Nunavik (ship)

For the region of Quebec, see Nunavik.
History
Name: Nunavik
Namesake: Nunavik
Owner: Fednav Group
Port of registry: Majuro,  Marshall Islands[1]
Ordered: 31 July 2012[1]
Builder: Japan Marine United Corporation, Tsu, Japan[1]
Yard number: 204[1]
Laid down: 19 July 2013[1]
Launched: 29 September 2013[1]
Completed: 30 January 2014[1]
In service: 2014–
Identification: IMO number: 9673850
Call sign: V7CK9
MMSI number: 538005278[2]
Status: In service
General characteristics [1]
Type: Bulk carrier
Tonnage:

22,622 GT

6,787 NT

27,997 DWT

Length: 188.8 m (619 ft)
Beam: 26.6 m (87 ft)
Draft: 10.2 m (33 ft)
Depth: 15.7 m (52 ft)
Ice class:

IACS Polar Class 4

DNV ICE-15

Installed power: MAN 7S70ME-C (22,100 kW)
Propulsion: Single shaft; ducted controllable-pitch propeller
Speed:

13 knots (24 km/h; 15 mph)

3 knots (5.6 km/h; 3.5 mph) in 1.5 m (4.9 ft) ice

Crew: 20[3]

Nunavik is an icebreaking bulk carrier owned and operated by the Canadian shipping company Fednav. She is used to transport copper and nickel from the Nunavik Nickel Project, making 7–8 round trips per year.[3]

Nunavik is a sister ship to the 2006-built Umiak I.[1]

Construction and career

In October 2012, Fednav announced that it had signed a contract with Japan Marine United Corporation for the construction of a new ice-strengthened bulk carrier at the Tsu shipyard in Tsu, Japan.[4] Previously, the company already operated two similar vessels with independent icebreaking capability: 1978-built Arctic and 2006-built Umiak I.

The keel of the new vessel was launched at the Japanese shipyard on 19 July 2013 and she was launched only two months later on 29 September.[1] Initially set for delivery in December 2013,[4] the new vessel, Nunavik, was completed on 30 January 2014.[1] She is named after Nunavik, the area compromising the northern third of the province of Quebec, Canada.

Several commenters have noted that while it took only couple of years to build Nunavik in Japan, the design and construction of the new polar icebreaker, CCGS John G. Diefenbaker, for the Canadian Coast Guard on a Canadian shipyard will eventually take more than a decade.[4][5]

In 2014, Nunavik became the first cargo ship to make an unescorted voyage through the Northwest Passage. The vessel left Deception Bay, Canada, on 19 September and passed Point Barrow, Alaska, on 30 September. After clearing the Bering Strait, the vessel headed to Bayuquan, China, with a cargo of nickel ore. According to Fednav, the voyage reduced greenhouse gas emissions by 1,300 tonnes when compared to a similar voyage through the Panama Canal.[6][7][8] The Northwest Passage route is forty percent shorter than the Panama Canal route.[9]

Design

Nunavik is 188.8 metres (619 ft) long and has a beam of 26.6 metres (87 ft). Fully laden, she draws 10.2 metres (33 ft) of water and has a deadweight tonnage of 27.997 tons. She is strengthened for navigation in ice according to the International Association of Classification Societies (IACS) Polar Class 4, which allows year-round operation in thick first-year ice which may include old ice inclusions. Furthermore, she fulfills the requirements for ice class ICE-15 by Det Norske Veritas.[1]

A handysize bulk carrier designed to carry nickel concentrate, Nunavik has five holds with a combined grain capacity of 30,221 cubic metres. She is geared with three electro-hydraulic cranes, two with a lifting capacity of 30 tons and one capable of lifting 50 tons.[10] On the return voyage, the vessel will transport equipment and fuel to the mine.[3] Nunavik is also the first Canadian-owned vessel to be fitted with a ballast water treatment system.[11]

The icebreaking bulk carrier is powered by a single seven-cylinder MAN 7S70ME-C low-speed two-stroke crosshead diesel engine which produces 22,100 kW (29,600 hp).[1] In order to reduce the environmental impact, the main engine fulfills the International Maritime Organization (IMO) Tier II requirements for nitrogen oxide emissions.[11] The main is coupled directly to a ducted controllable-pitch propeller manufactured by Rolls-Royce.[1] At full power, Nunavik is able to maintain a continuous speed of 3 knots (5.6 km/h; 3.5 mph) in 1.5-metre (5 ft) ice.[11] In open water, she only needs about one third of the power to reach a service speed of 13 knots (24 km/h; 15 mph).[10] For onboard power generation, Nunavik has three MAN 6L23/30H diesel generating sets.[1]

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 "Nunavik (32867)". DNV Exchange. Det Norske Veritas. Retrieved 2013-03-23.
  2. "Nunavik (9673850)". Equasis. French Ministry for Transport. Retrieved 2014-03-23. (registration required (help)).
  3. 1 2 3 MV Nunavik the newest icebreaker to hit Arctic waters. CBC, 24 March 2014. Retrieved 2014-03-24.
  4. 1 2 3 Canadian Firm Has World’s Largest Fleet of Ice-class Vessels – New Order Placed For Polar-Class 4 Bulk Carrier. Ottawa Citizen Blogs, 12 November 2012. Retrieved 2014-03-23.
  5. Mark Collins: Look How Fast One Can Get an Icebreaker... The 3Ds Blog, 13 November 2012. Retrieved 2014-03-23.
  6. Cargo Ship Makes 1st-Ever Solo Trip Through Northwest Passage. LiveScience, 1 October 2014. Retrieved 2014-10-12.
  7. "MV Nunavik: from Quebec to China via the Northwest Passage". Nunatsiaq Online. 2014-09-22. Retrieved 2015-12-11. The MV Nunavik, a vessel touted by its owners as one of the most powerful ice-breaking bulk carriers in the world, set out Sept. 19 on a voyage from Deception Bay, Quebec to northeastern China — through the Northwest Passage.
  8. Adolf K. Y. Ng, Austin Becker, Stephen Cahoon, Shu-Ling Chen, Paul Earl, Zaili Yang (2015). Climate Change and Adaptation Planning for Ports. Routledge Publishing. ISBN 9781317631293. Retrieved 2015-12-11.
  9. "Fednav ship attempting Northwest Passage cargo run". MM&D. 2014-09-22. Retrieved 2015-12-11. The Nunavik is the most powerful conventional (non-nuclear) icebreaking bulk carrier in the world, and sails from Deception Bay, Northern Quebec year round, transporting product from the Canadian Royalties mine.
  10. 1 2 Nunavik. Fednav. Retrieved 2014-03-23.
  11. 1 2 3 Fednav brings new icebreaker to the Canadian Arctic. CNW, 20 March 2014. Retrieved 2014-03-23.
This article is issued from Wikipedia - version of the Saturday, March 12, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.