Macadam

For the Scottish family name, see McAdam (disambiguation). For the regions of imperceptible colour differences, see MacAdam ellipse.
Macadam country road

Macadam is a type of road construction pioneered by Scottish engineer John Loudon McAdam around 1820. The method simplified what had been considered state of the art at that point. Single-sized aggregate layers of small angular stones are placed in shallow lifts and compacted thoroughly. A binding layer of stone dust, crushed stone from the original material may form; it may also, after rolling, be covered with a binder of fines and small crushed rock.

Predecessors

Pierre-Marie-Jérôme Trésaguet

Pierre-Marie-Jérôme Trésaguet is sometimes considered the first person to bring post-Roman science to road building. A Frenchman from an engineering family, he worked paving roads in Paris from 1757 to 1764. As chief engineer of road construction of Limoges, he had opportunity to develop a better and cheaper method of road construction. In 1775, Tresaguet became engineer-general and presented his answer for road improvement in France, which soon became standard practice there.[1]

Trésaguet had recommended a roadway consisting of three layers of stones laid on a crowned subgrade with side ditches for drainage. The first two layers consisted of angular hand-broken aggregate, maximum size 3 inches (7.6 cm), to a depth of about 8 inches (20 cm). The third layer was about 2 inches (5 cm) thick with a maximum aggregate size of 1 inch (2.5 cm).[2] This top level surface permitted a smoother shape and protected the larger stones in the road structure from iron wheels and horse hooves. To keep the running surface level with the countryside, this road was put in a trench, which created drainage problems. These problems were addressed by changes that included digging deep side ditches, making the surface as solid as possible, and constructing the road with a difference in elevation (height) between the two edges, that difference being referred to interchangeably as the road's camber or cross slope.[2]

Thomas Telford

Laying Telford in Aspinwall, Pennsylvania, 1908

Thomas Telford, born in Dumfriesshire Scotland,[3] was a surveyor and engineer who applied Tresaguet's road building theories. In 1801 Telford worked for the British Commission of Highlands Roads and Bridges. He became director of the Holyhead Road Commission between 1815 and 1830. Telford extended Tresaguet's theories, but emphasized high-quality stone. He recognized that some of the road problems of the French could be avoided by using cubical stone blocks.[4]

Telford used 30 cm × 25 cm × 15 cm (11.8 in × 9.8 in × 5.9 in) partially shaped paving stones (pitchers), with a slight flat face on the bottom surface. He turned the other faces more vertically than Tresaguet's method. The longest edge was arranged crossways to the traffic direction, and the joints were broken in the method of conventional brickwork, but with the smallest faces of the pitcher forming the upper and lower surfaces.[4]

Broken stone was wedged into the spaces between the tapered perpendicular faces to provide the layer with good lateral control. Telford kept the natural formation level and used masons to camber the upper surface of the blocks. He placed a 6-inch (15 cm) layer of stone no bigger than 6 cm (2.4 in) on top of the rock foundation. To finish the road surface he covered the stones with a mixture of gravel and broken stone. This structure came to be known as "Telford pitching." Telford's road depended on a resistant structure to prevent water from collecting and corroding the strength of the pavement. Telford raised the pavement structure above ground level whenever possible. Where the structure could not be raised, Telford drained the area surrounding the roadside. Previous road builders in Britain ignored drainage problems and Telford's rediscovery of these principles was a major contribution to road construction.[5]

Advent of the macadam

John Loudon McAdam (1756–1836)[6]

John McAdam

John Loudon McAdam was born in Ayr, Scotland in 1756. In 1787 he became a trustee of the Ayrshire Turnpike in the Scottish Lowlands and during the next seven years this hobby became an obsession. He moved to Bristol, England in 1802 and became a Commissioner for Paving in 1806.[7] On 15 January 1816 he was elected Surveyor-General of roads for the Turnpike Trust, and was now responsible for 149 miles of road.[7] McAdam first put his ideas about road construction into major practice, the first 'macadamised' stretch of road being Marsh Road at Ashton Gate, Bristol.[7] He also began to actively propagate his ideas in two booklets called Remarks (or Observations) on the Present System of Roadmaking, (which ran nine editions between 1816 and 1827) and A Practical Essay on the Scientific Repair and Preservation of Public Roads, published in 1819.[8]

