North-South Corridor Line (Lucknow Metro)

North-South Corridor
Overview
Type Rapid transit
System Lucknow Metro
Locale Lucknow
Termini CCS International Airport
Munshi Pulia
Stations 22
Operation
Operator(s) Lucknow Metro Rail Corporation
Character Underground, Elevated
Technical
Line length 22.878 km
Track gauge Indian gauge
Electrification 25 kV 50 Hz AC through overhead catenary

Lucknow Metro Blue Line

Legend
CCS International Airport CCS International Airport  Blue Line 
Amausi
Transport Nagar
Krishna Nagar
Shringar Nagar
Alambagh
Alambagh ISBTBus interchange
Mawaiya
Durgapuri
CharbaghMainline rail interchange Bus interchange
Hussainganj
Sachivalaya
Hazratganj
KD Singh Stadium
Vishwa Vidyalaya
IT College
Maha Nagar
Badshah Nagar
Lekhraj
RS Misra Nagar
Indira Nagar
Munshi Pulia

The North-South Corridor of the Lucknow Metro is an under construction metro route of mass rapid transit system in Lucknow. It consists of 22 metro stations from CCS International Airport to Munshi Pulia with a total distance of 25.15 km. Most of the line is elevated.[1][2][3]

List of stations

Following is a list of stations on this route[4][5]

North-South Corridor Line
# Station Name Opening Connections Layout
EnglishHindi
1CCS International Airportचौधरी चरण सिंह अंतरराष्ट्रीय हवाई अड्डाUnder ConstructionNoneElevated
2AmausiअमौसीUnder ConstructionNoneElevated
3Transport Nagarट्रांसपोर्ट नगरUnder ConstructionNoneElevated
4Krishna Nagarकृष्णा नगरUnder ConstructionNoneElevated
5Shringar Nagarश्रृंगार नगरUnder ConstructionNoneElevated
6AlambaghआलमबागUnder ConstructionNoneElevated
7Alambagh ISBTआलम बाग अंतरराज्यीय बस टर्मिनलUnder ConstructionNoneElevated
8MawaiyaNAUnder ConstructionNoneElevated
9Durgapuriदुर्गापुरीUnder ConstructionNoneElevated
10Lucknow Charbagh Railway Station लखनऊ चारबाग रेलवे स्टेशनUnder Construction     East-West CorridorElevated
11HussainganjहुसैनगंजUnder ConstructionNoneUnderground
12State SecretariatसचिवालयUnder ConstructionNoneUnderground
13HazratganjहजरतगंजUnder ConstructionNoneUnderground
14KD Singh Babu Stadiumकेडी सिंह बाबू स्टेडियमUnder ConstructionNoneUnderground
15Vishwavidyalayaलखनऊ विश्वविद्यालयUnder ConstructionNoneElevated
16IT College Junctionआईटी कॉलेज जंक्शनUnder ConstructionNoneElevated
17MahanagarमहानगरUnder ConstructionNoneElevated
18Badshahnagarबादशाह नगरUnder ConstructionNoneElevated
19LekhrajलेखराजUnder ConstructionNoneElevated
20Ramsagar Mishra Nagarराम सागर मिश्रा नगरUnder ConstructionNoneElevated
21Indira Nagarइंदिरा नगरUnder ConstructionNoneElevated
22Munshi Puliaमुंशी पुलियाUnder ConstructionNoneElevated

References

  1. http://awas.up.nic.in/Lucknow%20DPR%20Oct%202013_Final.pdf
  2. http://timesofindia.indiatimes.com/City/Lucknow/Metro-construction-first-leg-from-September/articleshow/35691533.cms
  3. http://articles.timesofindia.indiatimes.com/2009-02-06/lucknow/28015488_1_project-report-civic-amenities-delhi-metro-rail-corporation
  4. http://awas.up.nic.in/Lucknow%20DPR%20Oct%202013_Final.pdf
  5. http://www.indianexpress.com/news/Lucknow-Metro-gets-a-blueprint-from-Delhi/611040
This article is issued from Wikipedia - version of the Wednesday, February 17, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.