Lehigh Line (Norfolk Southern)

For other uses, see Lehigh Line.
Lehigh Line
also known as NS Lehigh Line or Norfolk Southern Lehigh Line, formerly known as Lehigh Valley Mainline, mistakenly referred to as Lehigh Valley Line

NS 21M rolls through Easton, Pennsylvania on the Lehigh Line in 2006.
Overview
Type Freight rail
System

Norfolk Southern Railway (includes Canadian Pacific trackage rights) (1999-present)

Status

Operational (1855–present)

Locale New Jersey and Pennsylvania
Termini East End- Port Reading Junction in Manville, New Jersey (was Newark, New Jersey, Jersey City, New Jersey, Perth Amboy, New Jersey, Easton, Pennsylvania)
West End- M&H Junction in Old Penn Haven, Pennsylvania (was Mehoopany, Pennsylvania, Sayre, Pennsylvania, Buffalo, New York, Jim Thorpe, Pennsylvania, Allentown, Pennsylvania)
Operation
Opened June 11, 1855 between Easton, Pennsylvania and Allentown, Pennsylvania by the Lehigh Valley Railroad, 161 years ago (The line was built on pass its opening year up until the early 20th Century and was shortened and integrated former Central Railroad of New Jersey owned or leased trackage in the late 20th Century, leased trackage came from the defunct Lehigh and Susquehanna Railroad)
Owner

Norfolk Southern Railway (a Norfolk Southern Corporation company) (1999–present)

Operator(s)

Norfolk Southern Railway (a Norfolk Southern Corporation company) (1999–present)

Technical
Number of tracks 1-2
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Operating speed almost all of line is 50 MPH for freight traffic[1]

The Lehigh Line (also known as NS Lehigh Line or Norfolk Southern Lehigh Line and formerly and historically known as Lehigh Valley Mainline) is a major freight railroad line that operates in New Jersey and Pennsylvania that is owned and operated by the Norfolk Southern Railway; the Norfolk Southern Railway is a Eastern United States based Class 1 railroad that is owned and operated by the Norfolk Southern Corporation. The line runs from Port Reading Junction in Manville, New Jersey to M&H Junction near Old Penn Haven, Pennsylvania and passes through the three cities in the Lehigh Valley along its route: Easton, Pennsylvania, Bethlehem, Pennsylvania and Allentown, Pennsylvania.[2] The Lehigh Line also passes by the former headquarters of the Bethlehem Steel corporation in Bethlehem, Pennsylvania which is now the Sands Casino Resort Bethlehem. The Lehigh Line was established in 1855 and has been operating for about 161 years; the line's current form though has been around for about 16 years since 1999. The majority of the line serves as Norfolk Southern Railway's main corridor (Manville to Bethlehem) in and out of the Port of New York and New Jersey and the New York City metro area. The line is part of Norfolk Southern's Harrisburg Division and the majority of the line (Manville to Bethlehem) is part of Norfolk Southern's Crescent Corridor, a railroad corridor. The line has been mistakenly referred to as Lehigh Valley Line in press releases.

The Lehigh Line was built by the Lehigh Valley Railroad (LV) and began operations in 1855 between Easton, Pennsylvania and Allentown, Pennsylvania (the line was later built on past Easton and Allentown); the Lehigh Line was the Lehigh Valley Railroad's first rail line. The line was the body of the Lehigh Valley Railroad in its early years up until the LV either built more rail lines or railroads, acquired more rail lines or railroads, and merged other railroads into their system. The line's original route was from Easton, Pennsylvania to Allentown, Pennsylvania when the line was opened on June 11, 1855. Along the line's original route, it passes through the city of Bethlehem, Pennsylvania. The line's original route served as the original form of the line which lasted for 3 months starting on the day the line opened until September 11, 1855. The Lehigh Line's original form which lasted for 3 months came to an end as the line branched out to the Northwest pass Allentown to Jim Thorpe, Pennsylvania on September 12, 1855 which is the day after September 11.

The line would later branch out again to the Northwest past Jim Thorpe to the Wilkes-Barre, Pennsylvania area until it reached the Buffalo, New York area. The line also later branched out to the east pass Easton all the way to Perth Amboy, New Jersey which included the building of a wooden bridge (later replaced by a double-tracked iron bridge) over the Delaware River to connect Easton with Phillipsburg, New Jersey. The line's expansion into New Jersey was built by the Lehigh Valley Railroad's Easton and Amboy Railroad and was built as a way to access the New York City area.

Along the Easton to Perth Amboy route of the line, the line's route switched to the Northeast when the LV built a new line pass South Plainfield, New Jersey to reach Jersey City, New Jersey. This new line was constructed by LV subsidaries and not the LV directly which were the Roselle and South Plainfield Railway which was the first LV subsidary to begin construction on the line, the Newark and Roselle Railway, the Newark and Passaic Railway (only a quarter of this railroad was used as part of the line), the Jersey City, Newark and Western Railway, the Greenville and Hudson Railway and the Jersey City Terminal Railway. After the new line was completed by the LV subsidaries, the new line that was heading in the Northeast direction towards Jersey City was not going to be considered a new rail line and instead it became the new part of the New Jersey side of the old line. The route from South Plainfield to Perth Amboy which ran Southeast broke away from the old line and became a new branch line and after that the old line absorbed the new route to Jersey City.

The LV later acquired control of the National Docks Railway and its lower part replaced the Greenville and Hudson Railway without altering its route; the lower part of the National Docks Railway became part of the line. The LV's Edgewater Railway connected to the upper part of the National Docks Railway which the upper part of the National Docks Railway was not part of the line. Some LV subsidiaries that contribute construction to the New Jersey side of the line were later merged with other LV subsidiaries together to form the Lehigh Valley Terminal Railway. The LV created the Lehigh Valley Railroad of New Jersey subsidiary and placed the Lehigh Terminal Railway, the Easton and Amboy, the Greenville and Hudson and other LV subsidiaries under the subsidiary. The railroads under the Lehigh Valley Railroad of New Jersey were merge into the parent Lehigh Valley Railroad of New Jersey; the Lehigh Valley Railroad of New Jersey was eventually merged into the LV. With the line now going Northeast toward the direction of New York City, the line's new end point was Jersey City, New Jersey which was later decreased to Newark, New Jersey.

By the 1930s, the line was known as the Lehigh Valley Mainline.

In 1972, the LV assumed the lease of the remaining Pennsylvania leased trackage of the Central Railroad of New Jersey from the Lehigh and Susquehanna Railroad (L&S) including the main line part of the leased trackage which later was integrated into the line years later. The Lehigh and Susquehanna Railroad continued to own the leased trackage though until 1976 when it was merged into Conrail along with the LV.

The line and the rest of the Lehigh Valley Railroad was absorbed into Conrail in 1976. Conrail maintained the line as a primary main line into the New York City area and the line became known as the Lehigh Line during the Conrail ownership. Conrail maintained the line's original route but did not retain all of the line's original right of way that represented the line's original route. Conrail integrated the Bethlehem and Allentown segment of the main line part of the former CNJ Pennsylvania leased trackage that was formerly owned by the Lehigh and Susquehanna Railroad that the LV acquired the lease in 1972 into the Lehigh Line's original route and transferred most of the line's original right of way between Bethlehem to Allentown to the ex-Reading Railroad's Reading Line which Conrail inherited also. The line's original route's new right of way is now former Lehigh and Susquehanna Railroad owned CNJ Pennsylvania leased main line trackage between Allentown and Bethlehem with a bridge over the Lehigh River to the Bethlehem to Easton part of the original right of way; the line kept the original right of way between Bethlehem and Easton. The original route's new right of way kept the line in continuous operation since 1855 and the line was eligible to continue as the same rail line that was built and opened in 1855 by the Lehigh Valley Railroad.

With Conrail transferring most of the line's original right of way between Allentown and Bethlehem to the Reading Line and allowing the line to keep the majority of its original right of way which is between Bethlehem and Allentown, Conrail also integrated former Lehigh and Susquehanna Railroad owned CNJ Pennsylvania leased main line trackage between Allentown and Lehighton, Pennsylvania into the Lehigh Line; this allowed the line to keep its Allentown and Lehighton route and also continue to Jim Thorpe. The line's old right of way between Allentown and Lehighton was then separated from the Lehigh Line.

Conrail was able to integrate the former Lehigh and Susquehanna Railroad owned CNJ Pennsylvania leased main line trackage into the line because Conrail also acquired the Lehigh and Susquehanna Railroad in 1976 along with the LV.

