Mildura Solar Concentrator Power Station

Mildura Solar Concentrator Power Station

The 1.5 MW demonstration facility completed in 2013
Location of Mildura Solar Concentrator Power Station in Victoria
Country Australia
Location Mildura, Victoria
Coordinates 34°27′58″S 142°11′00″E / 34.46611°S 142.18333°E / -34.46611; 142.18333Coordinates: 34°27′58″S 142°11′00″E / 34.46611°S 142.18333°E / -34.46611; 142.18333
Construction began 2012
Solar field
Type CPV
Power generation
Nameplate capacity 1.5 MW
Planned: 100 MW
Website
solarsystems.com.au

The Mildura Solar Concentrator Power Station is a proposed 100 megawatt (MW) concentrated photovoltaic (CPV) solar PV system to be built at Carwarp, near Mildura, Victoria, Australia.[1] It was proposed by Solar Systems,[2] which was acquired by Silex Systems in 2010. A 1.5 MW demonstration plant was commissioned in April 2013. Construction of the larger facility was expected to commence in 2014 and be completed in 2017.[3][4]

The expansion plan was abandoned in August 2014 due to a number of factors. These included low wholesale electricity prices, a lack of commitment to clean energy by the Australian government and uncertainty surrounding the Renewable Energy Target (RET) in Australia.[5][6]

History

The project to build a 154 MW solar plant was announced in 2006 and expected to be completed in 2013.[7][8] It was delayed after Solar Systems went into administration as a result of the 2008 global financial crisis.[4] The demonstration plant was completed in 2013.

Technology

The "CS500" dish concentrator PV unit design has 112 curved reflecting mirrors, which track the sun throughout the day. The combination of mirror profile, mounting framework, and solar receiver will deliver concentrated solar energy to each PV module. The tracking mechanism allows electricity to be produced during the day whenever the sun is more than 5° above the horizon. Direct current electricity from the receivers is passed through a solar inverter that produces grid-quality alternating current. Transformers step up the voltage to the requirement of the local network at the point of connection. Advantages claimed for this design include:[9]

Previous projects

The commercialisation of this technology has already seen four smaller solar power stations established in central Australia, with support from the Australian Greenhouse Office.[11]

See also

References

  1. "Mildura Presentation March 2011" (PDF). Silex Systems Limited. March 2011. Retrieved 2011-07-11.
  2. (22 May 2010). Australia advances with solar power. Environment.co.za. Retrieved on 28 September 2012.
  3. Sophie Vorrath: "Australia’s largest concentrated solar power plant officially launched", 18 July 2013
  4. 1 2 Tom Arup: "Sunraysia's huge solar farm up and running", in The Age, 17 July 2013
  5. "Silex shelves major solar plant on RET uncertainty". ABC. 19 August 2014. Retrieved 21 August 2014.
  6. "Biggest solar project falls as Australia may cut renewables". Chicago Tribune. 18 August 2014. Retrieved 21 August 2014.
  7. Lawrence Bartlett: "World’s biggest solar plant for Australia" in Cosmons, 26 October 2006
  8. Chee Chee Leung: "Brumby planning to plug Victoria into the sun", in The Age, 17 June 2008
  9. Solar systems facts sheet -- The technology
  10. Solar systems -- The technology. Solar Systems. Retrieved on 28 September 2012.
  11. World-leading Australian solar technology for export under AP6. Solar Systems. Retrieved on 28 September 2012.
This article is issued from Wikipedia - version of the Thursday, March 24, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.