Perleberg Solar Park
| Perleberg Solar Park | |
|---|---|
![]() Location of Perleberg Solar Park in Germany | |
| Country | Germany |
| Location | Perleberg |
| Coordinates | 53°04′21″N 11°49′30″E / 53.07250°N 11.82500°ECoordinates: 53°04′21″N 11°49′30″E / 53.07250°N 11.82500°E |
| Status | Operational |
| Construction began | April 2012 |
| Commission date | June 30, 2012 |
| Owner(s) | Gehrlicher Solar |
| Solar farm | |
| Type | Flat-panel PV |
| Site area | 64 ha (160 acres) |
| Power generation | |
| Units operational | 144,144 |
| Nameplate capacity | 35 MWp |
| Annual generation | 33 GWh |
The Perleberg Solar Park is a photovoltaic power station, with an installed capacity of 35 megawatts (MW). It uses 144,144 solar panels manufactured by Chinese company Yingli. The panels are mounted at a fixed angle on posts that are driven into the ground, at a former military airport.[1][2][3][4]
See also
- Photovoltaic power station
- PV system
- List of photovoltaic power stations
- Solar power in Germany
- Electricity sector in Germany
References
| ||||||||
This article is issued from Wikipedia - version of the Sunday, March 01, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.