Olimpijski Bazen Otoka
Location | Sarajevo, Bosnia and Herzegovina |
---|---|
Capacity | 558 |
Surface | 3,600 meters^2 |
Construction | |
Broke ground | 2005 |
Opened | 2008 |
Construction cost | 15.5 million KM |
Tenants | |
VK Bosna |
Olimpijski Bazen Otoka is an indoor water arena in Sarajevo, Bosnia and Herzegovina. It is located in the Novi Grad district. Construction was finished in 2008, making it the first olympic sized swimming pool in Sarajevo. Construction started in 2005. The main pool has a dimension of 50 times 25 meters, with a depth of 2.2 meters. There are 10 lanes. There is an additional smaller pool in this building.[1] The main pool is in regulations with FINA requirements.
The construction cost was 15.5 million convertible marks, 11.5 came from city Sarajevo, 3.5 from Canton Sarajevo, and 1 million came from the BH Government.[2]
References
- ↑ "Otvoren Olimpijski bazen Sarajevo". 2008-08-28. Retrieved 2010-02-15.
- ↑ "Olimpijski bazen Otoka - Grad Sarajevo". 2008. Retrieved 2010-02-15.
External links
This article is issued from Wikipedia - version of the Thursday, August 29, 2013. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.