Leipzig Hbf–Leipzig-Connewitz railway

Leipzig Hbf–Leipzig-Connewitz
Overview
Locale Saxony, Germany
Line number 6361
Technical
Line length 9.36 km (5.82 mi)
No. of tracks 2: Leipzig Hbf–Leipzig-Connewitz
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Minimum radius 380 m (1,247 ft)
Electrification 15 kV/16.7 Hz AC overhead catenary
Maximum incline 1.06%
Route number 501.2, 527
Route map

Legend
 Operating points and lines[1] 
-0.155 Leipzig Hbf 122 m
to Gera, Großkorbetha, Halle and Bitterfeld
to Geithain and Dresden
2.080 Leipzig Ost 125 m
2.700 Torgauer Str junction
to Püchauer Str junction
Leipzig–Dresden, Leipzig–Geithain
3.600 Leipzig-Sellerhausen 125 m
4.700 Leipzig Anger-Crottendorf125 m
to Eilenburg station
Leipzig Eilenburg station–Eilenburg
Leipzig-Stötteritz–Leipzig-Schönefeld (freight ring)
from Leipzig-Schönefeld and from Engelsdorf
5.990 Leipzig-Stötteritz 130 m
7.000 Leipzig Völkerschlachtdenkmal 130 m
7.750 Tabakmühle junction
connecting curve to Leipzig Bavarian station
8.300 Leipzig-Marienbrunn 125 m
from Leipzig Bavarian station
8.640 Leipzig-Connewitz 118 m
to Hof

The Leipzig Hauptbahnhof–Leipzig-Connewitz railway is a double track electrified main line in the German state of Saxony. It used to be a short link line from Leipzig Hauptbahnhof (Central Station) to Connewitz station, where it connects with the main line from Leipzig to Hof. The line has been closed for good between Leipzig Hbf and Leipzig-Stötteritz in November 2012.

History

As a successful private company the Leipzig–Dresden Railway Company (German: Leipzig-Dresdner Eisenbahn-Compagnie) was mainly interested in developing its network rather than linking with other railways. After its nationalisation on 1 July 1876, connection of its lines with the existing national railway network became a priority. As a result, the link from Leipzig Hauptbahnhof to the Royal Saxon State Railways line at Connewitz was opened on 20 August 1878.

In the early 1960s the line was one of the first lines electrified in East Germany as part of the Saxon triangle project. On 15 January 1962 the first electric trains ran on the line.

With the establishment of the Leipzig-Halle S-Bahn in 1968-1970, new stations were opened at Sellerhausen, Anger-Crottendorf and Messegelände (now: Völkerschlachtdenkmal). In addition, Marienbrunn was reopened.

With the opening of the Leipzig City Tunnel in December 2013, the line was closed between Leipzig Hbf and Stötteritz. The main reason for this is the avoidance of the costs of the otherwise necessary reconstruction of dilapidated bridges in Stötteritz and Sellerhausen. Due to necessary construction works before opening the tunnel and to connect it to the existing railway network the line has already been closed for good between Leipzig Hbf and Leipzig-Stötteritz on November 24, 2012. Since then the line was also out of service between Leipzig-Stötteritz and Leipzig-Connewitz, but was reopened in this part together with the City Tunnel in December 2013. All passenger traffic on the line between Gaschwitz, Leipzig-Connewitz and Leipzig Hauptbahnhof travels via the City Tunnel. Therefore, the former station at Leipzig-Marienbrunn was not reopened, the section between Tabakmühle junction and Leipzig-Connewitz remains for freight traffic only.

Notes

  1. Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.

References

External links

This article is issued from Wikipedia - version of the Thursday, September 24, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.