List of Istanbul Metro stations

Istanbul network with lines and extensions under construction through 2019, and including proposed lines and extensions.

The Istanbul Metro has 70 stations in operation on five metro lines. 54 are on the European side while 16 are on the Asian side. The first stations to open were Aksaray, Emniyet—Fatih, Topkapı—Ulubatlı, Bayrampaşa—Maltepe, Sağmalcılar and Kocatepe all which opened on 3 September 1989 on the M1. The system currently has 31 stations under construction and many more planned.

Operational stations

Şişli station of the Istanbul Metro in front of Istanbul Cevahir, Europe's largest mall between 2005 and 2011.
Levent station of the Istanbul Metro
Gayrettepe subway station
Levent subway station
Taksim subway station
Osmanbey subway station
Kadıköy subway station
Bostancı subway station, the only station with 3 tracks in the M4.
Station Line(s) District Opened Connections
Acıbadem Kadıköy 17 August 2012
Aksaray Fatih 3 September 1989
Atatürk Havalimanı Bakırköy 20 December 2002
Atatürk Oto Sanayi Şişli 30 January 2009
Atatköy—Şirinevler Bakırköy 25 August 1995
Ayrılık Çeşmesi Kadıköy 29 October 2013
Bağcılar—Meydan Bağcılar 14 June 2013
Bahçelievler Bakırköy 15 January 1999
Bakırköy—İncirli Bakırköy 7 March 1994
Bostancı Kadıköy 17 August 2012
Başak Konutları Başakşehir 14 June 2013
Bayrampaşa—Maltepe Bayrampaşa 3 September 1989
Boğaziçi Üniversitesi Beşiktaş 19 April 2015
Darüşşafaka Sarıyer 2 September 2010
Davutpaşa—YTÜ Güngören 31 January 1994
DTM—İstanbul Fuar Merkezi Bakırköy 20 December 2002
Emniyet—Fatih Fatih 3 September 1989
Esenkent Maltepe 17 August 2012
Esenler Esenler 18 December 1989
Etiler Beşiktaş 18 April 2015
Gayrettepe Şişli 16 September 2000 Metrobus
Göztepe Kadıköy 17 August 2012
Gülsuyu Maltepe 17 August 2012
Hacıosman Sarıyer 23 May 2011
Haliç Fatih/Beyoğlu 15 February 2014
Hastane—Adliye Maltepe 17 August 2012
Huzurevi Maltepe 17 August 2012
İkitelli Sanayi Başakşehir 14 June 2013
İstoç Başakşehir 14 June 2013
İTÜ—Ayazağa Şişli 30 January 2009
Kadıköy Kadıköy 17 August 2012 ,
Kartal Maltepe 17 August 2012
Kocatepe Bayrampaşa 3 September 1989
Kirazlı Bağcılar 14 June 2013
Kozayatağı Kadıköy 17 August 2012
Küçükyalı Maltepe 17 August 2012
Levent Şişli 16 September 2000
4. Levent Şişli 16 September 2000
Mahmutbey Bağcılar 14 June 2013
Maltepe Maltepe 17 August 2012
Menderes Esenler 14 June 2013
Merter Güngören 31 January 1994 Metrobus
MetroKent Başakşehir 14 June 2013
Nispetiye Beşiktaş 19 April 2015
Olimpiyat Başakşehir 14 June 2013
Osmanbey Şişli 16 September 2000
Otogar Bayrampaşa 31 January 1994
Sağmalcılar Bayrampaşa 3 September 1989
Sanayi Mahallesi Şişli 30 January 2009
Seyrantepe Şişli 11 November 2010
Soğanlık Maltepe 17 August 2012
Şişhane Beyoğlu 30 January 2009 ,
Şişli—Mecidiyeköy Şişli 16 September 2000
Taksim Beyoğlu 16 September 2000 ,
Terazidere Güngören 31 January 1994
Topkapı—Ulubatlı Fatih 3 September 1989
Turgut Özal Başakşehir 14 June 2013
Üçyüzlü Bağcılar 14 June 2013
Ünalan Kadıköy 17 August 2012 Metrobus
Vezneciler Fatih 16 March 2014
Yenibosna Bakırköy 25 August 1995
Yenikapı Fatih 15 February 2014 (M2)
9 November 2014 (M1)
,
Zeytinburnu Bakırköy 31 January 1994 , Metrobus
Ziya Gökalp Mahallesi Başakşehir 14 June 2013

