Pennsylvania Canal

Pennsylvania Canal

A network of east-west canals and connecting railroads spanned Pennsylvania from Philadelphia to Pittsburgh. North-south canals connecting with this east-west canal ran between West Virginia and Lake Erie on the west, Maryland and New York in the center, and along the border with Delaware and New Jersey on the east. Many shorter canals connected cities such as York, Port Carbon, and Franklin to the larger network.

Map of historic Pennsylvania canals and connecting railroads
Specifications
Status Abandoned except for historic and recreational segments and navigable rivers
History
Original owner Commonwealth of Pennsylvania
Construction began 1826
Date completed ~1840
Date closed ~1900

Pennsylvania Canal (or sometimes Pennsylvania Canal system) refers generally to a complex system of transportation infrastructure improvements including canals, dams, locks, tow paths, aqueducts, and viaducts. The Canal and Works were constructed and assembled over several decades beginning in 1824, the year of the first enabling act and budget items.[notes 1] It should be understood the first use of any railway in North America was the year 1826,[notes 2] so the newspapers and the Pennsylvania Assembly of 1824 applied the term then to the proposed Right of ways mainly for the canals of the Main Line of Public Works to be built across the southern part of Pennsylvania. Enacted before Railroads gestated during their infancy, the focus of the act was to create through building a canal system, the capability to ship heavy or bulk goods and connect Philadelphia to Pittsburghand more importantlyand beyond to the new growth markets in the developing territories reached by the Ohio River now called the midwest.[notes 3] Later, when updated in 1837 to reflect the experience of twelve years of toddler-railways,[notes 4] the term was also applied to railroads and new canals to be added to the state transportation system.[1] As a crowning achievement, the Main Line of Public Works and the Pennsylvania Canal system topped 2,100 feet (640 m) in elevation by erecting the Allegheny Portage Railroad, which used five inclined plains on each side of the Eastern Continental Divide at Cresson Pass in Cambria County to actually haul wheeled barges up and over the Allegheny Front and connect Pittsburgh to the Susquehanna. When finished in 1834 the trip from Philadelphia to Pittsburgh could be made in 3–5 days, weather conditions depending.

Background

The near west, in the fifty years before 1830 was but recently settled and steadily growing as people poured westwards along the various Emigrant Trails into the mid-west to destinations on a million new farms and towns throughout the watershed of the Mississippi Valley towards the lands organized in the Northwest Territory. The goal of the enabling acts was to enhance commerce and lower transportation costs between east and west, better joining the Trans-Allegheny region to the eastern seaboard; this was a commercially motivated act with an eye towards servicing the growing markets of the new fast growing western settlements (midwest) to the Manufactories of the East.

Provision was made in the later legislation to tie in and even extend privately built canals such as the Lehigh Canal, not technically part of the Pennsylvania Canal system, and link them and the State's infant railroads to the public system and add to its value. The canal linking Philadelphia to the Susquehanna River, the proposed 'Pennsylvania Canal' (Philadelphia to the Susquehanna to the Wright's Ferry landing at Columbia, Pennsylvania) was over taken by technological events. Instead of pouring money into building a ditch, permission was sought by the investors to use it's 82 miles (132.0 km) right of way to replace it in the main line of works scheme by a railway, a new developing technology which resulted in the Philadelphia & Columbia Railroad (1834); which as they were built above ground, were easier and cheaper to build, since no ditches needed dug with human muscle power, nor did they require feed waters to be located and aqueducts built to provide them. The plan also included a visionary scheme to build a ramp system which would roll canal boats over the Allegheny Mountains at an elevation over 2,100 feet (640 m) through the broad uneven saddle of Cresson pass.

Though most of the canals no longer have any function, some segments retain value as historic and recreational sites. Both the Delaware and the lower Lehigh Canal were kept busy into the tough financial years of the Great Depression. The right of way authorized for the Upper Lehigh Canal became an extension of the Lehigh and Susquehanna Railroad (LH&S), which the 1837 revised act had established to connect the Wyoming Valley to the Delaware River navigations; the railway would eventually build parallel the entire Lehigh Canal operated by it's parent LHC&N. The route Philadelphia to Wilkes-Barre over the Lehigh and LH&S or eventual LH&S cut over 100 miles (160 km) off the trip, including a similar distance saving Philadelphia to Pittsburgh (via Pitston Landing's canal docks. The first three tunnels of any kind in the US were built in support of the Allegheny Portage Railway,[2] and all of them were converted to railroad tunnels.

