Port Bonython Fuels

Port Bonython Fuels is a fuel importation and diesel distribution hub currently under construction at Port Bonython on the Point Lowly peninsula in South Australia's upper Spencer Gulf region. The development was designed to supply the State's expanding oil, gas and mineral resources sectors' operations in the north and west of the state. Once complete, it will allow the State to import fuel from ships carrying cargoes in excess of 100,000 tonnes-[1] approximately four times the size of vessels currently importing diesel via Port Adelaide.[2] The project is owned by Petro Diamond Australia, a wholly owned subsidiary of Mitsubishi Corporation.[3] The first stage of the project's construction is expected to be completed in mid 2016.[4]

Petroleum importation in South Australia

Prior to the proposal to establish Port Bonython Fuels, South Australia has imported hydrocarbons at ports with significant depth constraints. The two berths receiving hydrocarbons were at Kirton Point, Port Lincoln (with a draught of 9.9 metres) and at Inner harbor, Port Adelaide (with a draught of 10.7 metres).[5] With a depth of approximately 20 metres,[6] Port Bonython will be able to receive cargoes from much larger tankers than at the state's shallower ports.

Ownership

The project is owned by Petro Diamond Australia, an Australian company based in Adelaide, South Australia. Once constructed the facility will be operated by Coogee Chemicals.[7] The existing 2.4 kilometre long jetty at Port Bonython will be used by Port Bonython Fuels to import hydrocarbons from 2016. It was constructed by Santos in 1982, and was sold to the Government of South Australia in 1983 for $48.2 million. As of 2015, the jetty remains Government infrastructure but has been used exclusively by Santos for the export of hydrocarbon products.[8]

Operations

Fuel will be imported to a land-based tank farm then distributed to tankers up to A-Triple in size. Vessels will berth at the existing wharf at Port Bonython, which is capable of accommodating vessels of 120,000 DWT. Two new loading arms were added to the jetty to support the facility's needs, along with 5.2 km of pipeline which connects the berth with the land-based facility. Three tanks are being constructed, each with a capacity of 25 million litres. The tank farm at Stage 1 will have an aggregate storage capacity of 81 million litres. Once operating, the facility will offer a 24-hour, 7-day-per-week service.[7]

History

Port Bonython Fuels was originally conceived by Stuart Petroleum and the Scott Group of Companies in August 2007, as a $45 million joint venture project.[9] It was disclosed as part of the Government of South Australia's plan to support the growth of the mining sector in 2008.[10] A Development Application was lodged with the Government of South Australia by Stuart Petroleum in May 2009.[2] The Port Bonython Fuels project received development approval in January 2010.[11] Senex Energy acquired Stuart Petroleum, then sold Port Bonython Fuels to Mitsubishi Corporation in 2012-13. The project was re-announced in 2014, and valued at $110 million.[12] Treasurer Tom Koutsantonis described the facility as providing a "competitive and reliable supply and helping underpin future economic growth."[13]

The proposal was met with opposition from the Alternative Port Working Party, which has campaigned for the relocation of industrial development projects away from the Point Lowly peninsula. Spokesperson Sid Wilson told the ABC in 2014:

"We still have the concern that they are degrading the natural environment - as much as they'll create 10 new jobs full-time they'll degrade the tourism and recreation appeal of that area. Really our concern is that they're developing the best piece of coastal marine land within 100 kilometres of Whyalla."[14]

References

  1. "Whyalla & Eyre Peninsula - Regional Plan August 2012" (PDF). Regional Development Australia. 2012-08-01. Retrieved 2015-07-13.
  2. 1 2 "STU - Port Bonython Fuels Development Application Lodged - Mr Tino Guglielmo, Managing Director". BRR. 2009-05-26. Retrieved 2015-07-12.
  3. BRUCE, KAYLEIGH. "Fuel terminal on track". Retrieved 2015-06-30.
  4. "Mitsubishi Corporation to launch diesel business in Australia | Australian Manufacturing". www.australianmanufacturing.com.au. Retrieved 2015-07-01.
  5. Petroleum import infrastructure in Australia - Main report (PDF). Melbourne, Australia: ACIL Tasman. 2009. p. 84.
  6. "Port Bonython Bulk Commodities Export Facility Overview of Draft Environmental Impact Statement" (PDF).
  7. 1 2 "http://www.gmusg.com/WSCMConfig/Presentation/Item218.pdf" (PDF). www.gmusg.com. Retrieved 2015-06-30.
  8. "Final Report - Port Bonython Jetty Refurbishment" (PDF). 2010-11-11.
  9. "http://www.fullyloaded.com.au/industry-news/1407/green-light-for-port-bonython-diesel-terminal". www.fullyloaded.com.au. Retrieved 2015-07-12.
  10. "Mining infrastructure growth". New Connections: 6. 2008-08-01.
  11. "Port Bonython Fuels". Port Bonython Fuels. Retrieved 2015-06-30.
  12. "$110m diesel facility for Port Bonython - InDaily | Adelaide News". Retrieved 2015-07-13.
  13. BILNEY, KATE. "Diesel terminal for Port Bonython". Retrieved 2015-06-30.
  14. "Environmental fears fuel Port Bonython terminal opposition". ABC News. Retrieved 2015-06-30.
This article is issued from Wikipedia - version of the Saturday, August 01, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.