Enel Russia
Native name | Энел Россия |
---|---|
Formerly called | Enel OGK-5 |
Public (OAO) | |
Traded as | MCX: ENRU |
Industry | Power generation |
Predecessor | RAO UES |
Founded | 2004 |
Headquarters | Yekaterinburg, Russia |
Key people | Carlo Palasciano Villamagna, General Director |
Products | power and heat |
Revenue | US$1 billion (2007) |
Parent | Enel |
Website | www.enel.ru |
Enel Russia (former names: OGK-5 and Enel OGK-5, traded as MCX: OGKE) is a power generation company operating in Russia. The company is registered in Yekaterinburg, while its central office is in Moscow. The company was founded in 2004 as a result of RAO UES reorganization.
History
The company was founded in October 2004 as OGK-5. It was registered in Yekaterinburg on 27 October 2004. In October 2006, the company ran initial public offering offering 5.1 billions of shares at value of US$459 million. In June 2007, Enel bought 29.99% of shares which previously belong to RAO UES. In October 2007, Enel increased its stake to 37.15% and later to 56.43%. On 7 July 2009, the company was renamed Enel OGK-5, and on 8 August 2014, the new name Enel Russia was registered.
Corporate issues
As of 2015, the main shareholder of Enel Russia was Enel Investment Holding B.V. (56.43%). PFR Partners Fund I Limited had 26.43% and Prosperity Capital Management Limited had 6.33%. Other shareholders had in total 10.81% of shares.[1] Enel Russia shares are listed in Level 1MICES quotation list.[2]
Chairman of the board is Stephane Zweguintzow[3] and director general is Carlo Palasciano Villamagna.[4]
Operations
Enel Russia owns and operates four power plants:
- Reftinskaya GRES (3,800 MW)
- Sredneuralskaya GRES (1,656.5 MW)
- Nevinnomysskaya GRES (1,530.2 MW)
- Konakovskaya GRES (2,520 MW)
The total installed capacity of power plant is 9,677 MW of power capacity and 2,382 Gcal/h of heat capacity.[5]
In Autumn 2008, Enel started construction of new 410 MW combined cycle gas turbines at Nevinnomysskaya and Sredneuralskaya GRES. The construction of both CCGTs was completed in 2011. The construction was done by an international consortium, led by Enel Engineering and Innovation. The project was supported by the European Bank for Reconstruction and Development through a €120 million long term loan. With the launch of the new CCGT, the installed capacity of Nevinnomysskaya GRES increased by 380 MW as an old 30 MW unit (N5) was decommissioned. The efficiency rate of the new CCGTs is about 58%, compared to 35-40% of conventional gas-fired power units.
Environmental program
Enel Russia has equipped power units 4, 5 and 7 of the coal-fired Reftinskaya power plant with fabric filters. The bag filters reduce the emission of dust particle to 98%. The second large-scale ecological project of Reftinskaya GRES was the construction of a dry ash removal system and the transition from the hydraulic method to dry removal of ash. The system was launched on 29 September 2015. It was the first time in Russia, when the traditional hydraulic treatment was replaced by the dry method of transportation and storage of ash.
For its achievements on environmental protection, Reftinskaya GRES won the EcoResponsibility Prize, instituted by the Ministry of Natural Resources and Environment of the Sverdlovsk region.
References
- ↑ Ежеквартальный отчет за 4 квартал 2014 года. ОАО «Энел Россия» (13 февраля 2015).
- ↑ Ход торгов по инструменту ENRU (ОАО «Энел Россия», акция обыкновенная). Московская Биржа.
- ↑ Совет директоров «Энел ОГК-5» возглавил директор департамента по развитию бизнеса Энел во Франции Стефан Звегинцов, BigpowerNews.ru (26 июля 2013). Проверено 30 апреля 2015.
- ↑ Карло Палашано Вилламанья вступил в должность генерального директора ОАО «Энел Россия», ОАО «Энел Россия» (13 марта 2015).
- ↑ О компании. ОАО «Энел Россия».
External links
|