Nevada Central Railroad

Nevada Central Railroad
Locale Battle Mountain - Austin, Nevada
Dates of operation 18791938
Track gauge 3 ft (914 mm)
Headquarters Austin, Nevada

The Nevada Central Railroad was a 3 ft (914 mm) narrow gauge railroad completed in 1880 between Battle Mountain and Austin, Nevada. The railroad was constructed to connect Austin, the center of a rich silver mining area, with the transcontinental railroad at Battle Mountain.

However, by the time that the line was finished, the boom was almost over. Major silver production ended by 1887, although there was a slight revival later.

History

Austin was founded in 1862, as part of a silver rush reputedly triggered by a Pony Express rider, William Talcott whose horse kicked over a rock. By summer 1863, Austin and the surrounding Reese River Mining District had a population of over 10,000, and it became the county seat of Lander County. In 1871 the Manhattan Silver Mining Company had consolidated most of the claims. The company grew to have a lot of influence in the area and its secretary M..J. Farrell was the state senator for Lander County. Farrell set out to fix the lack of a railroad with a controversial project, approved only after a bitter debate in the 1874 legislature, overriding the Governor’s veto. The legislature authorized Lander County in 1875 to grant a $200,000 of its bonds as a subsidy to build a railroad, a time limit of five years was set to finish the project. The Nevada Central Railroad wasn’t even started until 4 ½ years later, Anson Phelps Stokes the grandson of the founder of the Phelps Dodge Corporation and a partner in the mining company came to town. With Stokes involved he brought in General James H. Ledlie, a former Union officer in the Civil War. The crews went to work desperately, only to bring the line within 2 miles (3.2 km) of the Austin town limits with less than a day left before the deadline. An emergency meeting of the Austin Town Board extended the town limits by two miles and the last rails were laid just minutes before the deadline. The line from Battle Mountain to Austin was 92 miles (148 km). Nevada Central was only profitable as long as the mines at Austin were operating at full capacity. By the middle 1930s most of the mines that generated traffic at Battle Mountain were shut down and boarded up and the NCRR had passed into receivership for the last time in 1938.

Remaining Equipment

Emma Nevada at the Orange Empire Railway Museum.

References

This article is issued from Wikipedia - version of the Tuesday, May 03, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.