With the line integrating former Lehigh and Susquehanna Railroad owned CNJ Pennsylvania leased main line trackage into both its original route and into its route between Allentown and Lehighton, Conrail integrated other CNJ trackage (this time was officially owned by the CNJ itself) around Phillipsburg into the line and have both the line's LV trackage in Phillipsburg and the line's new CNJ trackage in Phillipsburg be part of the line at the same time; this lasted until the mid to late 1980's when decided to close and abandon the line's LV Phillipsburg trackage which includes the LV Phillipsburg bridge due to the LV Phillipsburg bridge needing repairs in favor of using the CNJ Phillipsburg trackage full time which includes the CNJ Phillipsburg bridge which is more stable than the LV Phillipsburg bridge.

With the Lehigh Line using its original tracks from the former LV and using its new owned or leased trackage from the former CNJ, the line would lose its route in the Buffalo, New York area as Conrail downsized the Lehigh Line in New York State all the way down to Sayre Yard in Sayre, Pennsylvania; the line ran from Newark to Sayre for the majority of its time under Conrail. Conrail later decreased the line to Mehoopany, Pennsylvania and passed Mehoopany to Sayre, the tracks became a new rail line called the Lehigh Secondary. Finally, the line was decreased for one last time under Conrail, the line was decreased to its current west end point which is M&H Junction near Old Penn Haven, Pennsylvania; passed M&H Junction, the tracks became a new rail line called the Lehigh Division which remain under Conrail until it was later sold to the Reading Blue Mountain and Northern Railroad (RBMN) in 1996. The RBMN would later decrease the Lehigh Division from Mehoopany to Dupont, Pennsylvania and the tracks from Dupont to Mehoopany became a new rail line called the Susquehanna Branch.

In 1999, the Norfolk Southern Railway acquired the Lehigh Line in the Conrail split with CSX Transportation but the line lost its existing tracks from Manville, New Jersey to Newark, New Jersey in the process in order for both Norfolk Southern and CSX to have equal competition in the Northeast; the existing Manville to Newark tracks made up almost half of the line's route in New Jersey. The existing tracks from Manville to Newark became a new rail line and for equal competition, Norfolk Southern along with CSX own the new rail line under a joint venture. However, for historical purposes, the part from Manville to Newark is considered a new rail line and not the original line and the Norfolk Southern part is considered the original line and not a new rail line. The Lehigh Line's east end point is now at Port Reading Junction in Manville, New Jersey; this is currently the line's last time it is downsized.

The Lehigh Line hosts approximately twenty-five trains per day. The line passes through the approximately 5,000 foot Pattenburg Tunnel in West Portal, New Jersey along its route. Most of the traffic along the line consists of intermodal and general merchandise trains going to yards such as Oak Island Yard in Newark and Croxton Yard in Jersey City. The line makes notable connections with other Norfolk Southern lines such as the Reading Line, the Washington Secondary, the Cement Secondary, the Ashmore Secondary, the Portland Secondary and the Stroudsburg Secondary (formerly part of the Lackawanna Old Road and passes underneath the Lackawanna Cut-Off) and connects with regional and short line railroads such as the Reading Blue Mountain and Northern Railroad, the Black River and Western Railroad and the Belvidere and Delaware River Railway.

History

Background

The Lehigh Valley Railroad system, the Lehigh Line as it appeared under Lehigh Valley Railroad ownership is in bold black and the branch lines are in non bold black

The Lehigh Line was built by the Lehigh Valley Railroad (reporting mark LV) and opened on June 11, 1855 between Easton, Pennsylvania and Allentown, Pennsylvania. The Lehigh Valley Railroad was authorized on April 21, 1846 in Pennsylvania and officially established on September 20, 1847 as the Delaware, Lehigh, Schuylkill and Susquehanna Railroad Company; the railroad's name was changed to Lehigh Valley Railroad on January 7, 1853.

The LV was one of a number of railroads built in the northeastern United States to primarily haul anthracite coal. The transporting of anthracite by the LV was faster than transporting the anthracite by boat down the Lehigh River; the LV replaced the transportation of anthracite down the Lehigh River. The LV was nicknamed the Route of the Black Diamond for its transportation anthracite.

The Lehigh Line was the Lehigh Valley Railroad's first rail line and served as the body of the railroad in its early years until the railroad built or acquired other rail lines to connect with the line. The line later became the Lehigh Valley Railroad's main route from the New York City area to Buffalo, New York.

The Lehigh Line would later went on to serve as part of Conrail from 1976 to 1999 along with the integration of the Pennsylvania part of the Central Railroad of New Jersey main line and as part of Norfolk Southern Railway since 1999.

Lehigh Valley Railroad ownership

1850's: The Beginning

The Lehigh Valley Railroad opened the Lehigh Line on June 11, 1855 between Easton, Pennsylvania to Allentown, Pennsylvania which is the line's original route. Along the line's original route, it passes through Bethlehem, Pennsylvania.

The Lehigh Line's route along with the rest of the LV was surveyed and grading started in 1850, but progress was slow and financing was insufficient. The LV opened the line on June 11, 1855 for the transportation of passengers extending from the South Easton bough in Easton to Allentown. From Easton to Allentown, the LV ran two trains daily from its opening date until September 11, 1855.[3] During this time, the line's route from Easton to Allentown served as the original form of the line which lasted for 3 months. At the same time, the LV was finishing construction of an extension of the line from Allentown to Mauch Chunk (present-day Jim Thorpe, Pennsylvania).

At Easton, the LV interchange coal at the Delaware River where the coal could be shipped to Philadelphia on the Delaware Division Canal or transported across the river to Phillipsburg, New Jersey, where the Morris Canal and the Central Railroad of New Jersey (CNJ) could carry it to New York City. Later, the LV constructed a double-decked bridge across the Delaware River for connections to the CNJ and the Belvidere Delaware Railroad in Phillipsburg.[4]

On September 12, 1855 which was 3 months after the line opened between Easton and Allentown, the line's original form which was from Easton and Allentown came to an end by having the LV opening passenger service for travel to Mauch Chunk from Allentown with, one train a day being run until October 1, 1855.[3] After October 1, 1855, the LV added more passenger services to the Allentown-Mauch Chunk route.

The line became the trunk line down the Lehigh Valley, with numerous feeder railroads connecting and contributing to its traffic. The line brang the Middle Coal Field's anthracite production to the LV over feeders to the Beaver Meadow Railroad and Coal Company

1860's: New York expansion

The 1860s saw an expansion of the LV and the line with an expansion northward to the Wilkes-Barre, Pennsylvania area and up the Susquehanna River to the New York state line. In 1864, the LV began acquiring feeder railroads and merging them with its system. The first acquisitions were the Beaver Meadow Railroad and Coal Company which included a few hundred acres of coal land and the Penn Haven and White Haven Railroad. The purchase of the Penn Haven and White Haven was the first step in expanding to Wilkes-Barre. To reach Wilkes-Barre, the LV began constructing an extension from White Haven to Wilkes-Barre.

In 1866 the company acquired the Lehigh and Mahanoy Railroad (originally the Quakake Railroad) and the North Branch Canal along the Susquehanna River, renaming it the Pennsylvania and New York Canal & Railroad Company (P&NY).[5] The purchasing of the North Branch Canal saw an opportunity for a near monopoly in the region north of the Wyoming Valley. In 1867, a year after the purchase of the Penn Haven and White Haven, the extension from White Haven to Wilkes-Barre opened.

Construction of a rail line to the New York state line started immediately and by 1869 was complete from Wilkes-Barre to Waverly, New York, where coal was transferred to the broad gauge Erie Railroad and shipped to western markets through Buffalo, New York.[6] By 1869, the LVRR owned a continuous track through Pennsylvania from Easton to Waverly.

1870's: New Jersey expansion

Easton and Amboy Railroad map

In the 1870s the railroad acquired other large tracts of land starting at 13,000 acres (53 km2) in 1870,[6] with an additional of 5,800 acres (23 km2) in 1872,[7] and turned its eye toward rail expansion across New Jersey all the way to the New York City area.

In 1872 the Lehigh Valley Railroad purchased the dormant charter of the Perth Amboy and Bound Brook Railroad which had access to the Perth Amboy, New Jersey harbor, and added to it a new charter, the Bound Brook and Easton Railroad; these two railroads were merged together to form a new railroad company called the Easton and Amboy Railroad.[8][9] The Easton and Amboy Railroad was a railroad built across central New Jersey by the Lehigh Valley Railroad to run across Western New Jersey from Phillipsburg to Bound Brook, New Jersey and it was built to connect the Lehigh Valley Railroad coal hauling operations in Pennsylvania and the Port of New York and New Jersey to serve consumer markets in New York metropolitan area. Until it was built, the terminus of the LV had been at Phillipsburg, New Jersey on the Delaware River opposite Easton, Pennsylvania. The Easton and Amboy was used as a connection to the New York metropolitan area, with a terminus in Jersey City, New Jersey.

