Line 3, Suzhou Rail Transit
| Line 3, Suzhou Rail Transit | |||
|---|---|---|---|
| |||
| Overview | |||
| Type | Rapid transit | ||
| System | Suzhou Rail Transit | ||
| Status | Under construction | ||
| Stations | 31 | ||
| Operation | |||
| Owner | Suzhou Rail Transit Co., Ltd | ||
| Operator(s) | Suzhou Rail Transit Co., Ltd | ||
| Technical | |||
| Line length | 43.5km | ||
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
Line 3 is a planned east-west line of Suzhou Rail Transit. Construction is expected to begin in 2013, and the line will be 43.5 kilometers long.[1] The line will link the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.
Stations
The line will include a total of 31 stations.
| Overview of Line 3 (main line) stations | |||
|---|---|---|---|
| Chinese Station name | Station name in Pinyin | Possible English translation (not official) | Transfer |
| 苏州新区站 | Suzhouxinquzhan | Suzhou New District Railway Station | |
| 麻田里 | Matianli | Matianli | |
| 新亭路 | Xintinglu | Xinting Road | |
| 鹿山路 | Lushanlu | Lushan Road | |
| 马云路 | Mayunlu | Mayun Road | |
| 华山路 | Huashanlu | Huashan Road | |
| 何山路 | Heshanlu | Heshan Road | |
| 苏州乐园 | Suzhouleyuen | Suzhou Amusement Land | Line 1 |
| 狮山路 | Shishanlu | Shishan Road | |
| 玉山路 | Yushanlu | Yushan Road | |
| 横山路 | Hengshanlu | Hengshan Road | |
| 横塘镇 | Hengtangzhen | Hengtang Community | |
| 教育园 | Jiaoyuyuan | Jiaoyu Park | |
| 沧浪新城 | Canglangxincheng | Canglang New Town | |
| 盘蠡路 | Panlilu | Panli Road | Line 2 |
| 宝帯东路 | Baodaidonglu | East Baodai Road | Line 4 |
| 迎春路 | Yingchunlu | Yingchun Road | |
| 吴中东路 | Wuzhongdonglu | Wuzhong East Road | |
| 迎春路 | Yingchunlu | Yingchun Road | |
| 群星一路 | Qunxingyilu | Qunxingyi Road | |
| 东兴路 | Dongxinglu | Dongxing Road | |
| 娄葑镇 | Loufengzhen | Loufengzhen | |
| 星港街南 | Xinggangjienan | South Xinggang Street | |
| 徐家湾 | Xujiawan | Xujia Bay | |
| 石莲街 | Shilianjie | Shilian Street | |
| 斜塘镇 | Xietangzhen | Xietangzhen | |
| 车斜路 | Chexielu | Chexie Road | |
| 敦煌路 | Dunhuanglu | Dunhuang Road | |
| 苏胜路 | Sushenglu | Susheng Road | |
| 星塘街 | Xingtangjie | Xingtang Street | Line 1 |
| 沈浒路 | Shenhulu | Shenhu Road | |
| 榭雨街 | Xieyujie | Xieyu Street | |
| 唯亭 | Weiting | Weiting | |
References
- ↑ 苏州日报 (2011-09-23). "轨道交通3号线力争在2013年底开建 (Line 3, Suzhou Rail Transit will start construction in the end of 2013)". 新浪网 (in Chinese). Retrieved 2012-06-13.
This article is issued from Wikipedia - version of the Wednesday, March 16, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.