Main-Sieg-Express

RE 99/RE 40: Main-Sieg-Express

FLIRT DMU of the HLB
Overview
Locale North Rhine-Westphalia, Hesse, Germany
Operation
Operator(s) Hessische Landesbahn
Technical
Line length 139 km (86 mi)
Operating speed 160 km/h (99 mph) (maximum)
Route number 445, 630 and 620
Legend
 Operating points and lines[1] 
0 Siegen
25 Haiger
32 Dillenburg
36 Herborn (Dillkr)
60 Wetzlar
0 Marburg (Lahn) IC
4 Marburg Süd
8 Niederweimar
12 Niederwalgern
15 Fronhausen (Lahn)
19 Friedelhausen
22 Lollar
27 Gießen Oswaldsgarten   
29
73
Gießen IC
(coupling/uncoupling in Gießen)
105 Friedberg (Hess) IC
139 Frankfurt (Main) Hbf ICE, IC
 Route on Saturdays and Sundays 
0 Siegen
25 Haiger
32 Dillenburg
36 Herborn (Dillkr)
60 Wetzlar
73 Gießen IC
105 Friedberg (Hess) IC
139 Frankfurt (Main) Hbf____ ICE, IC

The Main-Sieg-Express is a Regional-Express service operated by the German states of North Rhine-Westphalia (NRW) and Hesse from Siegen via Gießen to Frankfurt. It is operated by the Hessische Landesbahn (Hessian State Railway, HLB).

History

On 25 June 2008, the Rhein-Main-Verkehrsverbund (Rhine-Main Transport Association, RMV) and the Zweckverband Nahverkehr Westfalen-Lippe (Local transport association of Westphalia-Lippe, NWL) announced in a joint press statement that Hessische Landesbahn has won a Europe-wide tender and would take over the operation of the service for 13 years with effect on 12 December 2010. Until the commencement of the 2010/2011 timetable in December 2010, DB Regio Hesse had been operator of this service, which, after the elimination of long distance services between Siegen-Weidenau and Frankfurt in 2001, had originally been established as an Interregio-Express. In the early years, however, the Regional-Express service was characterised by a much longer journey time than the Interregio service due to capacity problems on the Main-Weser Railway. Travel times with a change in Gießen were up to 20 minutes faster than direct Main-Sieg-Express services. A change in the timings of Intercity service IC 26 between Frankfurt and Giessen in December 2009 allowed the Main-Sieg-Express to run with shorter travel times, almost as fast as the InterRegio timings.

Before the change of operators in 2010, the service was operated by DB Regio NRW every two hours via Giessen to Cologne.

Route

The line runs in NRW as RE 99 and in the area of the Rhine-Main Transport Association in Hesse as RE 40. The Regional-Express operates from Siegen to Giessen on the Dill line stopping in Haiger, Dillenburg, Herborn and Wetzlar. In Giessen, from Monday to Friday, it is coupled together with a set from Marburg and reverses to run on the Main-Weser Railway to Frankfurt with a stop at Friedberg.

Rolling stock

The service is operated with Stadler FLIRT electric multiple units. Five carriage sets are operated between Siegen and Frankfurt, while the Marburg–Giessen set is operated with three carriage sets. Before December 2010, the Siegen-Frankfurt line had been operated for many years with class 111 locomotives hauling five or six double deck carriages, or alternatively, with class 110 locomotives hauling six Silberling carriages.

Operations

Services run every day at least once every two hours over the whole route. Train runs hourly on the Siegen-Gießen section, but there are periods on weekends when services do not run every hour. A section of the train is detached/attached to run between Marburg and Giessen only between Monday and Friday. Since the change to the 2011/2012 timetable on 11 December 2011, the Marburg section of the train stops regularly in Friedelhausen and Niederweimar except for the late-night through train from Marburg to Siegen.

In addition, a fast connection is provided for commuters in the peaks on the Dill line to Frankfurt. A service called RE-Sprinter is operated from Monday to Friday during the peaks in each direction, which runs on the Dutenhofen–Gießen-Bergwald route, which is otherwise used only by freight trains. This eliminates the time-consuming change of direction in Gießen. A significant reduction in travel time is currently achieved only on the evening train to Siegen. The morning train to Frankfurt uses the time saved to make additional intermediate stops in Frankfurt. The RE-Sprinters are the only passenger trains on the Main-Weser Railway that are not scheduled to stop in Friedberg.

See also

Notes

  1. Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.

External links

This article is issued from Wikipedia - version of the Wednesday, April 20, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.