Construction commenced in 1872 as soon the Easton and Amboy was formed; coal docks at Perth Amboy were soon constructed, and most of the line's new expanded New Jersey route from Easton to Perth Amboy was graded and rails laid. However, the route required building a wooden bridge over the Delaware River to connect Easton with Phillipsburg, New Jersey and build a 4,893-foot (1,491 m) tunnel through/under Musconetcong Mountain near Pattenburg, New Jersey (about twelve miles east of Phillipsburg),[10] and that proved troublesome. The tunnel delayed the opening of the Easton and Amboy part of the line until May 1875 (the line was completed in 1875[11]), when a coal train first passed over the line. To support the expected increase in traffic, the wooden bridge over the Delaware River at Easton was also replaced by a double-tracked, 1,191-foot (363 m) iron bridge.[12]

At Perth Amboy, a tidewater terminal was built on the Arthur Kill comprising a large coal dock used to transport coal into New York City. These tracks were laid and started hauling coal in 1875. Operations continued until the LVRR's bankruptcy in 1976.[13] The marshalling yard is now the residential area known as Harbortown.

Passenger traffic on the LV's Easton and Amboy connected with the Pennsylvania Railroad (PRR) at Metuchen, New Jersey and continued to the PRR'S Exchange Place terminus in Jersey City (that connection was discontinued in 1891 after the LV established its own route to Jersey City from South Plainfield).

Eventually, the Easton and Amboy Railroad was absorbed into the parent Lehigh Valley Railroad.

The route which was contructed by the LV's Easton and Amboy still exists but the rail line now stops at Manville, New Jersey and pass Manville, the route continues as a new rail line. The route from Manville to Perth Amboy (now Manville to Newark, New Jersey) was separated into a new rail line in 1999; the route from Manville to Easton continued as the original line. The Lehigh Line's Manville to Easton route is most popular among railfans; the Lehigh Line's original route (Easton to Allentown) is though not most popular among railfans.

In 1875, the LV financed the addition of a third rail line to the Erie line so that cars could roll directly from colliery to the port at Buffalo.[14]

1880's

In 1882, the LV began an extensive expansion into New York. First, it purchased a large parcel of land in Buffalo, the Tifft farm, for use as terminal facilities, and obtained a New York charter for the railroad.[15] Then in 1887 the Lehigh Valley Railroad obtained a lease on the Southern Central Railroad, which had a route from Waverly northward into the Finger Lakes region.[16] At the same time, the LV organized the Buffalo and Geneva to build from the northern end of Seneca Lake to Buffalo. Finally, in 1889, the LVRR gained control of the Geneva, Ithaca, and Sayre Railroad and completed its line of rail through New York.[17] As a result of its leases and acquisitions, the LV gained a monopoly on traffic in the Finger Lakes region. The railroad continued to grow and develop its routes in Pennsylvania.

Also in Pennsylvania, the LV obtained a charter formerly held by the Schuykill Haven and Lehigh River Railroad in 1886 which had been held by the Reading Railroad since 1860 when it had blocked construction in order to maintain its monopoly in the Southern Coal Field which held the largest reserves of anthracite in Pennsylvania. Through neglect, the Reading allowed the charter to lapse and it was acquired by the LV which immediately constructed the Schuylkill and Lehigh Valley Railroad and connected it with the mainline. The line gave the LV a route into Pottsville, Pennsylvania and the Schuylkill Valley coal fields.[18]

Map of the Jersey City terminal

In New Jersey, the LV had a decade-long legal battle with the CNJ over terminal facilities in Jersey City, New Jersey. In 1887 the two railroads reached a settlement, and construction of the LVs Jersey City freight yard began.[19] The LV obtained a 5-year agreement to use the CNJ line to access the terminal, which opened in 1889. The LV built a separate yard at Oak Island in Newark, New Jersey to sort and prepare trains.

The LV strove throughout the 1880s to acquire its own route to Jersey City and to the Jersey City waterfront. The LV decided to expand the line more to the Northeastern part of New Jersey in order to reach its freight yards without using the CNJ main line.

Map of the Roselle and South Plainfield Railway

The LV began construction of a series of railroads to connect the Easton and Amboy line (Easton and Amboy Railroad) to Jersey City; the new route to Jersey City would connect with the Easton and Amboy line at South Plainfield, New Jersey. The first leg of the construction to Jersey City was the Roselle and South Plainfield Railway in 1888 connected with the CNJ at Roselle, New Jersey which provided access over the CNJ to the Hudson River waterfront in Jersey City, New Jersey. The LV which had built coal docks in Perth Amboy, New Jersey when it built the Easton and Amboy in the 1870s, desired a terminal on the Hudson River close to New York City. In 1891, the LV consolidated the Roselle and South Plainfield Railway into the Lehigh Valley Terminal Railway, along with the other companies which formed the route from South Plainfield to the Jersey City terminal.

Initially, the LV contracted with the CNJ for rights from Roselle to Jersey City, but the LV eventually finished construction of the line to its terminal in Jersey City over the Newark and Roselle Railway, the Newark and Passaic Railway, the Jersey City, Newark, and Western Railway, and the Jersey City Terminal Railway. The LV's Newark and Roselle Railway in 1891 brought the line from Roselle into Newark, where passengers connected to the Pennsylvania Railroad. Bridging Newark Bay proved difficult. The LV first attempted to obtain a right of way at Greenville, but the Pennsylvania Railroad checkmated them by purchasing most of the properties needed. Then the CNJ opposed the LV's attempt to cross its line at Caven Point. Finally after settling the legal issues, the Newark Bay was bridged in 1892 by the Jersey City, Newark and Western Railway and connected to the National Docks Railway, which was partly owned by the LV and which reached the LV's terminal.

In 1895, the LV constructed the Greenville and Hudson Railway parallel with the National Docks in order to relieve congestion and have a wholly owned route into Jersey City. Finally in 1900, the LV purchased the National Docks Railway outright.

1890–1920

The LV's Black Diamond in 1898.

After the completion of its terminals at Buffalo and Jersey City, and the establishment of a trunk line across New York, the LV entered a period of turmoil in the 1890s with the company being entangled in business dealings. In 1892, the Reading Railroad leased the LV and the CNJ and purchased the railroads' coal companies instead of attempting to maintain agreements among the coal railroads. The Reading than arranged for the Delaware, Lackawanna and Western Railroad to cooperate with the combination, thereby controlling 70% of the trade.[20][21] Unfortunately, it overreached and in 1893 the Reading was unable to meet its obligations. Its bankruptcy resulted in economic chaos, bringing on the financial panic of 1893 and forcing the LV to break the lease and resume its own operations, leaving it unable to pay dividends on its stock until 1904. The economic depression following 1893 was harsh though the LV owned or controlled 53,000 acres (210 km2) of coal lands by then .[20]

In 1897 the LV was in dire need of support. The banking giant J. P. Morgan stepped in to refinance the LV debt, and obtained control of the railroad in the process.

The LV along with other railroads, were nationalized during World War I (1914-1918) in order to prevent strikes and interruptions. The LV built a passenger terminal in Buffalo in 1915. The United States Railroad Administration controlled the LV from 1918 to 1920, at which time control was transferred back to the private companies.

1921–1953

The LV's John Wilkes in Allentown, Pennsylvania, 1935

The Great Depression started and the LV began a slow decline eventhough it had a few periods of prosperity. Passengers preferred the convenience of automobiles to trains, and airlines provided faster long-distance travel than trains. Oil and gas were supplanting coal as the fuel of choice. The Depression had been difficult for all the railroads, and Congress recognized that bankruptcy laws needed revision. By 1931, the PRR controlled 51% of the LV stock.

By 1936 when the LV now has feeder lines connecting to its main line which is the railroad's first line, the line became known as the Lehigh Valley Mainline.

The Chandler Acts of 1938-1939 provided a new form of relief for railroads, allowing them to restructure their debt while continuing to operate. The LV was approved for such a restructuring in 1940 when several large mortgage loans were due. The restructuring allowed the LV to extend the maturity of its mortgages, but needed to repeat the process in 1950.[22] The terms of the restructurings precluded dividend payments until 1953 when LV common stock paid the first dividend since 1931.[23] In 1940 the LV came under the influence of the PRR. In 1941, the Pennsylvania placed its shares in a voting trust after reaching an agreement with the New York Central regarding the PRR's purchase of the Wabash.[24] The LV extended the maturity of its mortgages in 1950, made dividend payments until 1953.

