Manchester, Buxton, Matlock and Midland Junction Railway

This view of the Headstone Viaduct across Monsal Dale typifies the country through which the line passed

Manchester, Buxton, Matlock and Midland Junction Railway

Legend
Midland Line to Manchester
New Mills Central
Buxton Line (LNWR)
to Manchester

Dore and Chinley Railway
New Mills Newtown
Buxworth
Furness Vale
Chinley
Whaley Bridge
Chapel-en-le-Frith Central
Chapel-en-le-Frith (LNWR)
Future Ashbourne Line

Dove Holes Tunnel
Dove Holes
To Buxton

Peak Forest
Buxton (Midland)

Rusher Cutting Tunnel
Chee Tor Tunnels 1 & 2
Millers Dale
Litton Tunnel
Cressbrook Tunnel
Monsal Dale
Headstone Tunnel
Longstone
Hassop
Bakewell
Haddon Tunnel

Rowsley
Rowsley MPD
Rowsley South
Peak Rail
Darley Dale
Matlock Riverside
Matlock
Holt Tunnel
River Derwent
High Tor Tunnels (3)
Matlock Bath
Willersley Tunnel
Cromford
Cromford and High
Peak Railway

High Peak Junction
River Derwent
Whatstandwell Tunnel
Whatstandwell
for National
Tramway Museum

Midland Main Line
Ambergate
River Derwent
Belper
Milford Tunnel
Duffield
Wirksworth branch
(Ecclesbourne Valley Railway)
River Ecclesbourne

former line to Ripley
River Derwent
Derby
Midland Main Line
Crewe to Derby Line
and Cross Country Route

Sketchmap of the Manchester, Buxton, Matlock and Midland Railway and connections
Fragment of a map showing the proposed route of the line. Notice the route through the Goyt Valley. Also the north-facing junction at Ambergate
The various routes followed by the Midland into Manchester

The Manchester, Buxton, Matlock and Midland Junction Railway ran from a junction with the Midland Railway at Ambergate to Rowsley north of Matlock and thence to Buxton.

In time it would become part of the Midland Railway's main line between London and Manchester, but it was initially planned as a route from Manchester to the East of England, via the proposed Ambergate, Nottingham, Boston and Eastern Junction Railway which would meet it a little further north along the North Midland line at Ambergate. The Act for a line from just south of Stockport to Ambergate was passed in 1846.

Ambergate to Rowsley

The initial plan was for "An Act for making a Railway from the Manchester and Birmingham Railway at Cheadle in the County of Chester to or near to the Ambergate Station of the Midlands Railway in the County of Derby, to be called "The Manchester, Buxton, Matlock, and Midlands Junction Railway" [1] The Bill received Parliamentary Assent in 1846.

The line opened as far as Rowsley in 1849, but went no further, having run out of money [2] giving its promoters something of a problem.

Matlock Bath had long been a tourist town. Since the station at Ambergate had been opened, tourists had been brought in by coach and canal. Around thirty coaches had passed that way each day, with sixty or seventy thousand visitors going on to Chatsworth House.[3] The aim then was to develop the trade further.

The Midland Railway had held shares in the line since it had been first proposed in 1845, its interest being an extension onto its route to London. The Manchester and Birmingham had for some time been looking for a route of its own, and had considered a line through the Churnet Valley (later built by the North Staffordshire Railway), but had instead supported the alternative Matlock route with a substantial shareholding. However, in 1846 it had merged with other lines to become the LNWR, which clearly could not contemplate a competing London line. In 1852 the two companies agreed to lease the line jointly for 19 years, In addition, the Midland would work the line and pay a rent on it, and also take over the Cromford Canal.[3]

Rowsley to Buxton

In 1853, a junction was made to the southern end of the Cromford and High Peak Railway now LNWR-owned, at High Peak Junction, and with the latter's support, the Stockport, Disley and Whaley Bridge Railway connected Manchester to the northern end. In 1857, with the LNWR's barely concealed support, the SD&WBR then gained permission to extend to Buxton. It did so by a roundabout route along a massive escarpment to the east of the Goyt Valley, such that it could never become a through express route. Despite an LNWR petition against the Bill and opposition from the SD&WBR, the Midland Railway (Rowsley & Buxton) Act of 25 May 1860 authorised a 15 miles (24 km)[4] line from Rowsley to meet the SD&WBR at Buxton.[3] Work started in September 1860, under Frederic Campion,[4] the Midland Railway's Southern Division engineer,[5] then under Alfred Andrew Langley (from 1883 Midland's Chief Engineer).[6]

It was the first time the Midland had built in such difficult terrain, with steep hills and deep valleys, Buxton itself being some 1000 feet above sea level. The line followed the River Wye as far as Bakewell, with the complication of the cut and cover Haddon Tunnel, and reached Hassop in 1862 There then followed two viaducts - at Millers Dale and Monsal Dale - and eight tunnels, reaching Buxton in 1863[2] at almost the same time as the LNWR reached it from Whaley Bridge. In 1884 John Ruskin complained of the effect on the dales, saying, "your railway drags its close clinging damnation".[7]

All this time passengers were having to change at Ambergate, but in the same year, the Midland added a south-facing junction and moved the station to allow through travel from Derby and the south.[8] However, there was still the problem of the joint control of the line.

For many years, the town of Wirksworth had been campaigning for a branch line from Duffield. The CH&PR was interested, but had insufficient funds. The Midland was initially unenthusiastic, but then realised that the branch could be extended to Rowsley, avoiding the section to Ambergate, being unsure about what might occur when joint lease expired in 1871.[9]

However, the LNWR gave up its share of the line when the lease expired. It was, after all, remote and isolated from the company's main system. The Midland was therefore relieved of the necessity of extending from Wirksworth over a very difficult piece of terrain. The branch opened to Wirksworth in 1867 but was not carried further.

