MV Cragside
The MV Cragside is a Special Warfare Support vessel being prepared for the United States Military Sealift Command.[1]
The vessel has been proposed to serve as a special operations base for up to 200 troops.
History
Cragside was launched by Odense Steel Shipyard in 2010, and completed in 2011 for Maersk Line.[2]
In November 2013, Maersk was awarded a $73 million contract to convert the ship.[3]
Draft | 18.4 ft (5.6 m) |
Length | 633 ft (193 m) |
Beam | 85.3 ft (26.0 m) |
Displacement | 20,650 long tons (20,980 t) |
Complement |
|
Speed | 14.2 kn (26.3 km/h) |
References
- ↑ Burgess, Richard R. (November 18, 2013). "MSC to Charter Maersk Ship for ‘Maritime Support’". Seapower. Arlington, VA. Archived from the original on 2014-02-23. Retrieved 2014-02-16.
- ↑ "DNV Exchange - CRAGSIDE - Summary". dnv.com. DET NORSKE VERITAS. Archived from the original on 2014-02-22. Retrieved 16 February 2014.
- ↑ Bender, Jeremy (4 February 2014). "The Navy Is Converting A Cargo Vessel Into A Special Operations Mothership". businessinsider.com. Business Insider, Inc. Archived from the original on 2014-07-20. Retrieved 16 February 2014.
- ↑ "MV Cragside". Marine Traffic. Archived from the original on 2014-03-25. Retrieved 2014-07-20.
This article is issued from Wikipedia - version of the Friday, November 06, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.