1954–1976

The LV faced two blows in the 1950s, the Federal-Aid Highway Act in 1956 and the Saint Lawrence Seaway in 1959. The interstate highways helped the trucking industry offer door-to-door service, and the St. Lawrence Seaway allowed grain shipments to bypass the railways and go directly to overseas markets. Between 1956-1959, the LV again stopped dividends in 1957 .[25] By the 1960s railroads in the East were struggling to survive.

The LV declared bankruptcy on July 24, 1970[26] The LV remained in operation during the 1970 bankruptcy, as was the common practice of the time.

In 1972, the LV assumed the lease of the remaining Central Railroad of New Jersey's Pennsylvania leased trackage from the Lehigh and Susquehanna Railroad including the main line part of the Central Railroad of New Jersey leased trackage which later was integrated into the Lehigh Valley Mainline years later. The Lehigh and Susquehanna Railroad continued to own the leased trackage though until 1976 when it was merged into Conrail along with the LV. Back in 1965, the Central Railroad of New Jersey (which leased the L&S) and the Lehigh Valley Railroad began to work together to eliminate redundant trackage.[27] The Central Railroad of New Jersey was also taken over by Conrail in 1976.

The Central Railroad of New Jersey had entered bankruptcy as well. The two railroads had entered a shared trackage agreement in this area in 1965 to reduce costs as both had parallel routes from Wilkes-Barre virtually all the way to New York, often on adjoining grades through Pennsylvania.

In the years leading to 1973, the freight railroad system of the U.S. was collapsing. Although government-funded Amtrak took over intercity passenger service in 1971, railroad companies continued to lose money due to extensive government regulations, expensive and excessive labor cost, competition from other transportation modes, declining industrial business, and other factors;[28]:226ff the Lehigh Valley Railroad was one of them. Hurricane Agnes in 1972 damaged the rundown Northeast railway network which put the solvency of railroads including the LV in danger.

On April 1, 1976, the Lehigh Valley Railroad including the Lehigh Valley Mainline were merged/absorbed into the U.S. government's Consolidated Rail Corporation (Conrail) ending 130 years of existence and 121 years of operation of the LV.

Conrail ownership

See also: Conrail

1976: Conrail acquires the Lehigh Valley Railroad and the Lehigh Valley Mainline

An earlier Conrail logo

On April 1, 1976, the Consolidated Rail Corporation (reporting mark CR) also known as Conrail acquired the Lehigh Valley Railroad (major portions of its assets) including the Lehigh Valley Mainline and absorbed the Lehigh Valley Railroad into their system. Conrail began operating on the Lehigh Valley Mainline and the remains of the LV immediately.

Conrail was incorporated in Pennsylvania by the U.S. Federal government on October 25, 1974, and began operations April 1, 1976. The U.S. government created Conrail to take over the potentially profitable lines of multiple bankrupt railroads which the LV was one of them. Other bankrupt railroads included the Penn Central Transportation Company and Erie Lackawanna Railway.

Conrail maintained the Lehigh Valley Mainline as a primary main line and the line continued to thrive under its ownership, unlike many lines in the northeast, which were abandoned. The line served as one of Conrail's primary lines headed into the New York City metro area, just like when the line was owned by the Lehigh Valley Railroad. The line was important to Conrail as an alternate route to avoid Amtrak's Northeast Corridor, its main line and main electrified route. Conrail's other primary line headed into the New York City metro area was the River Subdivision which travels from the North Bergen Yard located in North Bergen, New Jersey to Selkirk Yard located in the Selkirk section of Bethlehem, New York; the River Subdivision is now owned by CSX Transportation, a railroad that is owned by the CSX Corporation. Also during the Conrail ownership, the line meet with Conrail's secondary line headed into New York City metro area in Manville, New Jersey, the Trenton Subdivision which travels from Philadelphia, Pennsylvania to Manville; the Trenton Subdivision is now owned by CSX Transportation.

1976–1987: Conrail renames the line to Lehigh Line and reconfigures the line with former Lehigh and Susquehanna Railroad owned trackage

The line was renamed from Lehigh Valley Mainline to Lehigh Line during the Conrail ownership.

With the line now known as the "Lehigh Line", Conrail maintained the line's original route ever since the line opened on June 11, 1855. However, Conrail kept most of the Lehigh Line's original right of way that represented the line's original route and Conrail did not retain all of the line's original right of way that represented the line's original route. Only a small portion of the line's original right of way was not retained as part of the line's original route which is between Bethlehem and Allentown. The line retain the majority of its original right of way which is between Easton and Bethlehem.

Conrail integrated the Bethlehem and Allentown segment of the main line part of the former Central Railroad of New Jersey (CNJ) Pennsylvania leased trackage that was formerly owned by the Lehigh and Susquehanna Railroad (LH&S) that the LV acquired the lease from the Lehigh and Susquehanna Railroad in 1972 into the Lehigh Line's original route into the Lehigh Line's original route; the Lehigh and Susquehanna Railroad's Bethlehem and Allentown segment of the main line part of the former Central Railroad of New Jersey Pennsylvania leased trackage replaced the Lehigh Valley Railroad built trackage of the Lehigh Line's original route.

The line's original route's new right of way is now is now former Lehigh and Susquehanna Railroad owned Central Railroad of New Jersey Pennsylvania leased main line trackage between Allentown and Bethlehem with a bridge over the Lehigh River to the Bethlehem to Easton part of the original right of way. The Lehigh Line kept the original right of way between Bethlehem and Easton. The original route's new right of way has kept the Lehigh Line in continuous operation since 1855 and kept the line's original route still in operation. The Lehigh Line was allowed to continue as the same rail line that was built and opened on June 11, 1855 by the Lehigh Valley Railroad.

After the reconfiguration of the Lehigh Line's original route by having the Lehigh Valley Railroad built tracks between Bethlehem to Allentown break away from the line's original route and replacing them with the Central Railroad of New Jersey build tracks, the Lehigh Valley Railroad built tracks from Bethlehem to Allentown that use to be part of the Lehigh Line's original right of way which were no longer going to be part of the Lehigh Line's original route were either transferred to the ex-Reading Railroad's Reading Line which was also inherited by Conrail or were left out of Reading Line transfer and became their own separate rail lines. The Lehigh Valley Railroad built tracks from Bethlehem to Allentown that became their own separate rail lines were downgraded to branch lines; these rail lines are now owned by R.J. Corman Railroad/Allentown Lines company which is a subsidiary of R.J. Corman Railroad Group.

With Conrail integrating the Lehigh and Susquehanna Railroad's Bethlehem and Allentown segment of the main line part of the former Central Railroad of New Jersey Pennsylvania leased trackage into the Lehigh Line's original route while allowing the Lehigh Line to keep the majority of its original right of way which is between Bethlehem and Allentown and transferring most of the Lehigh Line's original right of way between Allentown and Bethlehem to the Reading Line, Conrail also integrated former Lehigh and Susquehanna Railroad owned Central Railroad of New Jersey Pennsylvania leased main line trackage between Allentown and Lehighton, Pennsylvania into the Lehigh Line's route from Allentown to Jim Thorpe; this allowed the line to keep its Allentown and Lehighton route and also continue to Jim Thorpe. The line's old right of way between Allentown and Lehighton was then separated from the Lehigh Line.

Background of the former Lehigh and Susquehanna Railroad owned trackage

Conrail was able to integrate the former Lehigh and Susquehanna Railroad owned Central Railroad of New Jersey Pennsylvania leased main line trackage from Allentown and Bethlehem and from Allentown and Lehighton (which served as most of the Pennsylvania extension of the Central Railroad of New Jersey) into the Lehigh Line because Conrail also acquired and absorbed the Lehigh and Susquehanna Railroad in 1976 along with the Lehigh Valley Railroad. The Lehigh and Susquehanna Railroad was the railroad company for the Lehigh Coal & Navigation Company (LC&N) which were the founders of the Lehigh Canal. The Lehigh and Susquehanna Railroad opened as the nation's second railroad with its initial trackage built from near their Delaware Canal connection with the Lehigh Canal at Easton, Pennsylvania alongside the Lehigh to their Mauch Chunk corporate headquarters, the Mauch Chunk & Summit Hill Railway and their Coaling and Canal operations center (now the west bank part of modern Jim Thorpe, Pennsylvania). The Lehigh and Susquehanna Railroad also started slowly building a connecting line southwards from West Pittston, Pennsylvania and the Duryea yard at the confluence of the Lackawanna and Susquehanna in the greater Wilkes-BarreScranton area (the Wyoming Valley) over the ridges to White Haven, Pennsylvania at the head of the Lehigh Gorge.

