Proposed transport developments in Bristol

This article lists proposed developments to transport in Bristol.

MetroBus

Main article: MetroBus (Bristol)

MetroBus is a bus rapid transit, currently under construction, which consists of three routes: Ashton Vale to Temple Meads (AVTM), North Fringe to Hengrove and the South Bristol Link (SBL). MetroBus services are expected to begin in 2017.[1]

Greater Bristol Bus Network

The greater Bristol bus network (GBBN) is a scheme by the West of England Partnership, to improve 12 bus corridors across the greater Bristol area.

Bristol Airport expansion

Main article: Bristol Airport

Bristol Airport created plans for an extension, in October 2007 the airport announced that it would delay the planning application until the middle of 2008 in order to complete research on the airport's effect on the environment. This news came just a week after the World Development Movement stated that flights from the airport generate the same amount of CO2 as the nation of Malawi.[15] Plans for the expansion of the airport have been now completed and are to be submitted to the council for approval in summer 2008. A coalition to fight the expansion, known as Stop Bristol Airport Expansion was formed by Bristol Friends of the Earth, Campaign to Protect Rural England (CPRE) and other groups and individuals in North Somerset, Bristol and Bath and North East Somerset. In early 2008, an opposition to the Stop Bristol Airport Expansion campaign was launched to support the expansion and operations of the airport. Named BISON - Bristol International Supporters Group - it is targeted at the travelling public.

A decision was due on 3 March 2010 after a meeting at Weston-super-Mare Town Hall, on 24 May permission was granted by the council. As part of the expansion, planning permission was also granted for a 251-room hotel, which was scheduled to open in 2012.[2] However in 2014, the plans were revised and reapproved instead for a 201-room hotel, which will in the future include the addition of 50-rooms.[3] Construction began on the airport hotel in 2015 with the hotel expected to be completed in 2016.[4]

MetroWest

Main article: MetroWest (Bristol)

The MetroWest scheme, previously known as The Greater Bristol Metro, is a proposal to improve the rail services in Greater Bristol. It was first proposed at First Great Western's Stakeholder Event in March 2008, and received political backing in 2012. The scheme include the reopening of the Portishead Line and increasing train frequency on the Severn Beach Line as part of phase 1;[5] the reopening of the Henbury line and increasing train services to Yate in phase 2.[6]

M4 Junction at Emersons Green

It has been long proposed for there to be a motorway junction linking the A4174 road (Avon ring road) to the M4 motorway near to Emersons Green as they pass very close. It has attracted support from the Kingswood MP [7]

Great Western Main Line electrification

As part of Crossrail the Great Western was already planned to be electrified from Airport Junction to Maidenhead but, following a number of announcements and delays the government announced in March 2011 that the line would be electrified between London and Cardiff together with the section linking Bristol Parkway and Bristol Temple Meads.[8][9] It is scheduled to be completed by 2017.

South Bristol ring road

There have been several proposals to extend the ring road from the junction with the A4 at Hicks Gate, Keynsham, along the southern edge of Bristol as far as the A370 at Long Ashton.

The 2005 Greater Bristol Strategic Transport Study, commissioned by the regional government office, recommended construction of the new southern route to tackle congestion. The proposals follow the route set aside west from Hengrove Park roundabout to the A38 at Castle Farm (phase 1), and from there to the A370 near Long Ashton Park and Ride (phase 2). There are additional recommendations (phase 3) for a new Whitchurch bypass from Hengrove Park roundabout, along the base of Dundry Hill, around Stockwood and joining the existing A4174 at Hicks Gate roundabout on the A4.[10] Phase one and two of the ring road are the only major road building schemes adopted by the Joint Local Transport Plan, which claimed they would reduce delays across the Greater Bristol area by 6%, and lead to a 9% increase in public transport use.[11] Bristol City Council has endorsed all three phases, and was hoping to begin construction of the first two phases in 2010 and 2011, and the third phase some time after 2016.[12] However, the plan has not been approved by the Department for Transport.[13] In January 2015, the Department for Transport approved plans for the construction of the South Bristol Link road,[14] as part of the MetroBus rapid transit scheme, with construction beginning in late 2015. It is estimated to be completed by 2016/2017.

See also

References

  1. "MetroBus Services". Travelwest. Retrieved 22 April 2016.
  2. "Bristol Airport hotel plan approved by councillors". BBC News. 14 October 2010.
  3. "Plans for airport hotel redrawn in new application". Bristol Post. 20 February 2014. Retrieved 24 April 2016.
  4. "New Bristol Airport terminal opens for business". Bristol Post. 3 July 2015. Retrieved 24 April 2016.
  5. "MetroWest Phase 1". Travelwest. Retrieved 24 April 2016.
  6. "MetroWest Phase 2". Travelwest. Retrieved 24 April 2016.
  7. http://www.kingswoodpeople.co.uk/news/Case-M4-link-road-Emersons-Green-says-Kingswood-s-MP/story-4550990-detail/story.html
  8. "Great Western electrification and IEP to go ahead". RailNews. Retrieved 11 October 2015.
  9. "Modernising the Great Western (page 9)" (PDF). Network Rail.
  10. Atkins, 2005. "Greater Bristol Strategic Transport Study." Chapter 6.
  11. B&NES, Bristol City, North Somerset and South Gloucestershire councils, 2006. "Joint Local Transport Plan." Chapter 6. (PDF)
  12. "South Bristol Ring Road" (PDF). Bristol City Council. February 2010. Retrieved 19 December 2010.
  13. "South Bristol Link". Travel plus. Retrieved 2011-01-13.
  14. "Business welcomes approval for South Bristol Link road scheme". Bristol Post. 20 January 2015. Retrieved 29 April 2016.
This article is issued from Wikipedia - version of the Thursday, May 05, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.