History

October 4, 1826 letter by Harmar Denny, Representative of Pennsylvania, that discusses William Robinson, Jr.'s "disgraceful conduct" in debate over the location of the Pennsylvania Canal's terminal

The canal era began in Pennsylvania in 1797 with the Conewago Canal, which carried riverboats around Conewago Falls on the Susquehanna River near York Haven. Spurred by construction of the Erie Canal (construction between 1817 and 1825) and the perceived competitive advantage it would give New York State in moving people and materials to and from the interior of the continent, Pennsylvanians built hundreds of miles of canals during the early decades of the 19th century. These included the privately funded Lehigh Canal, technically a navigation (1818) improving water transport on the lower Lehigh River (Mauch Chunk to Easton at the confluence with the Delaware via Allentown and Bethlehem and enabling the first regular reliable supplies of anthracite coal to reach eastern manufactories and two canals built later by Pennsylvania stock companies, the Schuylkill Canal from Philadelphia to Port Carbon and the Union Canal from Reading to Middletown.[1]

By 1834, the Main Line of Public Works, a system of interlocking canals, railways, and inclined planes, was hauling passengers and freight up to 391 miles (629 km) between Philadelphia and Pittsburgh. Though not all in concurrent operation, the total length of the canals built in Pennsylvania eventually reached 1,243 miles (2,000 km).[3]

By 1840, work had been completed not only on the Main Line of Public Works but on many other lines, officially called divisions. The Main Line consisted of the Eastern Division, the Juniata Division, the Western Division, the Philadelphia and Columbia Railroad, and the Allegheny Portage Railroad. North–south divisions operated along the Delaware River in the east, the Susquehanna River in the middle of the state, and the Beaver River in the west.[1] A few additions were completed after 1840.

By about 1850 steam engine technology had advanced to having the ability to produce locomotives with sufficient power to move freight, including bulk goods such as coal and grain, so railroads had already begun displacing canals as the preferred method of long-distance transportation, as they also offered speed. In 1852, the Pennsylvania Railroad (PRR) began offering rail service from Philadelphia to Pittsburgh, and in 1857, it bought the Main Line Canal from the state. In 1859, all canals owned by the commonwealth were sold. The PRR formed the Pennsylvania Canal Company in 1867 and continued to use canals to haul freight. However, the canal business declined steadily in the last quarter of the century, and most Pennsylvania canals no longer functioned after 1900.[4]

State built

The state funded the following canals in Pennsylvania. For interstate canals, the listed mileage is for the Pennsylvania portion only.[3]

Main Line

Susquehanna

Beaver and Erie

Delaware

Privately built

Private entities funded the following canals in Pennsylvania. For interstate canals, the listed mileage is for the Pennsylvania portion only.[3]

Parks, monuments, historic places

Several canal segments or other canal infrastructure in Pennsylvania are listed on the National Register of Historic Places.[5] One complete canal, the Delaware Canal, is the main feature of Delaware Canal State Park (formerly Theodore Roosevelt State Park) between Bristol and Easton. It is continuously intact for its full length of 60 miles (97 km).[6]

Other Pennsylvania canal infrastructure on the National Register includes the following:

See also

Notes

  1. The political push to create the system was inspired by competition with New York and Baltimore, all three vying to be the premier major port city, and in particular, the continuing construction of the Erie Canal, begun in 1817. The news that construction of the Erie was expected on schedule, in 1825 added fuel to what had become a frenzy. The Erie began operations on October 26, 1825, further inspiring Pennsylvanians to over achieve in the Great Works projects. Portaging over the Alleghenies by 1834 was one result, though the Delaware Canal project was delayed to fund the western infrastructure connecting Allegheny County to the Center and Eastern state.
  2. The 'first railway' in North America was built in the year 1826, when in Quincy, Massachusetts, the animal powered 'Granite Railway' was used to move granite quarried for the Bunker Hill Monument to seaside docks. This road became a commercial shortline.
  3. City fathers in New York and Baltimore were undertaking similar actions to build their state's future commerce, resulting in the proposal and company formed to build a canal from Baltimore to the Monongahela and another across Ohiothat determination would spawn the B&O Railroad.
    In New York the financial and political scheming to get a lock on the emerging mid-west markets would begin with the Erie Canal and work up through the Delaware and Hudson Canal and not long after, New York Central Railroad.
  4. Several key early railroads were added later in 1837 after word of early British successes reached the United states, and the first group of rail lines begun in the US (1826-1828) proved their worth.

References

  1. 1 2 3 "Pennsylvania Canals". Pennsylvania Historical and Museum Commission. Archived from the original on 2007-08-18. Retrieved 2007-11-08.
  2. "Staple Bend Tunnel". National Park Service. Retrieved 2016-04-30. Work began on November 21, 1831 and often occurred during inclement conditions. The men were paid $13 per month plus room and board for 12 hour days 6 days per week. Workers chipped and blasted 901 feet of solid rock to make the tunnel. Finished in June 1833, the Staple Bend tunnel was advertised as the first railroad tunnel in the United States. It was the third tunnel of any kind built in the US, the first tunnels were for other canals in Pennsylvania. They were also converted into railway tunnels in 1854 when the Pennsylvania Railroad bought the Allegheny Portage Railway from the Commonweath of Pennsylania.
  3. 1 2 3 Shank, William H. (1986). The Amazing Pennsylvania Canals, 150th Anniversary Edition. York, Pennsylvania: American Canal and Transportation Center. ISBN 0-933788-37-1.
  4. "Pennsylvania's Transportation System: the Canals". Pennsylvania State Archives. Archived from the original on 2007-11-06. Retrieved 2007-11-08.
  5. Staff (2007-01-23). "National Register Information System". National Register of Historic Places. National Park Service.
  6. "Delaware Canal State Park". Pennsylvania Department of Conservation and Natural Resources. Retrieved 2007-11-09.

External links