Redlands Passenger Rail Project

The Redlands Passenger Rail Project (RPRP) is the temporary name[1] for a proposed passenger rail line in San Bernardino County, California, United States. It is planned to operate between the San Bernardino Transit Center in San Bernardino and the University of Redlands in Redlands, California.

History

Proposals for a rail connection between the two cities have been made as early as the 1990s with the service projected to start in 1995. This date has progressively moved to 2013, 2015, and 2018. As of 2015, the line is expected to be complete and operating in 2020.[2][3][4]

The 9-mile (14 km) route will use the former Atchison, Topeka and Santa Fe Railway line.[2][3] While mostly single track, 2 miles (3.2 km) of double track will be constructed in the middle to allow vehicles to pass each other.[4] Five initial stops are proposed: three in Redlands and two in San Bernardino, with an initial ridership of between 1,600 and 1,800 passengers daily.[2] With connecting service to Metrolink in San Bernardino at the Santa Fe Depot, the five new stations would be: the San Bernardino Transit Center, Waterman Avenue next to the Inland Regional Center, New York Street near Esri, downtown Redlands, and the University of Redlands.[4][5] Low-volume BNSF freight service will continue on a portion of the route.[6]

In September 2010, the San Bernardino Associated Governments (SANBAG) considered options that included Metrolink train service, other types of electrified or diesel trains, and buses.[7] In April 2011, SANBAG announced that it had settled on conventional heavy rail equipment for the service.[2] While electrified light rail was preferred, its $268.1 million cost was over the $250 million limit for the federal Small Starts transit grants that would have been used.[2] The estimated cost of heavy rail service was $198.6 million which could be paid for using federal transportation grants that were based on population and sales tax revenues.[2] By 2011, the estimated cost of construction had dropped to an estimate of between $130 million and $150 million.[3]

The first contract for the project was awarded on November 2, 2011, by SANBAG to HDR, Inc. for engineering and environmental services.[6] The contract was an amendment to an existing contract for HDR to work on a separate project in the region, the extension of Metrolink's San Bernardino Line to a new terminus at the San Bernardino Intermodal Transit Center.[6] Work was initially expected to begin in late 2012 or 2013,[8] with the estimated start of service ranging from 2015[3] to as late as 2018.

The project has encountered numerous delays, including the government shutdown in October 2013, at which point the construction was slated to begin in fall of 2016.[9] In February 2014, the project was delayed again, when SANBAG stated that "construction is planned to begin in late 2015 with operation in 2018."[10] As of December 2015, construction was planned to begin in 2017 and service in 2020.[5][11]

Future development

The first phase of construction will include replacing all track on the line, rebuilding five bridges, and installing 24 grade crossings.[2] Service was originally planned to begin with refurbished ex-Metrolink rolling stock[8] operating on 30-minute peak period headways and hourly off-peak headways.[3] Due to community opposition, SANBAG decided to use diesel multiple units as of December 2015.[4][5][11]

As of 2011, phase two of the project would see light rail vehicles or diesel multiple units replace the conventional rolling stock, the construction of five more stations, and additional passing sidings to allow 15-minute peak period headways and 30-minute off-peak headways.[3] The estimated construction cost is between $80 million and $100 million for light rail or between $225 million and $300 million for diesel multiple units.[3] Running costs would be between $11 million and $14 million for light rail or between $12 million and $16 million for diesel multiple units.[3] A potential further phase would expand trackage in a loop to Highland and the San Bernardino International Airport before returning to downtown San Bernardino.[8]

References

  1. Emerson, Sandra (2015-05-06). "Redlands City Council updated on Redlands Passenger Rail project". Redlands Daily Facts. Retrieved 2016-03-16.
  2. 1 2 3 4 5 6 7 MacDuff, Cassie (16 May 2011). "Imperfect Rail Solution". The Press-Enterprise (Riverside, California: Press-Enterprise Corporation). Archived from the original on 4 November 2011. Retrieved 5 November 2011.
  3. 1 2 3 4 5 6 7 8 "Contract awarded for California commuter line". Trains (Waukesha, Wisconsin: Kalmbach Publishing). 2 November 2011. Retrieved 6 November 2011.
  4. 1 2 3 4 Emerson, Sandra (September 15, 2015). "SanBAG gives updates on cost, timeline of Redlands rail project". Redlands Daily Facts. Retrieved 17 December 2015.
  5. 1 2 3 "Redlands Passenger Rail Project" (PDF). SANBAG. Retrieved 2016-03-16.
  6. 1 2 3 "Redlands Passenger Rail Project contract awarded". Railway Gazette International (Sutton, Surrey: DVV Media UK Ltd). 2 November 2011. Archived from the original on 5 November 2011. Retrieved 6 November 2011.
  7. Sears, Jan (9 September 2010). "Passenger rail connection to Redlands still years away". The Press-Enterprise (Riverside, California: Press-Enterprise Corporation). Archived from the original on 5 November 2011. Retrieved 6 November 2011.
  8. 1 2 3 Sears, Jan (8 May 2011). "TRANSPORTATION: Metrolink trains will connect Redlands, San Bernardino". The Press-Enterprise (Riverside, California: Press-Enterprise Corporation). Archived from the original on 5 November 2011. Retrieved 6 November 2011.
  9. Waldner, Erin (1 November 2013). "REDLANDS: Passenger Rail Plan Slowed by Shutdown". The Press-Enterprise (Riverside, California: Press-Enterprise Corporation). Archived from the original on 15 January 2014. Retrieved 15 January 2014.
  10. "Redlands Passenger Rail Project Fact Sheet". San Bernardino, California: San Bernardino Associated Governments. 26 February 2014. Archived from the original (PDF) on 22 April 2014. Retrieved 21 April 2014.
  11. 1 2 Emerson, Sandra (2015-11-07). "SanBAG begins design of Redlands Passenger Rail Project". Redlands Daily Facts. Retrieved 2016-03-16.

External links

This article is issued from Wikipedia - version of the Thursday, March 31, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.