McAdam's methods

Photograph of Macadam Road, ca 1850s, Nicolaus, California[9]

McAdam's method was simpler, yet more effective at protecting roadways: he discovered that massive foundations of rock upon rock were unnecessary, and asserted that native soil alone would support the road and traffic upon it, as long as it was covered by a road crust that would protect the soil underneath from water and wear.[10]

Unlike Telford and other road builders of the time, McAdam laid his roads as level as possible. His 30-foot-wide (9.1 m) road required only a rise of 3 inches (7.6 cm) from the edges to the centre. Cambering and elevation of the road above the water table enabled rain water to run off into ditches on either side.[11]

Size of stones was central to the McAdam's road building theory. The lower 20-centimetre (7.9 in) road thickness was restricted to stones no larger than 7.5 centimetres (3.0 in). The upper 5-centimetre (2.0 in) layer of stones was limited to 2 centimetres (0.79 in) size and stones were checked by supervisors who carried scales. A workman could check the stone size himself by seeing if the stone would fit into his mouth. The importance of the 2 cm stone size was that the stones needed to be much smaller than the 10 cm width of the iron carriage tyres that travelled on the road.[5]

McAdam believed that the "proper method" of breaking stones for utility and rapidity was accomplished by people sitting down and using small hammers, breaking the stones so that none of them was larger than six ounces in weight. He also wrote that the quality of the road would depend on how carefully the stones were spread on the surface over a sizeable space, one shovelful at a time.[12]

McAdam directed that no substance that would absorb water and affect the road by frost should be incorporated into the road. Neither was anything to be laid on the clean stone to bind the road. The action of the road traffic would cause the broken stone to combine with its own angles, merging into a level, solid surface that would withstand weather or traffic.[13]

Through his road-building experience McAdam had learned that a layer of broken angular stones would act as a solid mass and would not require the large stone layer previously used to build roads. Keeping the surface stones smaller than the tyre width made a good running surface for traffic. The small surface stones also provided low stress on the road, so long as it could be kept reasonably dry.[14]

The first macadam in North America

Construction of the first macadamized road in the United States (1823). In the foreground, workers are breaking stones "so as not to exceed 6 ounces [170 g] in weight or to pass a two-inch [5 cm] ring".[15]

The first macadam road built in the United States was constructed between Hagerstown and Boonsboro, Maryland and was named Boonsboro Turnpike Road. This was the last section of unimproved road between Baltimore on the Chesapeake Bay to Wheeling on the Ohio River. Stagecoaches traveling the Hagerstown to Boonsboro road in the winter took 5 to 7 hours to cover the 10-mile (16 km) stretch. This road was completed in 1822, using McAdam's road techniques, except that the finished road was compacted with a cast-iron roller instead of relying on road traffic for compaction.[16] The second American road built using McAdam principles was the Cumberland Road which was 73 miles (117 km) long and was completed in 1830 after five years of work.[16]

McAdam's influence

McAdam's renown is due to his effective and economical construction, which was a great improvement over the methods used by his generation. He emphasized that roads could be constructed for any kind of traffic, and he helped to alleviate the resentment travelers felt toward increasing traffic on the roads. His legacy lies in his advocacy of effective road maintenance and management. He advocated a central road authority and the trained professional official, who could be paid a salary that would keep him from corruption. This professional could give his entire time to his duties and be held responsible for his actions.[17]

Water-bound macadam

McAdam's road building technology was applied to roads by other engineers. One of these engineers was Richard Edgeworth, who filled the gaps between the surface stones with a mixture of stone dust and water, providing a smoother surface for the increased traffic using the roads.[18] This basic method of construction is sometimes known as water-bound macadam. Although this method required a great deal of manual labour, it resulted in a strong and free-draining pavement. Roads constructed in this manner were described as "macadamized."[18]

Tar-bound macadam

New Macadam Road construction at McRoberts, Kentucky: pouring tar, August 28, 1926.[19]

With the advent of motor vehicles, dust became a serious problem on macadam roads. The area of low air pressure created under fast-moving vehicles sucked dust from the road surface, creating dust clouds and a gradual unraveling of the road material.[20] This problem was approached by spraying tar on the surface to create tar-bound macadam. On March 13, 1902 in Monaco, a Swiss doctor, Ernest Guglielminetti, came upon the idea of using tar from Monaco's Gasworks for binding the dust.[21] Later a mixture of coal tar and ironworks slag, patented by Edgar Purnell Hooley as tarmac, was introduced.

