Quality, cost, delivery
Quality, cost, delivery (QCD), sometimes expanded to QCDMS (Quality, Cost, Delivery, Morale, Safety),[1] is a management approach originally developed to help companies within the British automobile sector. QCD analysis is used to access different components of the production process. It also provides accurate feedback in the form of facts and figures that help senior managers make logical and beneficial decisions. What's more is that by using the gathered data it's much easier for organizations to prioritize their future goals.[2]
The reason why QCD is such a popular approach is because it allows people to break down one big thing into many smaller ones, which helps organize and prioritize one's efforts and, psychologically, prevents the feeling of being overwhelmed.[3]
It is important to remember that QCD is a three dimensional approach. If there is a problem with even one dimension the other will inevitably suffer as well. One dimension cannot be sacrificed in the sake of the other two.[4]
Benefits of QCD
QCD offers a straight forward method of measuring processes while being applicable to both simple and complicated business processes. It also represents a basis for comparing businesses. For example a business measuring supplier delivery performance may easily compare its findings against other businesses performance.
QCDF
Flexibility is often included as a measure to QCD resulting in Quality, Cost, Delivery and Flexibility (QCDF). Flexibility relates to the capacity to adapt to changes / modifications . The modifications could be in a)input quality b) output quality c) product specifications d) delivery schedules.
Quality
Quality is the ability of a product or service to meet and exceed customer expectations. Customers' requirements determine the quality goals. It is almost always listed first, presumably because poor quality often results in bad business. Quality is the result of the efficiency of the entire production process formed of men, material, and machinery.
Even though quality is now seen as a competitive advantage, US business organizations in the 1970s tended to focus more on cost and productivity. That approach led to a major share of the US market being captured by Japanese business organizations, which ones again proves that in order to be successful an organization has to focus on the all three QCD dimensions all together.[5]
It wasn't until the late 1970s and the beginning of the 1980s when the factor “quality” was drastically shifted into being a strategic approach created by Harvard professor David Garvin.[6] This approach focuses on preventing any mistakes and, also, puts a great emphasis on customer satisfaction.[7]
Quality basis
Gavin lists eight dimensions of quality:[8][9]
- Performance
Performance is a product’s primary operating characteristics. For example, for a stereo those characteristics may be sound quality, surround sound, wifi connection etc.
- Conformance
Conformance refers to the degree to which a certain product meets the customer’s expectations.
- Special features
Those are any additional features of a product or service. In other words, extras. An example of an extra can be free food on an airplane, or free drinks at a museum visit. And for a TV, for example, it can be split screen, internet access, embedded apps etc.
- Aesthetics
The aesthetics refer to a product’s looks, sound, feel, smell, or taste. When it comes to aesthetics, complete customer satisfaction is simply impossible as it is very subjective. For example, one group of customers may like the smell of a certain perfume while other may find it completely repelling.
- Durability
The durability of a product is how long the product lasts before it has to be replaced. Durability can be improved by the usage of long life materials or improved technology processes in manufacturing. Some products are expected to be more durable than others. Those often include home appliances and automobiles for which durability is a primary characteristic of quality.
- Reliability
Reliability refers to the time until a product breaks down and has to be repaired, but not replaced. This feature is very important for products that have expensive maintenance.
- Serviceability
"Serviceability is defined by speed, courtesy, competence and ease of repair." [8] Customers usually want products that are relatively quickly and easily serviceable.[10]
- Perceived quality
The perceived quality may be affected by the high price or the good aesthetics of a product.
Product components
The quality of a product depends almost entirely on the quality of the supplied materials. One cannot produce a high-quality end product from low-quality components. Suppliers and companies must be willing to work together in order to reduce and eliminate errors and defects, and achieve higher quality end product. SMEs should discuss with their suppliers how quality improvements can affect the overall performance of the supply chain. A properly implemented quality procedure can reduce testing, scrap, rework etc. This could result in reduction of production costs.[11]
Consequences of poor quality
- Business loss
Poor quality often results in unsatisfied customers which leads to business loss. In an environment where the customer can easily switch to a competitor, producing poor-quality product can be fatal to an organization.
- Productivity
Poor-quality products must often be reworked or scrapped entirely which reduces the amount of usable output.