By district

District Number of Stations Stations Line(s) First Station
Şişli 8 Atatürk Oto Sanayi, Gayrettepe, İTÜ—Ayazağa, 4. Levent, Osmanbey, Sanayi, Seyrantepe, Şişli—Mecidiyeköy, 16 September 2000
Maltepe 8 Esenkent, Gülsuyu, Hastane Adliye, Huzurevi, Kartal, Küçükyalı, Maltepe, Soğanlık 17 August 2012
Bakırköy 7 Atatürk Havalimanı, Ataköy—Şirinevler, Bahçelievler, Bakırköy, DTM—İstanbul Fuar Merkezi, Yenibosna, Zeytinburnu 31 January 1994
Kadıköy 7 Acıbadem, Ayrılık Çeşmesi, Bostancı, Göztepe, Kadıköy, Kozyatağı, Ünalan 17 August 2012
Başakşehir 7 Başak Konutları, İkitelli Sanayi, İSTOÇ, MetroKent, Olimpiyat, Turgut Özal, Ziya Gökalp Mahallesi, 14 June 2013
Fatih 6 Aksaray, Emniyet—Fatih, Haliç, Topkapı—Ulubatlı, Vezneciler, Yenikapı , , 3 September 1989
Bakırköy 7 Atatürk Havalimanı, Ataköy—Şirinevler, Bahçelievler, Bakırköy, DTM—İstanbul Fuar Merkezi, Yenibosna, Zeytinburnu 31 January 1994
Bayrampaşa 4 Bayrampaşa—Maltepe, Kocatepe, Otogar, Sağmalcılar , 3 September 1989
Beşiktaş 4 Levent, Nispetiye, Etiler, Boğaziçi University , 16 September 2000
Bağcılar 4 Bağcılar—Meydan, Kirazlı, Mahmutbey, Üçyüzlü , 14 June 2013
Güngören 3 Davutpaşa—YTÜ, Merter, Terazidere 31 January 1994
Beyoğlu 3 Haliç, Şişhane, Taksim 16 September 2000
Esenler 2 Esenler, Menderes 18 December 1989
Sarıyer 2 Darüşşafaka, Hacıosman 2 September 2010

Under construction stations

There are 31 stations under construction. These stations will serve the M5 and M7 (Şişli-Mahmutbey) lines. It is expected that up to 15 of these stations will open in 2015.

Station Line(s) District Planned Opening Connections
Akşemsettin Gaziosmanpaşa 2017
Alibeyköy Eyüp 2017
Altunzade Üsküdar 2015
Altınşehir Ümraniye 2015
Bağlarbaşı Üsküdar 2015
Çakmak Ümraniye 2015
Çağlayan Şişli 2017 Metrobus
Çekmeköy Sancaktepe 2015
Çarşı Ümraniye 2015
Dudullu Ümraniye 2015
Fıstıkağacı Üsküdar 2015
Göztepe Bağcılar 2017
İnkilap Mahallesi Ümraniye 2015
Ihlamurkuyu Ümraniye 2015
Kağıthane Kağıthane 2017
Karadeniz Gaziosmanpaşa 2017 T4
Kaynarca Pendik 2015
Kazım Karabekir Gaziosmanpaşa 2017
Kısıklı Üsküdar 2015
Libadiye Üsküdar 2015
Lise Ümraniye 2015
Nurtepe Kağıthane 2017
Pendik Pendik 2015
Tekstilkent Esenler 2017
Toplu Konut Sancaktepe 2015
Ümraniye Ümraniye 2015
Üsküdar Üsküdar 2015 Marmaray
Veysel Karani Gaziosmanpaşa 2017
Yakacık Kartal 2015
Yenimahalle Gaziosmanpaşa 2017
Yeşilpınar Eyüp 2017
Yüzyıl Mahallesi Bağcılar 2017

External links