SEACOM (African cable system)

SEACOM
Owners:
76.25 % African investors; 23.75 % Herakles Telecom[1]

Landing points

see the landing points section
Design capacity 4.2 Tbit/s[2]
Currently lit capacity 100 Gbit/s[3]
Technology Fiber optics
Date of first use July 23, 2009 (2009-07-23)
SEACOM-Logo

SEACOM is a submarine cable operator with a network of submarine and terrestrial high-speed fibre-optic cable that serves the East and West coasts of Africa. SEACOM’s reach extends into Europe and the Asia-Pacific via India. The Pan-African network uses bundled backhaul, open access PoP's (Points of Presence) and global partnerships to provide end-to-end wholesale and enterprise connectivity around the world for African and international network and content operators.

In-service since July 2009, SEACOM has increased the availability of international bandwidth ten-fold, and more so in many of Africa’s most under-served nations. The only privately funded and truly neutral carrier in its market, SEACOM also offers a comprehensive suite of IP/MPLS (Internet Protocol & Multi-Protocol Label Switching) and clear channel services to the wholesale and enterprise segments.

Cable structure and technology

Express fibre pairs are provided from Kenya to France to a PoP in Marseille, as well as from Tanzania to India into a PoP in Mumbai.

SEACOM has also built an on-net, European network, managed and operated by themselves, to deliver a mixture of Transport and IP/MPLS services to/from Africa from/to the following cities in Europe:

Through partnership with 3rd party networks in Europe, SEACOM are able to deliver services to other locations in Europe not covered in the list of cities, above.

The SEACOM cable is deployed with a mixture of double armour cable, single armour cable, special protection cable (with a metallic wrap below the insulator, rather than steel wires), and lightweight cable without armour, used in deep waters. Shallower water cable typically has more protective armour than offshore, deeper cable.

The cable is a loose tube design that determines the amount and relative location along the transmission path of each type of fibre. Multiple fibre types are used in the cable: dispersion shifted and non-dispersion shifted.

The repeaters are optical amplifier repeaters, using erbium-doped amplifiers. There are over 150 repeaters in the SEACOM system. They are spaced along the cable many tens of kilometres apart with the distance between repeaters varying depending on the segment in the system. Repeater spacing is determined by a variety of factors, including the transmission capacity of the fibres in the cable and the distance between SLTE's (Submarine Line Terminal Equipment).

On 23 July 2009, the 17,000km (9,300mi) sub-sea fibre optic cable began operations, providing the eastern and southern African countries of Djibouti, Kenya, Tanzania, Mozambique and South Africa with high-speed Internet connectivity to Europe and Asia. The cable was officially switched on in simultaneous events held across the region, in Mombasa and Dar Es Salaam.

Upon being switched on, the owners of the cable stated that it would reduce Internet costs by up to 95% to wholesale customers while providing a far greater speed of Internet connection. It may take a long time for the benefits to reach ordinary citizens, particularly those who live in remote rural areas.

Project funding

SEACOM is privately funded, and ~75% African owned. Initial private investment in the SEACOM project was US$$375-million: $75-million from the developers, $150-million from private South African investors and $75-million as a commercial loan from Nedbank (South Africa). The remaining US$75m was made by Industrial Promotion Services (IPS), the industrial and infrastructure arm of the Aga Khan Fund for Economic Development (AKFED). The IPS investment was funded by $15m equity, and a total of US$60.4m debt from the Emerging Africa Infrastructure Fund (EAIF) and the FMO.[4]

Current ownership structure is as follows: Industrial Promotion Services with 26.56%, Remgro Limited 25%, whilst Convergence Partners and Shanduka hold 12.5% each. Herakles Telecom LLC holds a 23.44% stake in the project.[5]

The cable is variously described as a $600- and a $650-million project, and has seen a number of upgrades to landing station infrastructure, national backhaul and increases to carrying capacity, with an increase to 2.6Tbit/s in May 2012,[6] with the intention to double this by mid-2013.

Landing points

SEACOM-Network Map

The cable landing points are:

In addition, as of May 2012, backhaul solutions allow onwards connectivity from the coastal landing points to:

SEACOM Partner Network landing points include:

Social and economic implications

East Africa has been one of the last significant regions lacking broadband Internet access. Broadband access is expected to narrow the digital divide between Africa and wealthier geopolitical regions and is also expected to be a major advantage to many local industries, particularly those based on offshoring.

See also

References

External links

Wikimedia Commons has media related to SEACOM (African cable system).
This article is issued from Wikipedia - version of the Sunday, April 24, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.