Costs
The biggest cost in most business organizations is the manufacturing cost. Production has a direct responsibility when it comes to controlling and reducing manufacturing cost.[4]
There are four basic types of manufacturing costs:[13]
- Raw materials
- Direct labour
- Variable overhead - production costs that increase or decrease depending on the quantity produced. For example, electricity is a variable overhead. If a company increases its production process they would have also increased the usage of the equipment which will result in a higher electricity bill.
- Fixed overhead
Those are the production cost that stay the same even if the quantity produced increases or decreases. Those costs include:
- Salaries for employees that don't work directly on the production line. E.g. security guards, safety inspectors, etc.
- Depreciation costs
- Occupancy costs - property taxes, building insurance, etc.
Cost reduction
Businesses have been under the pressure to drive down costs in order to be more competitive for many years. There are many books and articles nowadays that suggest different ways of reducing costs, some of them are as follows:
- Minimizing supplier costs [14]
- Adopting lean manufacturing [15]
- Eliminating waste [16]
Delivery
Logistics are an essential part in providing good customer service:[17][18]
Logistics customer service can be separated into three elements (before, during and after delivery of the product):
- Pre-transaction elements
- Transaction elements
- Post-transaction elements
Increasing profitability with QCD
There are seven measures used to increase profitability:[19]
- Not right first time (NRFT) [20]
Not getting things right first time means wasted resources, effort and time. This all leads to excessive costs to the company and poor quality, high-priced products to the customer. NRFT measures the quality of a product and is expressed in “number of defect parts per million”. The number of defective products is divided by the total quantity of finished products. This figure is then multiplied by 10^6 to get the number of defective parts per million.[2]
NRFT can be measured internally (defective parts identified within the production process) or externally (defective parts identified outside the production process, e.g. by the supplier or the customer).[21]
- Delivery schedule achievement (DSA)
DSA analyses how well a supplier delivers what the customer wants and when they want it. The goal is to achieve 100% on-time delivery without any special deliveries or overtime payments which only increase the delivery cost. DSA measures the actual delivery performance against the planned delivery schedule.[2] Failed deliveries include:
- "Not on time" deliveries - both late and early.
- "Incorrect quantity deliveries".
- Both "not on time" and "incorrect quantity deliveries".[21]
- People productivity (PP)
PP is measured by the time it takes (in staff hours) to produce a good quality product. Obtaining high PP is only possible when:
- Most employees' work is adding value to the process.
- Non-value added work is reduced as much as possible.
- Waste is completely eliminated .[21]
- Stock turns (ST)
The ST ratio shows how quickly a company turns raw materials to finished, ready to be sold products. The quicker the better. A low ST means that the money is tied up in stock, and the company has fewer funds to invest in other parts of its business.[2]
- Overall equipment effectiveness (OEE)
The OEE shows how well a company uses its equipment and staff.
OEE is calculated on the base of three elements:
- Availability - compares the planned and the actual time of the process run. For example, if a machine is planned to run 100 hours a week, but in reality runs only 50, then the availability is 50%.[2]
- Performance – compares the ideal output and the actual output. For example, if a certain process is planned to take 10 minutes, but actually takes 20, then the productivity is 50%.[2]
- Quality – to show the quality of a product, a company has to compare the number of good parts produced with the total parts produced. If it produces a 100 parts per hour but only 50 of them are with saleable standard, then quality is running at 50%.[2]
- Value added per person (VAPP)
VAPP shows how well people are used to turn raw materials into finished goods. In order to calculate VAPP three things need to be taken into account:
- The sales value of a unit after production (output value).
- The raw material value of a unit before production (input value).
- The number of direct production process employees.[21]
- Floor space utilisation (FSU) [22]
FSU measures the sales revenue generated by a square meter of factory floor space. Usually to achieve higher FSU the floor space has to be reduced. That means eliminating inventory and reducing the necessary space to a minimum.[21]
External links
References
- ↑ Imai, Masaaki (1997). Gemba Kaizen: A Commonsense, Low-Cost Approach to Management. McGraw Hill Professional. p. 109. ISBN 9780071368162.