To Manchester

In the shifting alliances and rivalries between the various companies, the Manchester, Sheffield and Lincolnshire Railway also wished to keep the Midland away from the coalmines which it served and, in 1859, was planning a line from Hyde just outside Manchester to New Mills and Hayfield. The company was also being courted by the GNR that planned to run London trains through Retford. Meanwhile, the MS&LR's manager Edward Watkin had his own plans to reach London through Sheffield.

a cement train running west towards Chinley in 1964

It seemed the Midland's only chance was a circuitous route with the help of the Lancashire and Yorkshire Railway, except that it transpired that latter had an agreement with the LNWR not to handle other companies' trains. In 1861, the Midland sent their manager James Allport and some of the directors on a scouting trip around the area, and came by chance upon a party of MS&LR directors riding in a dog cart. The upshot was that Allport who had previously worked for the latter company should arrange a deal. Since it was clear that the Midland was determined to go ahead, it would be better not to have two lines running side by side.[3]

On 7 November 1861[4] it was formally agreed therefore that the Midland would join the MS&LR partner's Marple, New Mills and Hayfield Junction line at New Mills,[4] an agreement which was put into statutes, later including the Sheffield and Midland Railway Companies' Committee in the "Manchester, Sheffield and Lincolnshire Railway Act" of 6 August 1872.[10]

To do this, it built a junction at Millers Dale, which effectively left Buxton on a branch. Thus railway politics deprived what was (particularly at that time) the largest town in the Peak District of a through main-line station. The Midland's line proceeded to the east of, but parallel to, the LNWR's line until it reached a summit at Peak Forest. It then plunged under the LNWR through Dove Holes Tunnel with stations at Chapel-en-le-Frith, Buxworth and Chinley joining the MS&LR at New Mills to run into Manchester London Road, opening in 1867.

Later history

The Midland at last had its route into Manchester from London. Over the years it made some improvements. The route from Romiley through Hyde entailed a long detour, so in 1875 a new more direct line was opened through Reddish.

In 1865 the Midland had become a partner of the Cheshire Lines Committee which opened Manchester Central railway station in 1880. Therefore, the Midland transferred most of its trains there, at first reaching it through Stockport Tiviot Dale. However the route became increasingly congested and was hardly suitable as an express route, so in 1897, the Midland opened a new line from New Mills through Disley Tunnel and Heaton Mersey.[11]

summer 1961 leaflet - on the reverse the Cheap Day Return fare between the terminals was shown as 5/2 (26p).

Closure

The line from Matlock to Buxton was closed in 1968 by the Labour Minister for Transport, Barbara Castle, not as it is often thought by the Beeching reforms. Continuing support is being given by a heritage group Peak Rail who have restored the section from Matlock to Rowsley. The line from Matlock to Ambergate, plus the section of the Midland Main Line to Derby, are now referred to as the Derwent Valley Line. Meanwhile, the Wirksworth branch still exists and is currently being restored as the Ecclesbourne Valley Railway.

Current status

Although the track has been lifted between Rowsley and Buxton and is now part of the Monsal Trail, plans to re-open it are still proposed from time to time, and the Derbyshire County Council has pledged to keep the trackbed free of development.[12]

Part of the line has been re-opened by the heritage railway organisation Peak Rail who run services from Matlock to Rowsley, at a current distance of 4 miles (6.4 km) in length.

There are plans to extend to Bakewell via the site of Rowsley railway station and a Proposed Haddon halt as part of the Buxton extension project. It will involve reinstating the whole section and Bakewell railway station to their former use once planning permission has been granted, plus full restoration of the old Haddon Tunnel and both Coombs Road and Rowsley Viaducts (along the way between both Bakewell and Rowsley themselves).

A Quartet of Four tunnels '(Headstone, Cressbrook, Litton and Chee Tor) all located between Great Longstone and of course both Peak Forest & Blackwell Mill' were re-opened to walkers and cyclists in May 2011 [13]

See also

References

  1. Local and Personal Act, 9 & 10 Victoria I, c. cxcii HL/PO/PB/1/1846/9&10V1n231 1846
  2. 1 2 Kingscott, G., (2007) Lost Railways of Derbyshire, Newbury: Countryside Books
  3. 1 2 3 4 Williams, F.S., (1874) The Midland Railway: Its Rise and Progress Derby: Bemrose and Son
  4. 1 2 3 4 Railway Magazine October 1963 pp. 675-684 Peter E Baughan: Buxton Centenary
  5. Graces Guide
  6. Birmingham West Suburban Railway history
  7. John Ruskin letter to the Editor of the Manchester City News
  8. Pixton, B., (2000) North Midland: Portrait of a Famous Route, Cheltenham: Runpast Publishing
  9. Sprenger, Howard (2004) The Wirksworth Branch, London: Oakwood Press
  10. The National Archives | The Catalogue | Full Details | RAIL 471
  11. Truman, P., Hunt, D., (1989) Midland Railway Portrait Sheffield: Platform 5 Publishing
  12. Derbyshire County Council (2004) Derby to Manchester Railway Matlock to Buxton / Chinley Link Study. Main Report, Volume 1A: Version: Final.
  13. grough — Tunnel route officially opens to walkers and cyclists

External links

This article is issued from Wikipedia - version of the Sunday, April 10, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.