Pingtung Line
The Pingtung Line (Chinese: 屏東線; pinyin: Píngdōng Xiàn) is a line of the Taiwan Railway Administration Western Line in Taiwan. It is 61.3 km long, of which 36.1 km is double track.[1]
History
The line was completed in 1941. It is electrified (25 kV) with two tracks from Kaohsiung to Chaozhou. Most trains start or end from Kaohsiung Station or Pingtung Station.
Stations
See also
References
|
---|
| Trunkways | | |
---|
| Western | |
---|
| Eastern | |
---|
| Southern | |
---|
| Axillary & Branch | |
---|
| Freight |
- Hualien Harbor
- Taichung Harbor
- Kaohsiung Harbor
|
---|
| Scenic | |
---|
| Defunct |
- Songshan Airport
- Hsinchu Airport
- Shueishang Airport
- Pingtung Airport
- Donggang
- Dongshi
- Shengang
- Toufen Industrial Area Branch
- Tropic of Cancer Branch
- Tobacco Factory
- Relief Agency
- Datong Yunli
- Sanzhangli Branch
- Tamsui
- Xinbeitou Branch
- Asia Branch
- Xindian
- Zhonghe
- Linkou
- Su'ao Harbor
- Keelung Harbor
|
---|
| Planned & U/C |
- Taipei–Yilan New
- Dajia–Houli
- Hengchun
- Huwei Branch
- Yongning Branch
|
---|
| Failed | |
---|
|