When Lehigh Valley Railroad pushed into the Lehigh Valley through (left bank) East Mauch Chunk and (right bank, shared with the Lehigh and Susquehanna Railroad) Packerton, Pennsylvania, the LC&N management suddenly got motivated to have Lehigh and Susquehanna Railroad finish the connecting line through the Lehigh River Gorge. The LV completed its parallel stretch in the same period, creating news media buzz. Despite their experience with the gravity railroad, LC&N management knew they had much to learn about operating the Lehigh and Susquehanna Railroad so looked for an operating company to partner with to operate the line; subsequently, as was common practice for nearly a century with many of the nation's shortline railroads which were built primarily by local business boosters, it was leased to the Central Railroad of New Jersey in 1871 for 999 years[29] and operated it as their Lehigh and Susquehanna Division. In the ensuing years, the Central Railroad of New Jersey would run a prestige express passenger service from New York City and Easton (Philadelphia connection) to Buffalo, New York and points west (Great Lakes region) where they competed with the Lehigh Valley Railroad head to head, parallel tracks sometimes on the same bank or often on the opposite shore of the Susquehanna River.

The Central Railroad of New Jersey leased the Lehigh and Susquehanna Railroad directly from 1871 to 1946 and indirectly using their subsidiary Central Railroad of Pennsylvania (CRP) from 1946 to 1952. The Central Railroad of New Jersey attempt/tried to operate the lease from the Lehigh and Susquehanna Railroad under their subsidiary Central Railroad of Pennsylvania from 1946 to 1952 (not related to the original Central Railroad of Pennsylvania that ran between Bellefonte and Mill Hall). The Central Railroad of New Jersey used the Central Railroad of Pennsylvania to avoid certain New Jersey taxes on their Pennsylvania lines. This idea came about in the 1940s when the Central Railroad of New Jersey wished to avoid those certain New Jersey taxes on its Pennsylvania lines. The Easton and Western Railroad, a short branch west of Easton, Pennsylvania, was renamed to the Central Railroad of Pennsylvania in 1944 and all Pennsylvania leases, primarily the lease to operate on the Lehigh and Susquehanna Railroad, were transferred to it in 1946. The Central Railroad of Pennsylvania began operations on August 5, 1946.[30] Around the same time, the CNJ logo was changed from "Central Railroad Company of New Jersey" to "Jersey Central Lines". The attempt for the Central Railroad of New Jersey to reduce New Jersey Corporate taxes failed; the arrangement was struck down by the courts and so the Central Railroad of Pennsylvania operations were merged back into the Central Railroad of New Jersey six years later which was 1952. In 1972, the Central Railroad of New Jersey ended their leases on the Pennsylvania lines and abandoned their Pennsylvania operations. The leases to the Pennsylvania lines were then operated by the Lehigh Valley Railroad.

1976–1987: Conrail reconfigures the line with former Central Railroad of New Jersey owned trackage

With Conrail integrating former Lehigh and Susquehanna Railroad owned Central Railroad of New Jersey Pennsylvania leased main line trackage into both the Lehigh Line's original route and into the Lehigh Line's route between Allentown and Lehighton, Conrail also integrated other Central Railroad of New Jersey trackage (this time was officially owned by the Central Railroad of New Jersey itself) around Phillipsburg into the line while keeping the LV trackage in Phillipsburg with the line as well and have both the line's LV trackage in Phillipsburg and the line's new CNJ trackage in Phillipsburg be part of the line at the same time; this lasted until the mid to late 1980's when Conrail decided to abandon the line's LV trackage in Phillipsburg.

Conrail added a switch track on the Lehigh Line in Phillipsburg that connects the line's LV Phillipsburg trackage with the line's new ex-CNJ Phillipsburg trackage. Conrail abandoned the left over ex-CNJ Phillipsburg trackage that was not integrated into the Lehigh Line which included abandoning other ex-CNJ on its way to Bloomsbury, New Jersey.

Later on, Conrail closed and abandoned the Lehigh Line's LV Phillipsburg trackage and decided to only use CNJ Phillipsburg trackage. Conrail noticed the LV Phillipsburg bridge needed repairs but as an alternative to save money, Conrail decided to close the LV Phillipsburg bridge and only use the CNJ Phillipsburg bridge full time which resulted in abandoning the line's LV Phillipsburg trackage and only use the CNJ Phillipsburg trackage. The CNJ Phillipsburg bridge is more stable than the LV Phillipsburg bridge.

Post 1987 thru 1999: Countdown to the line's current form

A later Conrail logo

With the Lehigh Line using its original tracks from the former LV and using its new owned or leased trackage from the former Central Railroad of New Jersey, the Lehigh Line would lose its route in the Buffalo, New York area under Conrail.

The Lehigh Line was downsized by Conrail in its later years in New York State all the way down to Sayre Yard in Sayre, Pennsylvania by abandoning or selling the Lehigh Line's former trackage to regional and shortline railroads in the New York state. The Lehigh Line ran from Sayre to Newark, New Jersey for the majority of its time under Conrail. Conrail later decreased the Lehigh Line to Mehoopany, Pennsylvania and passed Mehoopany to Sayre, the tracks became a new rail line called the Lehigh Secondary which was retained with Conrail.

The Lehigh Line was decreased for one last time under Conrail, the line was decreased to its current west end point which is M&H Junction near Old Penn Haven, Pennsylvania. The tracks passed M&H Junction became a new rail line called the Lehigh Division; this new rail line continued as part of Conrail under 1996. The Lehigh Line's route is now from M&H Junction near Old Penn Haven to Oak Island Yard in Newark, New Jersey. The Lehigh Line kept its original route from Easton, Pennsylvania to Allentown, Pennsylvania. Conrail sold the three year old Lehigh Division to the Reading Blue Mountain and Northern Railroad (RBMN) in 1996; the RBMN would later decrease the Lehigh Division from Mehoopany to Dupont, Pennsylvania and the tracks from Dupont to Mehoopany became a new rail line called the Susquehanna Branch. Both the Lehigh Division and the Susquehanna Branch is still in operation and is still owned by RBMN; the Lehigh Division is today one of the main lines of the Reading Blue Mountain and Northern Railroad and today the Norfolk Southern Railway and Canadian Pacific Railway have trackage rights south of Dupont on the Lehigh Division.

Conrail's success was increasing, but in 1997, Conrail was subject with a merger with the CSX Transportation and its parent the CSX Corporation. However, the Norfolk Southern Railway and its parent the Norfolk Southern Corporation disapproved with the merger and began a takeover battle with CSX to purchase Conrail. During the Conrail takeover battle, the Norfolk Southern Railway completed the absortion of the Norfolk and Western Railway which was also owned by the Norfolk Southern Corporation.

Norfolk Southern and CSX struck a compromise and agreed to jointly acquire Conrail and split most of its system and assets between them, with Norfolk Southern acquiring a larger portion of the Conrail network via a larger stock buyout; this returned rail freight competition to the Northeast. Under the final agreement approved by the Surface Transportation Board, Norfolk Southern acquired 58 percent of Conrail's assets, including roughly 6,000 Conrail route miles which included the Lehigh Line, and CSX received 42 percent of Conrail's assets, including about 3,600 route miles.[31]

The buyout was approved by the Surface Transportation Board and both sides took control of Conrail on August 22, 1998; it would take almost a year for both sides to operate their portions that belonged to Conrail after that. The lines were transferred to two newly formed limited liability companies, to be subsidiaries of Conrail but leased to CSX and Norfolk Southern, respectively New York Central Lines (NYC) and Pennsylvania Lines (PRR). The NYC and PRR reporting marks, which had passed to Conrail, were also transferred to the new companies, and NS also acquired the CR reporting mark. Conrail ended operations on May 31, 1999 and its lines were finally split between the two remaining Class I railroads in the East, the Norfolk Southern Railway and CSX Transportation. Both railroads under Norfolk Southern and CSX began operations on the former lines of Conrail on June 1, 1999;[32] the Lehigh Line went to Norfolk Southern Railway. The Norfolk Southern Railway also acquired the Lehigh Secondary which was once part of the Lehigh Line.

Norfolk Southern Railway ownership

1999: The line's current form begins

Norfolk Southern westbound delivery train passing through Three Bridges, Readington Township, New Jersey on the Lehigh Line, Picture 1

On June 1, 1999, Conrail ended operations and its lines were split between Norfolk Southern Railway (which is owned and operated by the Norfolk Southern Corporation) and CSX Transportation (which is owned and operated by the CSX Corporation). The Norfolk Southern Railway which was chartered in 1894 as the Southern Railway in the Southern United States acquired the Lehigh Line in the Conrail split.

