using about 1,300 tons of Allround Scaffolding.[13] For viewing the excavations in ancient Pompeii, a weather protection roof and a temporary pedestrian walkway were erected in 2010 using Allround Scaffolding.[14] This modular system was also used a short time later for the Cannstatter Volksfest – not as a pedestrian walkway but as a 30 metre wide escape stairway.[15] The use of the Allround Bridging System in 2012 enabled the scaffolding for the stave church in Borgund, Norway.[16] In 2013 followed the construction of a 600 square metre Allround Shoring TG 60 structure for the pumped storage power station project “Linthal 2015” in Switzerland.[17] Also high in the Swiss mountains, the SpeedyScaf ensured in 2014 the rapid assembly of a work scaffold at the “Hörnli Hut” below the Matterhorn,[18] and the “Arup Building” of the University of Cambridge was temporarily roofed over using a 2,600 square metre Keder Roof XL.[19] Currently a 100,000 cubic metre construction of Allround Scaffolding and Allround Lightweight ensures the restoration of the Adolphe Bridge in Luxembourg.[20]

Awards

Weblinks

References

  1. Florian Langenscheidt, Bernd Venohr (Hrsg.): Deutsche Standards. Lexikon der deutschen Weltmarktführer. Die Königsklasse deutscher Unternehmen in Wort und Bild. Gabal, Köln 2010, ISBN 978-3-86936-221-2.
  2. Heilbronner Stimme, 22.10.2009, Layher feiert sein neues Werk
  3. Isoliertechnik, 6/95, In 50 Jahren von 0 auf 600
  4. PRO-MAGAZIN, 1/2007, Gut gerüstet in die Zukunft
  5. Isoliertechnik, 6/95, In 50 Jahren von 0 auf 600
  6. Bietigheimer Zeitung, 04.02.2012, Layher: Legos für Männer am Bau
  7. Allgemeine Bauzeitung, 24.04.2015, Gerüstkonstruktion exakt an Architektur angepasst
  8. Allgemeine Bauzeitung, 24.04.2015, Wir machen unseren Kunden keinerlei Wettbewerb
  9. Allgemeine Bauzeitung, 24.04.2015, Gerüstkonstruktion exakt an Architektur angepasst
  10. bpz Baupraxis Zeitung, 3/2000, Ein Werdegang wie im Drehbuch
  11. Allgemeine Bauzeitung, 26.04.2013, Neues Systemgerüst - leichtere Bauteile und höhere Tragfähigkeit
  12. Allgemeine Bauzeitung, 24.04.2015, Gerüstkonstruktion exakt an Architektur angepasst
  13. Deutsches Baublatt, 1+2/2009, Skirennen mitten in Moskau
  14. Der Gerüstbauer, 6/2010, Live-Veranstaltung im Haus der keuschen Liebenden
  15. Bautechnik, 12/2011, Für den Ernstfall "gerüstet"
  16. Bietigheimer Zeitung, 18.02.2012, Güglinger Gerüst für Kirche
  17. Der Bauunternehmer, 06/2013, Erfolgreicher Großeinsatz für das Traggerüst TG 60 von Layher bei "Linthal 2015"
  18. Allgemeine Bauzeitung, 16.05.2014, Sicherer Gerüstbau am Matterhorn
  19. Allgemeine Bauzeitung, 16.05.2014, Kederdach für raschen Baufortschritt
  20. bd baumaschinendienst, 3/2015, Brückensanierung leicht gemacht
  21. http://www.tqu-group.com/kompetenzpreis-bw/preis2011.htm
  22. http://www.baumagazin.eu/auszeichnung-fur-energieeffizienz
  23. http://www.rusztowania-izba.org.pl/index.php?cmd=./contests/scaffold_of_the_year/edycja04/etap1.htm
This article is issued from Wikipedia - version of the Tuesday, August 18, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.