Line 7, Suzhou Rail Transit
| ||
|---|---|---|
| Overview | ||
| Type | Rapid transit | |
| System | Suzhou Rail Transit | |
| Status | Under construction | |
| Stations | 7 | |
| Operation | ||
| Owner | Suzhou Rail Transit Co., Ltd | |
| Operator(s) | Suzhou Rail Transit Co., Ltd | |
| Technical | ||
| Line length | 11.1km | |
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | |
Line 7 is a planned lateral line of Line 4 of Suzhou Rail Transit. Construction is expected to start in 2012; the line will be 11.1 kilometers long. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.[1] According to those plans the part of Line 4 between Shihulu and Wangshanlu stations will be operated as Line 7.[2]
References
- ↑ 顾蕾 (2012-02-10). 苏州轨交4号线及支线今年6月动工. 苏州日报 (in Chinese). Retrieved 2012-06-19.
- ↑ (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010))
This article is issued from Wikipedia - version of the Saturday, June 06, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.