With Norfolk Southern acquiring the line, the Lehigh Line wasn't eligible to keep all of its current route and lost its route from CP Port Reading in Manville, New Jersey to the Oak Island Yard in Newark, New Jersey in order for both Norfolk Southern and CSX to have equal competition in the Northeast. The line's former existing tracks from Manville to Oak Island Yard still exist and is still in operation but is now operating as a new rail line that serves as an extension of the Lehigh Line while not being a continuation of the Lehigh Line into Oak Island Yard and that is owned and operated by both Norfolk Southern and CSX under a joint venture called Conrail Shared Assets Operations; the joint venture serves as a switching and terminal railroad for Norfolk Southern and CSX in New Jersey, Philadelphia, and Detroit. Norfolk Southern owns 58 percent of the joint venture and CSX owns 42 percent of the joint venture but both Norfolk Southern and CSX has equal voting interest in the joint venture. Conrail Shared Assets Operations was a concession made to federal regulators who were concerned about the lack of competition in certain rail markets and logistical problems associated with the breaking up the Conrail operations as they existed in densely populated areas with many local customers.

Norfolk Southern eastbound train on the Lehigh Line passing through a crossing near Flemington, New Jersey, Picture 1

The new rail line that is placed under the joint venture shares the “Lehigh Line” name. The new rail line that was once part of the Lehigh Line which handles Norfolk Southern freights off of the Lehigh Line, also handles traffic off of the Trenton Subdivision, CSX's secondary line into the New York City metro area (the River Subdivision is CSX's primary line into the New York City metro area).

With the line losing its route from Manville to Oak Island, the line's new route is now from M&H Junction in Old Penn Haven, Pennsylvania to CP Port Reading in Manville, New Jersey. The line was able to continue as the original line and not as a new rail line despite losing its tracks from Manville to Oak Island Yard with those existing tracks becoming a new rail line sharing the ““Lehigh Line” name because the line kept its original route which is between Easton, Pennsylvania and Allentown, Pennsylvania. The Norfolk Southern Railway continued to improve the Lehigh Line into the 21st century.

2000–Present

To date, the Norfolk Southern Railway retained the trackage rights in place for the Canadian Pacific Railway (owned by Canadian Pacific Railway Limited) to travel on the Lehigh Line from the Conrail years; these trackage rights began with the Delaware and Hudson Railway but Canadian Pacific purchased the Delaware and Hudson and the trackage rights on the Lehigh Line were transfered from the Delaware and Hudson to the Canadian Pacific Railway.

The Lehigh Line was double tracked near Flemington, New Jersey in Hunterdon County.

Amtrak has expressed on bringing passenger service back to the Lehigh Valley with service extending to all three cities- Easton, Bethlehem and Allentown. If approved by Norfolk Southern Railway, the Lehigh Line would once again host passenger rail service for the first time since 1961. However, NJ Transit's Raritan Valley Line is the suspected passenger train service to run its trains on the Lehigh Line.

On Thursday, February 18, 2016 during the afternoon, a mile and a half long freight train with a Union Pacific engine and a Norfolk Southern engine on the Lehigh Line blocked a crossing at Kiceniuk Road in Clinton Township, New Jersey in Hunterdon County. The two engines were near the end of Glenview Drive while the end of the train was near Echo Hill Park on Lilac Road. The train was in place for about an hour and a half and it finally began moving at 6:13 p.m.[33]

Operations- background, connections, passenger services

Background

The Lehigh Line passing by the site of the former Bethlehem Steel plant, which is now the Sands Casino Resort Bethlehem

The Lehigh Line is a major freight railroad line that operates in New Jersey and Pennsylvania that is owned and operated by the Norfolk Southern Railway Company, an Eastern United States Class 1 railroad and primary subsidiary to the Norfolk Southern Corporation. The line runs from Port Reading Junction in Manville, New Jersey to M&H Junction near Old Penn Haven, Pennsylvania.[2] The line began operations at Easton, Pennsylvania to Allentown, Pennsylvania on June 11, 1855. The line then branched out past Allentown to the Northwest and past Easton to the East reaching towns and cities such as Jim Thorpe, Pennsylvania, the Wilkes-Barre, Pennsylvania area, Buffalo, New York, Perth Amboy, New Jersey, Newark, New Jersey and Jersey City, New Jersey.

The line hosts approximately twenty-five trains per day, with traffic peaking at the end of the week. East of the junction with the Reading Line in Allentown, Pennsylvania and in Bethlehem, Pennsylvania, the line serves as Norfolk Southern's main corridor in and out of the Port of New York and New Jersey, and the New York City Metro Area at large, as Norfolk Southern doesn't currently use the eastern half of their Southern Tier Line, which follows the Delaware River north to Binghamton, New York. The line is part of Norfolk Southern's Harrisburg Division and it is part Norfolk Southern's Crescent Corridor, a railroad corridor. The line passes through the approximately 5,000 foot Pattenburg Tunnel in West Portal, New Jersey along its route. Most of the traffic along the line consists of intermodal and general merchandise trains going to yards such as Oak Island Yard in Newark, New Jersey and Croxton Yard in Jersey City, New Jersey. The Lehigh Line passes through the former Bethlehem, Pennsylvania location of the Bethlehem Steel corporation which is now the Sands Casino Resort Bethlehem.

Connections

The line connects with Conrail Shared Assets Operations's Lehigh Line and CSX Transportation's Trenton Subdivision at its east end point at Port Reading Junction in Manville, New Jersey and connects with the Reading Blue Mountain and Northern Railroad's Reading Division at Packerton, Pennsylvania and Reading Blue Mountain and Northern Railroad's Lehigh Division at Lehighton, Pennsylvania and M&H Junction near Old Penn Haven, Pennsylvania (originally it was only M&H Junction near Old Penn Haven, Pennsylvania).

The Lehigh Line makes notable connections with other Norfolk Southern lines such as the Reading Line and independent shortline railroads.

At Three Bridges, New Jersey in Readington Township, the line interchanges with Black River and Western Railroad. At Phillipsburg, New Jersey, the line interchanges with its New Jersey side branch line, the Washington Secondary and the Belvidere and Delaware River Railway which also passes over the Belvidere and Delaware River after that. Across the river in Easton, Pennsylvania, the line interchanges with its Pennsylvania side branch line, the Portland Secondary which extends from Easton to Portland, Pennsylvania connecting to the Stroudsburg Secondary which was originally part of the Lackawanna Old Road (or simply Old Road); the Stroudsburg Secondary goes under the Lackawanna Cut-Off and Norfolk Southern uses the Stroudsburg Secondary to interchange with the Delaware-Lackawanna Railroad.

Passenger services, primarily in the Lehigh Valley

The Lehigh Valley Railroad station. Until the 1950s, the Lehigh Valley Railroad offered 2 hour and 15 minute direct train service to Pennsylvania Station in New York City.
Lehigh Valley Railroad Station looking from the southeast on 371 Hamilton Street in Allentown, Pennsylvania, coordinates: 40°36′14″N 075°27′51″W / 40.60389°N 75.46417°W / 40.60389; -75.46417 (LVRR Station)
Central Railroad of New Jersey's Allentown Terminal Railroad Station looking west on 369 Hamilton Street in Allentown, Pennsylvania, note the Lehigh Valley Railroad station in background, coordinates: 40°36′16″N 075°27′44″W / 40.60444°N 75.46222°W / 40.60444; -75.46222 (CNJ Station)
The LV's Black Diamond arriving at the Allentown station in Allentown, Pennsylvania during its final year of operation (1960).
Cover of the "Black Diamond Express Monthly" (Jan. 1906)

Intro- passenger services on the Lehigh Line and other passenger services in the Lehigh Valley

The Lehigh Line hosted several named passenger trains that was operated by its parent the Lehigh Valley Railroad (LV) mostly in the post-World War II era when the line was known as the Lehigh Valley Mainline, most notably the Black Diamond. Central Railroad of New Jersey (CNJ) passenger trains did travel on the former Lehigh and Susquehanna Railroad owned trackage segments that were integrated into the Lehigh Line during the Conrail ownership.

Allentown, Pennsylvania was once a passenger rail hub (1890 to 1967 and 1978 to 1979) for the Lehigh Valley Railroad and the Central Railroad of New Jersey but also for the Lehigh and New England Railroad, the Reading Railroad, the Lehigh Valley Transit Company and later, Conrail and SEPTA for its Allentown Line service which did not involve the Lehigh Line. Allentown's passenger railroad stations provided inter-city rail service to Allentown.[34] Allentown's

Allentown was served by two passenger train stations, the Central Railroad of New Jersey and the Reading Company Allentown Terminal Railroad Station (constructed in 1888 and 1889) and the Lehigh Valley Railroad Station (built in 1889 directly west of the CNJ station). Both stations were located on the south side of the 300 block of Hamilton Street, the LV station extending over the Jordan Creek.[34] The Allentown Terminal Station was operated jointly by the Central Railroad of New Jersey and Philadelphia and Reading (Reading) Railroad. The Central Railroad of New Jersey and the Reading Railroad leased each other's lines in Pennsylvania.

