North Haven (CDOT station)

North Haven

Site of the former Amtrak station and future Hartford Line station photographed in December 2015
Location Devine Street
North Haven, Connecticut
Coordinates 41°22′39″N 72°52′42″W / 41.3775°N 72.8783°W / 41.3775; -72.8783Coordinates: 41°22′39″N 72°52′42″W / 41.3775°N 72.8783°W / 41.3775; -72.8783
Line(s) New Haven–Springfield Line
Platforms 2 side platforms (planned)[1]
Tracks 2
Construction
Parking 202 spaces (planned)[1]
Services
  Planned  
Preceding station   ConnDOT   Following station
Hartford Line
toward Springfield
  Former  
Preceding station   Amtrak   Following station
Terminus
Connecticut Valley Service

North Haven is a planned regional rail station on the New Haven–Springfield Line near Route 40 and Route 5 in North Haven, Connecticut, to be served by the Hartford Line service. The station has been funded for design but not yet construction; it will likely not be complete for the Hartford Line's January 2018 opening.

The first North Haven station opened on Broadway in 1838 on the Hartford and New Haven Railroad. One of its replacements, built in 1867 and still standing, was served until around 1971 by the New Haven Railroad and Penn Central. Amtrak operated a station at the modern site from 1980 to 1986.

History

Previous stations

The 1867-built North Haven station building in 2015

The Hartford and New Haven Railroad (H&NH) opened from New Haven to Meriden in December 1838.[2] A room in a private home on Broadway just east of the tracks served as North Haven station from then until around 1850, when a dedicated station was built nearby. The station, also used as the post office and a general store, burned on March 31, 1865. A nearby store appears to have been used as the station for the next two years.[3]

The H&NH built a new brick station on the west side of the tracks in 1867.[3] A wooden freight house was constructed nearby later in the century.[4] The 1867 station was in use for just over a century; it was still served by several New Haven Railroad trains in the early 1960s, but was no longer a stop when Amtrak took over service on the line from Penn Central on May 1, 1971.[5][6] The station and freight house are still extant, although the four chimneys and the canopy have been removed from the station.[4]

On October 26, 1980, the state opened a new North Haven station off Devine Street near the Route 40 Connector, 0.9 miles (1.4 km) to the south of the former station.[7][3] The new station had two small wooden platforms and a 100-car parking lot. It was part of a $12 million effort to improve the line, which included buying twelve Budd SPV-2000 railcars to increase frequencies.[8] The station was served by Amtrak's Connecticut Valley Service until October 26, 1986, when it and Enfield were abandoned due to low ridership.[9][3] The station platforms were removed after closure, but the parking lot was repurposed as a park-and-ride lot for auto commuters.

Hartford Line station

The parking lot from the 1980s station, now used as a park-and-ride lot, will be reused for the new station

In 2004, the Recommended Action of the New Haven Hartford Springfield Commuter Rail Implementation Study included the construction of a new North Haven/Hamden station as part of the New Haven-Hartford-Springfield Commuter Rail Line. Such a station was estimated to cost between $6 million and $9.5 million.[10] The station is proposed to be located off Devine Street in North Haven, adjacent to the intersection of State Street (US 5) and CT-40. Direct access from I-91 will be possible via Route 40, while commuters coming from the Wilbur Cross Parkway (which is intended for traffic bypassing New Haven) will have to use surface streets from the nearest exits. A preliminary design in 2006 located the station platforms between Devine Street and Route 40. A new parking lot west of Route 5 would have been shared between station and park-and-ride uses, with the existing park-and-ride lot dedicated for station parking.[11]

Revised plans released in 2012 replaced the new western parking lot with a lot east of the tracks to prevent riders from having to cross busy Route 5 on foot. The station will consist of two 180-foot high-level platforms, each with a 100-foot shelter, connected by an elevated pedestrian bridge. A larger parking lot would be built on the east side of the tracks to supplement the existing park-and-ride lot.[1]

On January 12, 2015, the state announced that $5.75 million in funding would be made available for environmental mitigation and design at ten Hartford Line and New Haven Line stations, including North Haven as well as Enfield, West Hartford and Newington. The funding also includes a location study for a future Hamden station separate from North Haven.[12][13] In December 2015, funding for the Hartford Line was secured by the state, and the service is scheduled to begin operation in January 2018. That money completes funding of North Haven station, but construction is not yet funded.[14]

References

  1. 1 2 3 CDM Smith (24 February 2012). "Station and Layover Site Concept Plans" (PDF). New Haven-Hartford-Springfield Environmental Assessment. Connecticut Department of Transportation. Retrieved 3 April 2013.
  2. Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. p. 74. ISBN 0942147022.
  3. 1 2 3 4 Belletzkie, Bob. "Stations: NI-NO". Tyler City Station. Retrieved 7 April 2016.
  4. 1 2 Roy, John H. Jr. (2007). A Field Guide to Southern New England Railroad Depots and Freight Houses. Branch Line Press. pp. 78–79. ISBN 9780942147087.
  5. Time Table No. 16 for Employees Only. The New York, New Haven and Hartford Railroad Company. 28 April 1963. pp. 30–31.
  6. National Railroad Passenger Corporation (Amtrak) (1 May 1971). "Nationwide Schedules of Intercity Passenger Service". The Museum of Railway Timetables. p. 9.
  7. "National Train Timetables". National Passenger Rail Corporation (as Amtrak). 1 February 1981. p. 12, 55. Retrieved 3 April 2013 via The Museum of Railway Timetables. Compare to August 1980 timetable
  8. Madden, Richard L. (20 October 1982). "SENATOR BAKER APPEARS IN HARTFORD FOR WEICKER AND STATE REPUBLICANS". New York Times.
  9. "National Train Timetables". National Passenger Rail Corporation (as Amtrak). 26 October 1986. p. 9, 11. Retrieved 3 April 2013 via The Museum of Railway Timetables. Compare to April 1986 timetable
  10. Wilbur Smith Associates (November 2004). "Recommended Action" (PDF). New Haven Hartford Springfield Commuter Rail Implementation Study. Connecticut Department of Transportation. Retrieved 3 April 2013.
  11. URS. "North Haven Conceptual Site Plan" (PDF). Connecticut Department of Transportation. Archived from the original (PDF) on 2006-09-19. Retrieved 3 April 2013.
  12. "GOV. MALLOY, BOND COMMISSION APPROVE DESIGN OF RAIL STATIONS ON HARTFORD AND NEW HAVEN LINES" (Press release). State of Connecticut. 12 January 2015. Retrieved 1 March 2015.
  13. Altimari, Daniela (12 January 2015). "Bond Commission Authorizes Funds For Rail Projects". Hartford Courant. Retrieved 5 December 2015.
  14. Stacom, Dan (4 December 2015). "Springfield-To-New Haven Commuter Rail Cost Increases, Service Begins In 2018". Hartford Courant. Retrieved 5 December 2015.