- 1 2 3 4 5 6 7 "QCD – Quality, Cost and Delivery". Retrieved 20 October 2015.
- ↑ "QCD / Quality, Cost, Delivery". Retrieved 31 October 2015.
- 1 2 Domingo, Rene T. "THE QCD APPROACH TO OPERATIONS MANAGEMENT". Retrieved 25 October 2015.
- ↑ Tomaskovic-Devey, Donald; Lin, Ken-Hou (August 2011). "Income Dynamics, Economic Rents, and the Financialization of the U.S. Economy". American Sociological Review (American Sociological Association) 76 (4): 538–559.
- ↑ Garvin, David A. (November 1987). "Competing on the Eight Dimensions of Quality". Harvard Business Review. Retrieved 3 November 2015.
- 1 2 "Operations management:Quality". Retrieved 1 November 2015.
- 1 2 "Operations Strategy". Retrieved 27 October 2015.
- ↑ Gupta, Sushil; Starr, Martin (2014). Production and operations management systems. [S.l.]: CRC Press. pp. 279–280. ISBN 9781466507333. Retrieved 3 November 2015.
- ↑ Gupta, Sushil; Starr, Martin (2014). Production and operations management systems. [S.l.]: CRC Press. p. 282. ISBN 9781466507333. Retrieved 3 November 2015.
- ↑ Council, Committee on Supply Chain Integration, Board on Manufacturing and Engineering Design, Commission on Engineering and Technical Systems, National Research (2000). Surviving supply chain integration : strategies for small manufacturers. Washington, DC: National Acad.Press. p. 52. ISBN 978-0309068789. Retrieved 27 October 2015.
- ↑ Gupta, Sushil; Starr, Martin (2014). Production and operations management systems. [S.l.]: CRC Press. p. 288. ISBN 9781466507333. Retrieved 3 November 2015.
- ↑ Shim, Jae K. Shim, Joel G. Siegel, Allison I. (2012). Budgeting basics and beyond (4th ed.). Hoboken, N.J.: Wiley. pp. 191–202. ISBN 9781118387023. Retrieved 4 November 2015.
- ↑ Berk, Joseph (2010). Cost reduction and optimization for manufacturing and industrial companies. Hoboken, N.J.: John Wiley. pp. 117–124. ISBN 9780470643815. Retrieved 3 November 2015.
- ↑ Alves, José Roberto Xavier; Alves, João Murta (21 April 2015). "Production management model integrating the principles of lean manufacturing and sustainability supported by the cultural transformation of a company". International Journal of Production Research 53 (17). 2.3 The system of lean manufacturing. doi:10.1080/00207543.2015.1033032. Retrieved 3 November 2015.
- ↑ Bragg, Steven M. (2011). "5S ANALYSIS". The controller's function the work of the managerial accountant (4th ed.). Hoboken, N.J.: Wiley. pp. 423–424. ISBN 9781118268377. Retrieved 3 November 2015.
- ↑ Baker, Alan Rushton, Phil Croucher, Peter (2014). The handbook of logistics & distribution management (5th ed.). London: KoganPage. p. 35. ISBN 0749466278. Retrieved 4 November 2015.
- ↑ Voortman, Craig (2004). Global logistics management. Cape Town: Juta Academic. pp. 23–26. ISBN 0702166413.
- ↑ Osman, Ibrahim; Anouze,, Abdel Latef; editors, Ali Emrouznejad, (2014). Strategic performance management and measurement using data envelopment analysis. pp. 132–133. ISBN 1466644745. Retrieved 4 November 2015.
- ↑ Morgan, Colin; Murgatroyd, Stephen J. (1994). Total quality management in the public sector : an international perspective. ([4th ]reprint. ed.). Buckingham, En: Open University Press. pp. 43–44. ISBN 9780335191024. Retrieved 4 November 2015.
- 1 2 3 4 5 "QCD: measuring manufacturing performance" (PDF). Retrieved 2 November 2015.
- ↑ LARSON, T. NICK; MARCH, HEATHER; KUSIAK, ANDREW (April 1997). "A heuristic approach to warehouse layout with class-based storage". IIE Transactions 29 (4): 337–348. doi:10.1080/07408179708966339.