Routes from Allentown served Wilkes-Barre, Pennsylvania and Scranton, Pennsylvania to the north, Buffalo, New York and Williamsport, Pennsylvania to the northwest, Reading, Pennsylvania and Harrisburg, Pennsylvania to the west, Jersey City, New Jersey and New York City to the east, and Philadelphia to the south.[35]

Allentown currently has no passenger rail service (the last service by SEPTA ceased operating in 1979) but one of its two main train stations remains standing. There is a possibility for passenger rail service to connect the Lehigh Valley area with New York City to eliminate some of the bus traffic. This is being investigated because rail lines already are in place in Phillipsburg, New Jersey, when the town once had rail service. The cost to run new tracks to Allentown is being evaluated to find if train service is worth the money.

Allentown is a regional center for commercial freight rail traffic. Currently, Norfolk Southern Railway's primary hump classification yards are located in Allentown,[36] and the city is also served by the R.J. Corman Railroad Group.[37]

Lehigh Valley Railroad passenger service

The Lehigh Valley Railroad was the primary railroad that operated passenger services on the Lehigh Line.

During the first half of the 19th century, Allentown was primarily a small market town for farmers. It was not until 1851 that the first railroad reached Allentown with the chartering of the Delaware, Lehigh, Schuylkill and Susquehanna Railroad, which later became the Lehigh Valley Railroad. A small station was built in 1855 (the year the LV began operations) which linked the city with Easton, Pennsylvania and later on Mauch Chunk. However, the railroad was not a major factor in local transportation at this time.[38]

The primary passenger motive power for the LV in the diesel era was the ALCO PA-1 car body diesel-electric locomotive, of which the LV had fourteen. These locomotives were also used in freight service during and after the era of LV passenger service. A pair of ALCO FA-2 FB-2 car body diesel-electric locomotives were also purchased to augment the PAs when necessary. These were FAs with steam generators, but they were not designated as FPA-2 units.

The Lehigh Valley Railroad had its peak of passengers during the 1940s, however during the 1950s, the number of railroad passengers declined drastically which caused the Lehigh Valley Railroad to terminate all of its passenger service which happened on February 4, 1961. Budd Rail Diesel Car service would continue on a branch line (Lehighton-Hazleton) for an additional four days. The majority of passenger equipment is believed to have been scrapped some time after February 1961. Most serviceable equipment not retained for company service was sold to other roads.

Passenger services in the Industrial Era

It was in the late 1880s that both railroads built elaborate stations in Allentown, and all the rail lines serving Allentown converged at the two stations.[39] The LV rail lines ran from Allentown to Mauch Chunk, primarily along the west side of the Lehigh River. The lines crossed under the Tilghman Street Bridge past the LV Freight yard north of Walnut Street, then under Linden Street to the passenger station. The lines continued south out of Allentown, then turned east, following the west side of the river through Rittersville, Fountain Hill and South Bethlehem under the Hill to Hill Bridge, past Bethlehem Steel to Easton, Pennsylvania.[40]

The CNJ tracks ran along the east side of the Lehigh from Mauch Chunk, then crossed the river where American Parkway now ends and turns onto North Dauphin Street. The old CNJ crossover bridge remains standing derelict crossing the river. South of Allentown, the CNJ line turned east and again crossed the Lehigh River, following the west side through the CNJ's Allentown yard, which is still operated by Norfolk Southern Railway.

Both railroads' lines into Allentown were double-tracked, paralleling each other into their respective stations following American Parkway, which was later built on the abandoned railbed. A shared, separate double-tracked freight line ran to the east of the passenger stations.[41]

During World War I, both stations were used by the United States Army Ambulance Service (USAAS) that operated Camp Crane, a training camp for Army Ambulance drivers and support personnel. Thousands of soldiers arrived in Allentown at the stations, then were transported to the training camp. After graduating from training, the stations became pre-embarkation point, with thousands of men moving in and out rapidly, usually arriving and leaving on trains in the middle of the night.[34]

The Allentown stations provided passenger rail service for decades to Scranton, Reading, Harrisburg, New York City, Philadelphia and other points along the nation's inter-city rail network.[34]

End of service on the LV and CNJ

The Lehigh Valley Railroad's passenger service in the 1950s declined drastically due to the number of declining patronage as the Interstate Highway network grew and long-distance bus and airline service expanded. Due to declining passenger patronage which caused the LV's passenger service to become unprofitable, the Lehigh Valley Railroad successfully petitioned the Interstate Commerce Commission to terminate all of its passenger service in early 1961. This took effect on February 4, 1961 as the LV ended service to Allentown, Pennsylvania on this date.[42] Budd Rail Diesel Car service would continue on a branch line (Lehighton-Hazleton) for an additional four days.

Central Railroad of New Jersey and the Reading Railroad suffered the same fate in terms of reduced passenger ridership. Reading Railroad Allentown-Harrisburg passenger service was ended in June 1963, and it combined its Allentown service to the Philadelphia Reading Station with the Central Railroad of New Jersey in 1965. It continued operations to Jersey City, New Jersey for two more years before ending all passenger service from Allentown in 1967.[42]

After the end of passenger rail service to Allentown, both the Lehigh Valley and Jersey Central stations were closed and abandoned. Both stations became derelict and the Lehigh Valley station was demolished in 1972 with the widening of the Hamilton Street Bridge over Jordan Creek. Today only some rusting steel beams extending over the Creek remain.[42]

The CNJ rail lines were torn up and Hamilton Street was resurfaced over where the lines had run.[34] The CNJ station remained derelict until 1980 when the property was purchased and the building was restored into a restaurant. The renovated property went though several owners (Depot Restaurant, Gingerbread Man, B&G Station, Jillian's Billiard Cafe) over the next two decades, lastly being called Banana Joe's which opened on Labor Day, 2001. The property abruptly closed in September 2007 after a shooting which caused a dramatic drop-off in patrons. It has remained closed and vacant since then (February 2016); the building slowly deteriorating.[42]

SEPTA

CNJ Allentown Terminal in October 2011

CNJ, LV and the RDG were merged into Conrail in April 1976,[41] and in 1978, the Southeastern Pennsylvania Transportation Authority (SEPTA) reestablished passenger service between Allentown and Philadelphia under Conrail using former LV rails. Because there was no longer a station, SEPTA riders had to utilize a makeshift platform located one block south of the former train station at a gravel lot at Third and Union Streets.

The service was popular with riders, However, it ended as rapidly as it began in 1979 due to poor trackage and loss of the operating subsidy from PennDOT. For commuters traveling from Allentown/Bethlehem and Philadelphia, it had proved faster to drive to the village of Center Valley instead and board trains there.[43]

Possible return of passenger service on the Lehigh Line and in the Lehigh Valley

In November 2008, the Lehigh Valley Economic Development Corporation (LVEDC), along with both Lehigh and Northampton Counties, commissioned a study to explore restoring part of the Black Diamond service (which ran until 1961)[44][45] by extending the New Jersey Transit's Raritan Valley Line to Allentown.[46]

In 2010, a commissioned report studied the extension of passenger train service from Phillipsburg, New Jersey into Pennsylvania with stations in Easton, Bethlehem and Allentown. The Lehigh Valley area has experienced considerable growth over the past several decades, and a large number of commuters use intercity bus service to commute to New York City daily. The proposed rail route would use the Lehigh Line in Easton and Bethlehem and the RJ Corman right-of-way (Lehighton Industrial Track) in Allentown.[47]

The proposed Allentown Station would be located between Hamilton Street and Union Street, with access from Third Street. Parking would be available at the Allentown Bus Terminal or a new parking facility at the station site. LANTA A and E bus lines would serve this station.[47]

Today the only rail service now operating into downtown Allentown is a single-track short haul line that runs on the old LV tracks, terminating at American Parkway and Gordon Streets. There is, however, still a heavily used Norfolk Southern Reading Line that runs through south Allentown and includes a major freight yard.[39]

Lehigh Valley Railroad and Central Railroad of New Jersey passenger trains that where involved with the Lehigh Line

The completed list of Lehigh Valley Railroad and Central Railroad of New Jersey named passenger trains that operated on the Lehigh Line:

Locations of all known passenger and freight stations in Allentown that where involved with the Lehigh Line

