Line 3, Harbin Metro

Line 3, Harbin Metro
Line 10
三号线
Overview
Type Rapid transit
System Harbin Metro
Status Operational
Locale Harbin, Heilongjiang, China
Stations Total: 37.6 km (23.36 mi)
Phase I: 5.25 km (3.26 mi)
Phase II: 32.35 km (20.10 mi)
Services 1
Operation
Opened Phase I: 2015
Phase II: 2017
Owner Harbin Government
Operator(s) Harbin Metro Group Corporation
Character Underground
Technical
Line length Total: 32
Phase I: 5
Phase II: 27
No. of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 3 of the Harbin Metro (Chinese: 哈尔滨地铁三号线; pinyin: Hāěrbīn Dìtiě Sān Hào Xiàn) a rapid transit line running in circle around central Harbin. Currently under environmental evaluation since 2 March 2012 and stated for construction in 2014. Phase I will be operational by 2015. Line 3 will be 37.6km km long with 32 stations.[1]

Stations

Phase I

Station Name
English
Station Name
Hanzi
Transfer
Location
Qichechilunchang 汽车齿轮厂 Daoli
Haxikezhan 哈西客站 Nangang
Xuefusidaojie 学府四道街
Haxidajie 哈西大街
Yidaeryuan 医大二院

References

  1. "哈尔滨市地铁3号线通过环评". 黑龙江省人民政府主办. Retrieved 3 May 2014.
This article is issued from Wikipedia - version of the Monday, March 28, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.