PAETEC Headquarters was a building proposed and approved for construction in Rochester, New York. It was to serve as the new headquarters for the Rochester-based telecommunications company, PAETEC Holding Corp. Its original proposed height was 40 floors, with a LEED-certified rooftop garden and was originally slated for completion in 2012. The proposed PAETEC building would have sat on the southeast corner of the intersection of Main Street and Clinton Avenue, taking advantage of both the refreshed (abated) skeletal structure of the former Seneca Building and adjacency to an enormous underground parking facility (1600+spaces) and truck tunnel. In addition to reusing the Seneca structure, PAETEC revealed plans at an RDDC luncheon in June 2010 that detailed the construction of a semi-transparent NOC on the north side of the building with viewing lines for pedestrians into its command center, additional office space on the south side of the structure, as well as retail on the first floor.[1]

The new downtown headquarters for PAETEC was to be part of a redevelopment plan, with the state of New York using a $40 million state grant to clear the Midtown site.[2][3]

Midtown Plaza

It was announced on October 16, 2007 that Midtown Plaza will be knocked down to make way for the new PAETEC headquarters via eminent domain. Midtown Plaza was the first urban indoor mall in the United States.[4]

Fate

With the economic recession of 20082009, PAETEC scaled down their plans significantly, first to a much smaller new building, and then to a simple re-use of the existing Seneca Building. With PAETEC's acquisition by Windstream Communications, the new plan will involve only two-thirds of the Seneca Building; the city then began considering options for the corner parcel on which the Tower would have been built. The corner was sold to Pike Construction who will build the new headquarters for the Democrat and Chronicle on the site. The building will be three stories like the current Seneca Building which currently houses offices for PAETEC's successor Windstream.

References

  1. List of tallest buildings in Rochester, New York#Tallest under construction, approved and proposed
  2. Bud Lowell Midtown Plaza Redevelopment Moving Forward March 19, 2009 XI Public Media for Rochester
  3. Windmills on top of PAETEC Tower whec.vom
  4. Midtown to be demolished; Paetec HQ to rise on site Rochester Business Journal

This article is issued from Wikipedia - version of the Saturday, July 05, 2014. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.