Lehigh Valley Railroad stations (former right of way in Allentown)

The abandoned Lehigh Valley Railroad station in Allentown in 1971, just before it was torn down
Original LVRR passenger station
40°36′16″N 075°27′24″W / 40.60444°N 75.45667°W / 40.60444; -75.45667 (LVRR Freight Station 1855)
Original LVRR freight station
The LVRR initially located its facilities on the south side of Union Street in 1855. After the large 1890 station opened, the old Union Street station was used as a freight station for several years. It was closed by the end of World War I.[48]
LVRR freight Station [48]
There was a small LVRR passenger station on the south side of West Gordon Street between North Jordan Street and the bridge over Jordan Creek. It was closed by the end of World War I.[48]

Central Railroad of New Jersey stations (current right of way in Allentown)

Original CRRNJ passenger station in East Allentown.
40°36′23″N 075°27′10″W / 40.60639°N 75.45278°W / 40.60639; -75.45278 (CNJ Freight Station 1880)
Original CRRNJ freight station in East Allentown.
The CRRNJ initially located its facilities at the corner of Lehigh (now East Hamilton) and Front Street (now Albert Street) in East Allentown about 1880. The freight station was still in operation as of 1911, but were closed before World War I.[48]
The CRRNJ and Reading Railroads operated a freight station on the SE corner of Race and Linden Streets.[48]
The CRRNJ operated a small passenger station on the south side of West Gordon Street on the east side of the tracks (what is now American Parkway). It was closed before World War I.[48]

Name

The Lehigh Line is the official name of the Norfolk Southern Railway rail line that runs from Manville, New Jersey to near Old Penn Haven, Pennsylvania.

The Lehigh Line was once known as Lehigh Valley Mainline and it was sometimes pronounced as either Lehigh Valley Main Line, Lehigh Valley mainline or Lehigh Valley main line.

The Lehigh Line shares the name with the Conrail Shared Assets Operations's Lehigh Line which was originally part of the Lehigh Line. The Lehigh Line is also known as NS Lehigh Line or Norfolk Southern Lehigh Line to distinguish itself from the Conrail Shared Assets Operations's Lehigh Line. In turn, the Conrail Shared Assets Operations's Lehigh Line is referred to as Conrail Lehigh Line or CSAO Lehigh Line to distinguish itself from the Lehigh Line.

The Lehigh Line is referred to as the original line and the Conrail Shared Assets Operations's Lehigh Line is referred to as a new rail line.

The Lehigh Line has been mistakenly referred to as Lehigh Valley Line in press releases.

Gallery

See also

Lehigh Valley Railroad

History of rail transport in the United States

References

  1. "Multimodalways - Norfolk Southern Track Charts".
  2. 1 2 http://www.parailfan.com/NS/ns_lehigh_line_ett.pdf
  3. 1 2 http://himedo.net/TheHopkinThomasProject/TimeLine/IndustrialRevAmerica/Railroads/LVRRGerard.htm The Lehigh Valley Railroad opens
  4. Henry, Mathew Schropp (1860). History of the Lehigh Valley. pp. 395–400.
  5. Annual Report of the Lehigh Valley Railroad. 1867.
  6. 1 2 Annual Report of the Lehigh Valley Railroad. 1870.
  7. Annual Report of the Lehigh Valley Railroad. January 21, 1873.
  8. http://njrails.tripod.com/20th_Century/LehighValley/LehighValley.htm
  9. The Musconetcong Tunnel, A Treatise on Explosive Compounds, Machine Rock Drills and Blasting, Henry Sturgis Drinker, J. Wiley & sons, 1883, p. 303 Google books
  10. http://bridgehunter.com/nj/hunterdon/ns---musconetcong-tunnel/
  11. https://books.google.nl/books?id=LkXXZfRFRM0C&pg=PA55&lpg=PA55&dq=coal+docks+perth+amboy&source=bl&ots=PKWypMuUQ2&sig=AAY5h7p5QpvCb6Z-NKL3pMTml2I&hl=nl&sa=X&ei=OsJNVbD0HqWc7gb824GwBg&ved=0CCAQ6AEwADgK#v=onepage&q=coal%20docks%20perth%20amboy&f=false
  12. Annual Report of the Lehigh Valley Railroad. 1875.
  13. Deas, Wayne L. "PERTH AMBOY'S REBIRTH TIED TO PROJECT", The New York Times, August 16, 1987. May 4, 2015. "The first, already begun along the right of way of the Conrail and Lehigh Valley Railroads from Route 440, will consist of 168 condominium units. It will serve as a scenic entrance to Harbortown."
  14. Annual Report of the Lehigh Valley Railroad. 1876.
  15. Annual Report of the Lehigh Valley Railroad. 1882.
  16. People ex re. Lehigh & N. Y. R. Co. v. Sohmer, State Comptroller. The New York Supplement, Vol. 154 (New York State Reporter, Vol. 188). Sep 15, 1915. p. 1054.
  17. Annual Report of the Lehigh Valley Railroad. 1889.
  18. "Into New Coal Fields". New York Times. Oct 5, 1890.
  19. Annual Report of the Lehigh Valley Railroad. 1887.
  20. 1 2 Testimony taken before the Special Senate Committee Relative to the Coal Monopoly. Documents of the Senate of the State of New York, 1893, Volume 1. 1893. pp. 529, 572.
  21. Jones 1914, p.52
  22. "Lehigh Revamping Authorized by ICC". New York Times. Feb 9, 1949.
  23. "Lehigh Valley Railroad to Retires $2,489,000 in 66-Year-Old Bonds". New York Times. Oct 20, 1954.
  24. "Rival Roads Agree on Wabash Issue". New York Times. June 13, 1941.
  25. "Dividend Omitted by Lehigh Valley". New York Times. Oct 24, 1957.
  26. "Lehigh Line Asks Reorganization". New York Times. Jul 25, 1970.
  27. Black Diamonds to Tidewater: CNJ Lehighton to WK Interlocking
  28. Stover, John F. (1997). American Railroads (2nd ed.). Chicago: University of Chicago Press. ISBN 978-0-226-77658-3.
  29. http://thetimes-tribune.com/news/central-railroad-of-new-jersey-station-a-beacon-of-scranton-s-better-days-1.693437
  30. "Luzerne County almanac, 1946". 1946. Retrieved 12 September 2013.
  31. "Conrail Chugs Off Into the Sunset; CSX and Norfolk Southern Take Over". The New York Times. 1 June 1999.
  32. EuDaly et al. 2009, p. 72
  33. http://www.nj.com/hunterdon/index.ssf/2016/02/train_blocks_kiceniuk_road_in_clinton_township.html#incart_river_mobile_index Train blocks crossing in Clinton Township, New Jersey
  34. 1 2 3 4 5 Hellerich, Mahlon H, and Pennsylvania) Lehigh County Historical Society Allentown. Allentown, 1762-1987 : a 225-year history. Allentown, Pennsylvania: Lehigh County Historical Society, 1987
  35. Central Railroad of New Jersey's timetable: http://timetables.m72express.com/scans/CNJ-LehighSusq1930TT.gif The Lehigh Valley Railroad's Black Diamond timetable, http://njrails.tripod.com/20th_Century/LehighValley/Black_Diamond/lv_bdtt.jpg
  36. "Norfolk Southern Corporate Profile". Retrieved June 22, 2007.
  37. "R.J. Corman Railroad Group Allentown Lines". Archived from the original on August 3, 2007. Retrieved June 22, 2007.
  38. Allentown Pennsylvania Bicentennial, Lehigh Country Sesquicentennial, Lehigh Country Historical Society, 1962.
  39. 1 2 The Union Street Train Tower
  40. Guidebook of the Lehigh Valley Railroad
  41. 1 2 History of the Central Railroad of New Jersey
  42. 1 2 3 4 All Aboard to Allentown – The Lehigh Valley’s Abandoned Railroad Stations
  43. Pawson, John R. (1979). Delaware Valley Rails: The Railroads and Rail Transit Lines of the Philadelphia Area. Willow Grove, Pennsylvania: John R. Pawson. pp. 54–59. ISBN 0-9602080-0-3.
  44. http://njrails.tripod.com/20th_Century/LehighValley/Black_Diamond/lv_bdtt.jpg
  45. The Black Diamond. American-rails.com. Retrieved on July 23, 2013.
  46. "County eyes N.J. rail extension to area," The Morning Call, November 7, 2008.
  47. 1 2 Central New Jersey Raritan Valley Transit Study Pennsylvania Component
  48. 1 2 3 4 5 6 Lehigh Country Railroad Station Database

External links

This article is issued from Wikipedia - version of the Thursday, May 05, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.