A more durable road surface, modern mixed asphalt pavement, sometimes referred to in the US as blacktop, was introduced in the 1920s. This pavement method mixed the aggregates into the asphalt with the binding material before they were laid. The macadam surface method laid the stone and sand aggregates on the road and then sprayed it with the binding material.[22] While macadam roads have now been resurfaced in most developed countries, some are preserved along stretches of roads such as the United States' National Road.[16]

Because of the historical use of macadam as a road surface, roads in some parts of the United States (as parts of Pennsylvania) are often referred to as macadam, even though they might be made of asphalt or concrete. Similarly, the term "tarmac" is sometimes colloquially misapplied to asphalt roads or aircraft runways.[23]

See also

References

  1. Lay, Maxwell G (1992), Ways of the World: A History of the World's Roads and of the Vehicles That Used Them, New Brunswick, N.J.: Rutgers University Press, p. 73, ISBN 0-8135-1758-3, retrieved 18 June 2010 Paperback ISBN 0-8135-2691-4
  2. 1 2 Lay (1992), p.73
  3. Smiles, Samuel (1867). The Life of Thomas Telford, Civil Engineer. London: John Murray. p. 331. Retrieved 27 September 2011.
  4. 1 2 Lay (1992), p.74
  5. 1 2 Lay (1992), p.75
  6. British Museum, Engraving by Charles Turner
  7. 1 2 3 A. W. Skempton (2002). A Biographical Dictionary of Civil Engineers in Great Britain and Ireland: 1500-1830. p.416. Thomas Telford, 2002
  8. McAdam, John Loudon (1824), Remarks on the Present System of Road Making; With Observations, Deduced from Practice and Experience (8th ed.), London: Longman, Hurst, Rees, Orme, and Brown, Paternobter Row, retrieved 26 September 2011
  9. Photograph of Macadam Road, Nicolaus (Calif.), ca. 1850s, California Digital Library, retrieved 18 June 2010 Contributing institution: Sutter County Library
  10. Craig, David, "The Colossus of Roads", Palimpsest (Strum.co.uk), retrieved 18 June 2010
  11. McAdam (1824), p.38
  12. McAdam (1824), pp.39-40
  13. McAdam (1824), p.41
  14. Lay (1992), pp.76-77
  15. "1823 - First American Macadam Road" (Painting - Carl Rakeman) US Department of Transportation - Federal Highway Administration (Accessed 2008-10-10)
  16. 1 2 3 "John Loudon MacAdam", Significant Scots (ElectricScotland.com), retrieved 19 June 2010
  17. O'Flaherty, Coleman A (2002), Highways: the Location, Design, Construction and Maintenance of Road Pavements (4th ed.), Woburn, MA: Butterworth-Heinemann, p. 228, ISBN 0-7506-5090-7, retrieved 18 June 2010
  18. 1 2 John Loudon McAdam, bruzzone.org, retrieved 18 June 2010
  19. SI Neg. CCC-2777. Date: 8/28/1926 Consolidation Coal Company collection, National Museum of American History (Smithsonian Institution), Likely Public Domain--http://creativecommons.org/ns#" about="http://www.flickr.com/photos/publicresourceorg/493732415"> attributionURL http://www.flickr.com/photos/publicresourceorg/ http://www.flickr.com/photos/publicresourceorg/ "license ref= http://creativecommons.org/licenses/by/2.0/
  20. Claudy, C.H. "The Right Road—and Why," The Independent, New York, Volume 99, July, August, September 1919, 228. Retrieved on 2009-11-3.
  21. "History of asphalt road construction - Tar road construction". Retrieved 31 July 2013.
  22. Cavette, Chris, "Asphalt Paver", eNotes, retrieved 19 June 2010
  23. Stephen T. Muench, Joe P. Mahoney, Linda M. Pierce et al., "History", in ., WSDOT Pavement Guide, Washington State Department of Transportation, p. 2 in Module 1: Welcome and Introduction, retrieved 19 June 2010

Further reading

External links

Look up macadam in Wiktionary, the free dictionary.
Wikimedia Commons has media related to Macadam.
This article is issued from Wikipedia - version of the Wednesday, March 02, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.